Loading...
HomeMy WebLinkAboutFile Documents.1050 Matchless Dr.0113-2020-BRES (21) GEOTECHNICAL ENGINEERING REPORT GARAGES RACQUET CLUB CONDOMINIUMS 1040 & 1050 MATCHLESS DRIVE ASPEN, COLORADO November 5, 2019 kr, ,..-'3,,m,.:..:- . -. • tr yam.. ; o° e 4 t• r -,,, ) "� a „, -s 70II L '. x y e iy • y, i� _Imo. si --.} 6, s� •�,' _ _ ...fix _ t.. _ rri .. ry .. '�.uz_ .—, --ram . P_ 4 .xt.,,,4t.... Prepared By: Prepared For: Engineering Racquet Club Condominium Assoc. 286 Red cliff CI Ge 1040 & 1050 Matchless Drive &Consulting,Inc. Glenwcwd SPnnga,CG A1601 P:(970)230-9208 Aspen, CO 81611 Project No. 19-038G-G1 RECEIVED 05/01/2020 ASPEN BUILDING DEPARTMENT 1040& 1050 Matchless Drive Project No. 19-038G-G1 Aspen,Colorado TABLE OF CONTENTS 1.0 PROJECT INFORMATION 1 1.1 Purpose and Scope 1 1.2 Proposed Construction 1 1.3 Site Conditions 1 2.0 SITE INVESTIGATION 2 2.1 Subsurface Investigation 2 2.2 Subsurface Conditions 2 2.2.1 Groundwater 3 3.0 SITE GRADING 3 4.0 FOUNDATION RECOMMENDATIONS 4 4.1 Foundations placed on Natural Soils 4 5.0 FOUNDATION AND RETAINING WALLS 5 6.0 FLOOR SLABS 5 7.0 CONCRETE 6 8.0 SURFACE DRAINAGE 6 9.0 LIMITATIONS 6 LIST OF FIGURES Figure 1 —Approximate Test Hole Locations Figure 2 —Test Hole Logs and Legend Summary of Laboratory Test Results roiF i R✓ /O1/2020 ASPEN BUILDING DEPARTMENT 1040& 1050 Matchless Drive Project No. 19-038G-G1 Aspen,Colorado 1.0 PROJECT INFORMATION 1.1 Purpose and Scope This report presents the results of our geotechnical investigation and recommendations for design and construction of two garage structures at 1040 & 1050 Matchless Drive in Aspen, Colorado. The investigation was performed to provide foundation and construction recommendations for the proposed garages. The site investigation consisted of geologic reconnaissance and exploratory test hole drilling to investigate subsurface conditions. Test hole drilling was observed by a representative of RJ Engineering. Samples obtained during the field exploration were examined by the project personnel and representative samples were subjected to laboratory testing to determine the engineering characteristics of materials encountered. This report summarizes our field investigation, the results of our analyses, and our conclusions and recommendations based on the proposed construction, site reconnaissance, subsurface investigation, and results of the laboratory testing. 1.2 Proposed Construction We anticipate the structures will not have below grade areas and excavation depths will likely be on the order of 5 feet below grade. Plans indicate the back walls of the structure will act as retaining walls where an existing timber crib wall is located. 1.3 Site Conditions The site consists of an asphalt paved parking lot. A timber crib retaining wall is located along the north side of the parking lot. The timber crib wall is about 4-5 feet in height. The condominium buildings are located on the south side of the parking lot. Grades are relatively flat where the garages are planned. The site is landscaped around the parking lot and condominium buildings. 1 R✓ /O1/2020 ASPEN BUILDING DEPARTMENT 1040& 1050 Matchless Drive Project No. 19-038G-G1 Aspen,Colorado 2.0 SITE INVESTIGATION 2.1 Subsurface Investigation Two test holes were drilled on October 17, 2019. The test holes were drilled as close to the center of the proposed structures as possible. We were unable to drill near the center of the east garage because a vehicle was parked in that area. The approximate test hole locations are presented on Figure 1. The test holes were advanced with a Diedrich D90 track mounted rig using 4-inch continuous flight auger where modified California or a standard split spoon sampler was used to record blow counts and obtain samples. Test