HomeMy WebLinkAboutFile Documents.508 E Cooper Ave.0006-2023-BCOM (17) 508 E Cooper MEP pre-review comments
22338- 508 E COOPER- ELEC (002).pdf(1)
Subject: PlanCheck 4
Page Label: [1] 22338-508 E COOPER-ELEC-EO-1 All MEP plans should be
„"= ) Author:justinh stamped and signed for the
C,— (File Name: 22338-508 E COOPER-ELEC (002).pdf actual permit submittal
snuso ,AII MEP plans should be stamped and signed for the Color: •
r actual permit submittal
SYSTEM
��a J MEP PLANS ARE STAMPED
i
Eao
22338-508 E COOPER-MECH_PLUMB.pdf(6)
111 J o-� .� Subject: PlanCheck V
Plan note references a
11 - Page Label: [2] 22338-508 E COOPER-MECH-M1-1
tAuthor:justinh dishwasher hood (I assume a
1 File Name: 22338-508 E COOPER-MECH_PLUMB.pdf type II hood). I'm not seeing this
Color: • shown in the equipment
BASE schedules, be sure all proposed
^o.'m.see"o BCE Response: Exhaust is provided to connect to mechanical equipment is shown
DW hood by kitchen designer. in both the plan and schedules
and revise as needed.
Subject: PlanCheck X Clearly show/explain how the
Page Label: [2] 22338-508 E COOPER- MECH-M1-1
Author:justinh general HVAC system is
, s -Z.as File Name: 22338-508 E COOPER-MECH PLUMB.pdf accounting for the 2 bar
ii :�ocil=;,6—"A Color: ■
Ri1 .� ice• .�. 1.,00. — dishwashers per IMC 507.3 as
"\,;\ %\ _ LL type II hoods are not being
_,,'=doimi—, ,, __ BCE Response: provided.
'� �'W_ ,� I" HVAC equipment has been designed to support the
o ���`��'\11Ar load into the space. It is anticipated that these will not
1 *�p_, it be full commercial dishwashers and will not have hoods.
Subject: PlanCheck 4
l�` Page Label: [2] 22338-508 E COOPER-MECH-M1-1 Update all code references to be
..en. ..,.,�-mom., -••- Author:justinh 2015 IMC, provide basic info
File Name: 22338-508 E COOPER-MECH_PLUMB.pdf (size and material)on the
Color: • existing duct to demonstrate
compliance with IMC 506(this is
t BCE Response: code references have been initial occupation of this space so
updated. Refer to Mechanical provisions on existing conditions are not
„,_A,� ,t,, z,„ ' 8 M3-2 for duct material. grandfathered in if not compliant)
• Subject: PlanCheck 4
Page Label: [2] 22338-508 E COOPER-MECH-M1-1 Clearly note the requirement for
Author:justinh penetration protection/fire
Clearly note the requirement for
-{ File Name: 22338-508 E COOPER-MECH_PLUMB.pdf dampers as applicable on any
penetration protection/fire dampers as Color: • mechanicalsystems penetrating
applicable on any mechanical systems the 1 hour fire rated ceiling
penetrating the 1 hour fire rated ceiling
construction. BCE Response: Note added to plans. construction.
Ref. sheet M1-1
RECEIVED
03/10/2023
ASPEN
BUILDING DEPARTMENT
Subject: PlanCheck 4
Page Label: [4] 22338-508 E COOPER- MECH-M3-1 Provide full hood plans/specs
= with the permit submittal.
Author:justinh
_- File Name: 22338-508 E COOPER-MECH PLUMB.pdf
h - nz, Color: ■
�.wn.w. BCE Response:
__. Any additional kitchen equipment is to be designed
and specified by kitchen designer.
Subject: PlanCheck J
Page Label: [4] 22338-508 E COOPER-MECH-M3-1 Provide your required ventilation
Author:justinh calculation per the 2015 IMC for
File Name: 22338-508 E COOPER-MECH_PLUMB.pdf all spaces.
Color: ■
®� BCE Response:
1"-7 ,, S ii Ventilation calculations added to drawings.
r,, Ref. Sheet M3-2.
Ff. r-i I-.1111 i l
OCCUPANCY (002).pdf(1)
Subject: PlanCheck Kitchen and back of bar space
Page Label: 1 occupant calculations look good,
Author:justinh
File Name: OCCUPANCY(002).pdf but the dining areas are to be
Color: ■ net area measurements which
ETIIIJ
would exclude the area of your
accessible route and required
egress paths. Alternatively you
can use a compliant seating
® r layout design to establish the
dining area's occupant load,we
would give you which ever is
larger.
Provide a plumbing fixture
calculation that corresponds to
the designed occupant load.
ZG response: New occupancy
calculations and plumbing Occupant load over 50 will
require a second exit from your
fixture calculations located on space,the"corridor"to the rear
A0.30 second exit will need to be
opened up if we're to consider
that not route not passing
Second exit egress through through your kitchen (which is
kitchen shown on A-101 prohibited by IBC). If under 50
occupants we don't need to
require a compliant path to the
rear exit.
PLAN (002).pdf(3)
Subject: PlanCheck
Page Label: 1 Construction documents for the
Author:justinh walk in cooler/freezer are
File Name: PLAN (002).pdf required at permit submittal
Color: • demonstrating compliance with
°-IiIt1I 2015 IECC C403.2.15 or
C403.2.16
ZG response: IBC compliance shown in"60. RECEIVED
.���� . _ WALK IN COOLER SPECS MEETS IBC.
20230201" 03/10/2023
ASPEN
BUILDING DEPARTMENT
Subject: PlanCheoV
Page Label: 1 Provide a lighting plan and
Author:justinh corresponding interior lighting
File Name: PLAN (002).pdf ComCheck report. The lighting
oob�° m ;':° 'rem .g.9. Color: ■ plan needs to show all required
„ , , „�„ ,,,,,,re,�,re,. ZG Response: Lighting plan with exit exit directional signage if the
re '"R directional signage provided on LD1.1 occupant load is over 50 and a
second exit is required.
Lighting fixture spec package in document
"30. INTERIOR LIGHTING CUT SHEETS. Provide a lighting fixture spec
20230201" package, be sure to highlight
max fixture wattage and NRTL
listing on all specs.
Subject: PlanCheck Provide specs on all kitchen
',,urom___r, ■ ' 1 Page Label: 1 equipment
. Author:justinh
File Name: PLAN (002).pdf
Color: ■
ee - c ZG Response: Kitchen
�g1
iSpecs shown in"60.
_ KITCHEN CUT SHEETS.
20230201"
RECEIVED
03/10/2023
ASPEN
BUILDING DEPARTMENT