Loading...
HomeMy WebLinkAboutFile Documents.508 E Cooper Ave.0006-2023-BCOM (12) City of Aspen Building Permit Application Checklist for Commercial and Multifamily Projects (IBC) PROJECT ADDRESS 508 E Cooper DATE 12/8/22 Note:This checklist is specific to Building Department requirements for various building permit application types.For Zoning,Engineering,Parks, Utilities,and WELS requirements visit their pages at http://www.aspen.gov. Building permit application submissions must include ALL the Submittal Requirements on this checklist or they will not be accepted.Refer to the IBC Building Submittal Guide for more information about each requirement. Submittal guides,required forms and other resources can be found in the Building Department Document and Resource Library. Submit all documents and drawings in PDF format via the Salesforce portal.Follow File Preparation Standards for all files submitted. REQUIRED 8 34" X 11" DOCUMENTS Submittal New Addition Alteration/ Alteration Demo Repair Requirements Construction Remodel (Interior only) (Complete) Permit Application ❑ Packet* ✓ Asbestos test and clearance reports ✓ ❑ f answennq yes to asbestos State Asbestos questionaire Demolition Approval Notice Fireplace Registration Form &Manufacturer's ❑ installation instructions Energy Code Compliance (REScheck, COMcheck,or prescriptive path) U-Factor Fenestration Docs Pee documents s docu Line Grade Verification Form Updated 3/9/22 Page 1 of 5 Submittal New Addition Alteration/ Alteration Demo Repair Requirements Construction Remodel (Interior only) (Complete) Signed Special ❑ if any steel structure work or in Inspection and l •••sed ❑ Testing Agreement Verification of Structural Integrity ✓❑ Soils Report Mechanical Docs Photos J Unit/Building relationship ❑ I I CMP** Commercial ❑ Itesideft44a1 ECU Calculator** ❑ ❑ ❑ Water/sewer Service D ❑ Disconnect Applications *Permit Application Packet must be filled out entirely or your submission will not be accepted. **CMP and ECU Calculator are common Engineering requirements; contact Engineering to discuss. REQUIRED 24"x36" PLANS Note: Sheets must be in the following order. Existing plans required for all additions &alterations. Submittal I New I Addition I Alteration/ Alteration Demo Repair Requirements Construction Remodel (Interior only) (Complete) Cover Sheet 111 • Survey • Fire Area Sheet Updated 3/9/22 Page 2 of 5 Submittal New Addition Alteration/ Alteration Demo Repair Requirements Construction Remodel (Interior only) (Complete) Site Plan CREM P/RREMP Plan ❑ ❑ ❑ Floor Plans: Existing & ❑ ❑ Proposed ✓ Reflected Ceiling Plans Lighting Plan w/ spec sheet(s) V Occupancy/ Means of Egress Plans V Separation/Fire Resistance Plans Fire Resistant Assembly Listed ✓ ❑ Installation Details Accessibility Plans &Details ✓ Roof Plan Elevations/ Height ❑ ❑ ❑ ❑ Sections Details Fireplace Details Updated 3/9/22 Page 3 of 5 Submittal New Addition Alteration/ Alteration Demo Repair Requirements Construction Remodel (Interior only) (Complete) Schedules Excavation/ Earth Retention Plans Civil Plans *discuss directly 171 with Engineering Electrical Plans V Kitchen Plans V Mechanical Plans V Plumbing Isometrics/ Flatometric • Structural Plans or letter ADDITIONAL NOTES and/or REQUIREMENTS -provide occupant load calc and plumbing fixture calc for that occupant load -if occupant load is over 50 you'll need to open up the corridor to the rear 2nd exit so that it is not considered passing through the kitchen, compliant egress to 2nd exit not req'd under 50 occupants -stamped full MEP design. ComCheck, kitchen hood design and ventilation calculation -specs on all kitchen/bar equipment -specs on all light fixtures with max wattage and NRTL listing highlighted -walk in specs to demonstrate energy code compliance -5% of seating and dining surfaces to be accessible and distributed throughout the space -roof plan showing new equipment -show required clearances (30"x48") at bar companion seat (all seat clearances can be tucked into tables/bar 17" demonstrating knee and toe clearance. will help aisles fit around clearances as they should not overlap) -show 36" wide accessible route through dining space to all exits. elevator and restrooms -touch base with EH directly to ensure submittal has everything they need for food service licensing -1 hour ceiling detailing or detailing of existing 1 hour structure already in place with compliantly attached drops (see IBC 803.13) -1 hour fire protection of primary structure (columns), special inspection if using spray applied material Updated 3/9/22 Page 4 of 5 PRE-SUBMISSION BUILDING CHECKLIST REVIEWED AND ACCEPTED: agt1 aiS"ed by Juslin Hahn Justin Hahn De Eo n ent 0U olyMupen n m CN U City Hahn OU=Userz.DC org unity De�eb>I hM re ie d Iuwty Dh sion,OUxiry.DC-=asperpikn,DC=ap ReaSa': hive reviewetl tIK tloalneiH CITY STAFF NAME: Date:2072 12 08 12:17:1e-07oa DATE: 1 2/8/22 PERMIT APPLICANT DECLINES TO CONDUCT A PRE-BUILDING PERMIT SUBMISSION MEETING WITH BUILDING STAFF AND UNDERSTANDS THAT FAILING TO DO SO MAY RESULT IN A LENGTHIER BUILDING REVIEW PROCESS: PERMIT APPLICANT NAME: DATE: Updated 3/9/22 Page 5 of 5