hole logs are presented on Figure 2. To perform the modified California penetration resistance tests, a 2.0-inch inside diameter sampler was seated at the bottom of the test hole, then driven up to 12 inches with blows of a standard hammer weighing 140 pounds and falling a distance of 30 inches utilizing an "auto" hammer (ASTM D1586). The number of blows (Blow Count) required to drive the sampler 12 inches or a fraction thereof, constitutes the N-value. The N-value, when properly evaluated, is an index of the consistency or relative density of the material tested. Split spoon samples are obtained in the same manner, but with a 1.5-inch inside diameter sampler. The test hole logs and legend are presented on Figure 2. 2.2 Subsurface Conditions Subsurface conditions encountered in test holes TH-1 and TH-2 consisted of 5 feet of silty sand fill underlain by natural silty sand and gravel to the maximum explored depths of 12 and 8 feet, respectively, where practical drill rig refusal was encountered. The fill consisted of a silty sand with gravel and occasional cobbles and was loose to medium dense. The natural silty sand contained gravel with abundant cobbles and boulders and was dense to very dense. Two fill samples had 22 and 29 percent fines (material passing the No. 200 sieve). Atterberg limit testing indicated the fill was non-liquid and non-plastic. One natural sand sample had 16 percent fines. Atterberg limit testing indicated the natural sand had a liquid limit of 36 and a plasticity index of 11. The fill samples classified as a silty sand (SM), and the natural sand sample classified as a silty sand (SM) according to the Unified Soil Classification System I R✓ 2 /O1/2020 ASPEN BUILDING DEPARTMENT 1040& 1050 Matchless Drive Project No. 19-038G-G1 Aspen,Colorado (USCS). Results of the laboratory testing are summarized in the Summary of Laboratory Test Results. 2.2.1 Groundwater Groundwater was not encountered during drilling, and the test holes were backfilled for safety reasons. We do not anticipate groundwater will be encountered to planned excavation depths. Variations in groundwater conditions may occur seasonally. The magnitude of the variation will be largely dependent upon the amount of spring snowmelt, duration and intensity of precipitation, site grading changes, and the surface and subsurface drainage characteristics of the surrounding area. 3.0 SITE GRADING Fills are likely planned at this site to achieve finished grades. Grading plans were not available at the time of this investigation. Based on drilling and our observations, we believe that material can be excavated by conventional construction equipment. Large boulders may be encountered during excavation. The boulders may be of such size that on site splitting may be required before conventional equipment could remove the material. We recommend fill slopes be constructed at 2H:1V or flatter. Fill slopes should be protected from erosion. Surface drainage should be directed around slopes. Surface water ponding behind or flowing over the face of fill slopes may cause significant erosion and instability. The on-site soils can be used in site grading fills provided the material is substantially free of organic material, debris and particles are no larger than 6 inches. Areas to receive fill should be stripped of vegetation, organic soils and debris. Topsoil is not recommended for fill material. Imported granular soils should contain less than 30 percent fines (passing No. 200 sieve) and a maximum particle size of 6 inches. Fill should be placed in thin, loose lifts of 8 inches thick or less. We recommend fill materials be moisture conditioned to within 2 percent of optimum moisture content and compacted to at least 95 percent of maximum standard Proctor dry density (ASTM D 698). Placement and compaction of fill should be observed and tested by a geotechnical engineer. F1 1 ; ,4t1 L ; 3 ✓ /01/2020 ASPEN BUILDING DEPARTMENT 1040& 1050 Matchless Drive Project No. 19-038G-G1 Aspen,Colorado 4.0 FOUNDATION RECOMMENDATIONS We believe that the natural sands with gravels, cobbles and boulders encountered at the site are comparatively favorable for the proposed construction. Existing fill soils are not suitable for support of foundations. Foundations should be placed on natural sand and gravel soils and not on existing fill soils. We recommend foundations be placed at least 5 feet below existing grade or at the natural sand soils, whichever is deeper. As an alternative, existing fill soils could be removed and replaced with properly placed fill in accordance with section 3.0 of this report. Foundation recommendations for structures supported by the natural soils are presented below. 4.1 Foundations placed on Natural Soils Foundations should be constructed on undisturbed natural soils at a depth of at least 5 feet below existing grade. Existing fill or loose, disturbed soils encountered at foundation level should be removed and the foundation should be extended to natural soils and/or replaced with properly compacted fill. We recommend fill be placed in accordance with the specifications presented in section 3.0. 1. Footings should be placed on undisturbed natural sand and gravel soils or properly placed fill. Foundations can be designed for a maximum allowable soil pressure of 3,000 psf. Based on experience, we anticipate settlement of footings designed and constructed as recommended will be about 1-inch or less. 2. Continuous footings should have a minimum width of 16 inches and isolated pads should have a minimum dimension of 2 feet. 3. The soils below foundations should be protected from freezing. We recommend the bottom of foundations be constructed at least 3.5 feet below finished exterior grade or as required by local municipal code. 4. Continuous foundation walls shall be reinforced to span anomalies by assuming an unsupported distance of 10 feet. Foundation walls acting as retaining structures should be designed to resist lateral earth pressures as discussed in section 5.0 below. 5. All foundation excavations should be observed by a representative of a geotechnical engineer prior to placement of concrete. 4 R✓ /O1/2020 ASPEN BUILDING DEPARTMENT 1040& 1050 Matchless Drive Project No. 19-038G-G1 Aspen,Colorado 5.0 FOUNDATION AND RETAINING WALLS Retaining and below grade walls should be designed to resist lateral earth pressure. Cast-in- place foundation and retaining walls can be backfilled with on-site granular soils meeting recommendations in section 3.0. For a horizontal backslope with properly placed and compacted fill, the unfactored earth pressure can be estimated using an equivalent fluid pressure of 45 pcf for the active condition and 60 pcf for an at-rest condition. Site retaining walls which are separate from the structure and can be expected to deflect to mobilize the full active earth pressure condition could be designed using an equivalent fluid pressure of 45 pcf. These values assume that the backfill materials are not saturated. Wall designs should consider the influence of surcharge loading such as traffic, construction equipment and/or sloping backfill. The lateral resistance of foundations for retaining walls are a combination of sliding resistance of the footing on foundation materials and passive earth pressure at the toe of the wall. Sliding resistance could be calculated based on a coefficient of friction of 0.45. Passive pressure for natural soils or compacted fill can be determined using an equivalent fluid pressure of 400 pcf. Retaining walls and structures should be constructed with a drainage system to drain away any excess water immediately behind the wall. The drainage system may consist of free-draining gravel, pipes, drain board and/or weep holes are commonly used for wall drainage. 6.0 FLOOR SLABS The existing fill and natural on-site soils are suitable to support lightly loaded slab-on-grade construction. To reduce distress associated with minor differential movement, floor slabs should be separated from all bearing walls and columns with expansion joints which provide unrestricted vertical movement. A minimum 4-inch layer of free draining gravel should be placed beneath lower level slabs. The free draining gravel should have less than 2 percent passing the No. 200 sieve, less than 50 percent passing the No. 4 sieve and have a maximum size of 2 inches. All fill placed below floor slabs should be moisture conditioned and compacted in accordance with the recommendations in section 3.0. I R✓ 5 /O1/2020 ASPEN BUILDING DEPARTMENT 1040& 1050 Matchless Drive Project No. 19-038G-G1 Aspen,Colorado 7.0 CONCRETE Typically, for materials encountered at this site, the concentration of water-soluble sulfate is negligible/low (Class 0 exposure) degree of sulfate attack for concrete exposed to these materials. The degree of attack is based on a range of 0.00 to less than 0.10 percent water- soluble sulfates as presented in the American Concrete Institute Guide to Durable Concrete. Due to the negligible/low degree, no special requirements for concrete are necessary for this site. 8.0 SURFACE DRAINAGE Surface drainage is crucial to the performance of foundations and flatwork. We recommend the ground surface surrounding the building be sloped to drain away from the structure. We recommend a slope of at least 6 inches in the first 10 feet for landscape and unpaved areas and a minimum slope of 2 percent for paved areas. Irrigation should not be discharged within 5 feet of foundation walls. Backfill around foundations should be moisture conditioned and compacted as recommended in the section 3.0. Roof downspouts and drains should discharge beyond the wall backfill area. 9.0 LIMITATIONS This study was conducted in accordance with generally accepted geotechnical engineering practices in this area for use by the client for design purposes. The conclusions and recommendations submitted in this report are based upon the data obtained from exploratory test holes, field reconnaissance and anticipated construction. The nature and extent of subsurface variations across the site may not become evident until excavation is performed. If during construction, conditions appear to be different from those described herein; this office should be advised at once so reevaluation of the recommendations may be made. We recommend on-site observation of excavations by a representative of the geotechnical engineer. The scope of services for this project did not include, specifically or by implication, any environmental or biological (e.g., mold, fungi, and bacteria) assessment of the site or identification or prevention of pollutants, hazardous materials or conditions or biological I 6 R✓ /O1/2020 ASPEN BUILDING DEPARTMENT 1040& 1050 Matchless Drive Project No. 19-038G-G1 Aspen,Colorado conditions. If the owner is concerned about the potential for such contamination, conditions or pollution, other studies should be undertaken. The report was prepared in substantial accordance with the generally accepted standards of practice for geotechnical engineering as exist in the site area at the time of our investigation. No warranties, express or implied, are intended or made. Respectfully Submitted, RJ Engineering & Consulting, Inc. Richard D. Johnson, P.E. Principal 1 r �� 41NJ �l 7 ✓ /O1/2020 ASPEN BUILDING DEPARTMENT 81 SF REMAINING-LOTS !-= __-b ntMMININ�-Lv.y \ \ 11 / \ I -----_ ___Tars______________________ \ /-, „' 1 —-—-—- --- - '- -- -- - - - --- - -- _- -1,—'' \ �/- I-\ '' ' !4t1 '. g) li \ 1 1 i 11\• .fr : ,"-, ,--- --•\ •- • s •• 4,4 \ \�\ �_ ,2 CAR GA• o 2 CAR GARAGE \ I 2 CAR GARAG?I `" ` \ \` I \`\\ \ OR UNI OR UNITS ' 1� 1 OR UNITS • ::U"'II. '� I \ , 1\ \ I J I 1 I Y ,\ 1 \ NV JA•/i�•A•{S-i•A•A•M.• I 1 \ I I \ I ���°i4i•00�•ii•O�•�� 111 \• :,...IN, 1 M14��{J{{A{{{► I I I \ \ I I I Al 1 •t{{•••{{••{ 1 1 1 \\ \\ I \ \ ;;::::::::::.•„...0::+4:::11 \ 1 11II e \ Cora \ �oTz \//� 3\ 15,B10 S0 SF \ �-0" I15.90]SF ' /� 1 •{AA• ► 1�I 'I .: _ \ \ AA{{AA{{{AAA \ \ 1 1 I I I I 1 1 P{AA{{{{A{{{{ \ 1 i 1 "OAF 4011i-F-1‘ -------- I -...---1-11--- ' - 7+1 I I -... , .: i \••: AA{ AAA4.-..... I I' • ...--,--..i, I ,,, , 1 , ..,iiiii. :.....:44..: e:. ‘ 1'1 \ ` I 1 �-1� \ I \\ I I \ ' ��{JA•{�{•t•{•A•••••••A• 1 '1 I I I \ \ `' I / I I ���`♦ \ \ I 1 \ 1 VP{i4{AAA•••{•{•A•A••{A •'. I \ \ \ /1// / / i Ay =---- = - 11 %Ai.,. 1 ....\.\ \ .\. ,...., , , , h ,,,\ •-• . - I I I \ or„,09"" 211E ks.. . N' 1111174, 1 / ' /7414 \ \ 1 A 1\ \\ \ \ ; / I V � 1 1 V 'r 4 \ V 1 , 1 / 1 1' I li L I a — dir'''AY0- . IIIT S 7Ak • 1 \ ` I 1/ \ —\ I\ \ ` \• I,,1 111 \ \ \ \ , '1 \ \ \ � UNIT2 II / ' \ \ \. 1=11' 1 1 1 \ 1 II 12 ZZ Is UNITS \ / N y -I1 11 1 1 \ -- — — I II I I i I .. f \ \ 11 i • ,I}- - / I DUPLEX 13 \ I %% I _ { \ I, //1 � I I 1 1 / , I 1 II I UNIT I • •. .1I \ / I / Ir`b �i' I.,,� \ I. _,1. i I 7�_._� I \ 1 , 1 I L—_ I 1 1 I I \1 \ \ 1 � ` `\ I 11 .gI I \�\ 1 I\ I I 1 1 / I `\` 1/ [ '\1I I 111 \ oh) / I IkLi 711111 c\ I 1 i- \\1, / 3 LEGEND: PROJECT NO: PROJECT 19-038G G1 1040& 1050 Matchless Drive,Aspen TH-1 Indicates approximate test hole location o 10' 20' �� C���� ® NJ` Approximate -� I U re NOTES: ,r SCALE: 1" =20' a 1. Base plan by Bryan May Architecture. Test est Hole Locations5/01/ 2020 ASPEN BUILDING DEPARTMENT TH-1 TH-2 0 �1 0 — � — Sample Types • Modified California Sampler. The symbol 7/12 indicates that 7 — 07/12 blows from a 140 pound hammer falling 30 inches was used to _ _ _ drive a 2-inch I.D.sampler 12 inches. .117/12 19/12 5 �� 5 ,,O; i — — Other Symbols — IP 4 — it Indicates practical drill rig refusal. 10 — 4.I48/12 10 Soil Lithology - K.LA - FILL,SAND,silty to clayey,gravelly,occasional cobbles and � — boulders,slightly moist to moist,loose to medium dense,brown,black Rom — — .Aim SAND AND GRAVEL,slightly silty to silty,abundant cobbles and 15 15 boulders,slightly moist,dense to very dense,brown,light brown �;. � � Zi 1") _ - o 0 -- 20 20 25 25 30 30 35 35 - - NOTES: 1. The test hole was drilled on October 17,2019 with 4-inch continuous — — flight auger. 2. Test hole descriptions are subject to explanations contained in this — report. 40 40 LOGS OF EXPLORATORY BORINGS RECEIVED Project: R Engineering 1040 & 1050 Matchless Drive 19-038G-G1 &Consulting, Inc. Aspen, Colorado 0 5/O 1/i2r0?0 ASPEN BUILDING DEPARTMENT RJ Engineering & Consulting, Inc. Summary of Laboratory Test Results Project No: 19-038G-G1 Project Name: 1040 & 1050 Matchless Drive, Aspen Sample Location Grain Size Analysis Atterberg Limits Water Swell (+)/ Moisture Dry •Gravel Fines Soluble Consoli-dation Test Sample Content Density Sand LL PL PI Description Depth (ft) o >#4 0 (%) (%) (%) <#200 Sulfate (-)at 1,000 psf Hole Type (/o) (pcf) (%) (/o) (%) (%) (%) TH-1 4 CA 13.9 108 29 FILL, sand, silty to clayey 9 CA 7.2 126 16 36 25 11 SAND, gravelly TH-2 4 CA 7.2 120 22 NL NP NP FILL, sand, silty to clayey • • • *Laboratory testing by others RECEIVED CA-Indicates modified California sampler // 2020 NL-Indicates non-liquid LJ-t n N . •� . NP-Indicates non-plastic Page 1 of 1 BUI C.::) ARTMENT