Loading...
HomeMy WebLinkAboutFile Documents.508 E Cooper Ave.0006-2023-BCOM (17) 508 E Cooper MEP pre-review comments 22338- 508 E COOPER- ELEC (002).pdf(1) Subject: PlanCheck 4 Page Label: [1] 22338-508 E COOPER-ELEC-EO-1 All MEP plans should be „"= ) Author:justinh stamped and signed for the C,— (File Name: 22338-508 E COOPER-ELEC (002).pdf actual permit submittal snuso ,AII MEP plans should be stamped and signed for the Color: • r actual permit submittal SYSTEM ��a J MEP PLANS ARE STAMPED i Eao 22338-508 E COOPER-MECH_PLUMB.pdf(6) 111 J o-� .� Subject: PlanCheck V Plan note references a 11 - Page Label: [2] 22338-508 E COOPER-MECH-M1-1 tAuthor:justinh dishwasher hood (I assume a 1 File Name: 22338-508 E COOPER-MECH_PLUMB.pdf type II hood). I'm not seeing this Color: • shown in the equipment BASE schedules, be sure all proposed ^o.'m.see"o BCE Response: Exhaust is provided to connect to mechanical equipment is shown DW hood by kitchen designer. in both the plan and schedules and revise as needed. Subject: PlanCheck X Clearly show/explain how the Page Label: [2] 22338-508 E COOPER- MECH-M1-1 Author:justinh general HVAC system is , s -Z.as File Name: 22338-508 E COOPER-MECH PLUMB.pdf accounting for the 2 bar ii :�ocil=;,6—"A Color: ■ Ri1 .� ice• .�. 1.,00. — dishwashers per IMC 507.3 as "\,;\ %\ _ LL type II hoods are not being _,,'=doimi—, ,, __ BCE Response: provided. '� �'W_ ,� I" HVAC equipment has been designed to support the o ���`��'\11Ar load into the space. It is anticipated that these will not 1 *�p_, it be full commercial dishwashers and will not have hoods. Subject: PlanCheck 4 l�` Page Label: [2] 22338-508 E COOPER-MECH-M1-1 Update all code references to be ..en. ..,.,�-mom., -••- Author:justinh 2015 IMC, provide basic info File Name: 22338-508 E COOPER-MECH_PLUMB.pdf (size and material)on the Color: • existing duct to demonstrate compliance with IMC 506(this is t BCE Response: code references have been initial occupation of this space so updated. Refer to Mechanical provisions on existing conditions are not „,_A,� ,t,, z,„ ' 8 M3-2 for duct material. grandfathered in if not compliant) • Subject: PlanCheck 4 Page Label: [2] 22338-508 E COOPER-MECH-M1-1 Clearly note the requirement for Author:justinh penetration protection/fire Clearly note the requirement for -{ File Name: 22338-508 E COOPER-MECH_PLUMB.pdf dampers as applicable on any penetration protection/fire dampers as Color: • mechanicalsystems penetrating applicable on any mechanical systems the 1 hour fire rated ceiling penetrating the 1 hour fire rated ceiling construction. BCE Response: Note added to plans. construction. Ref. sheet M1-1 RECEIVED 03/10/2023 ASPEN BUILDING DEPARTMENT Subject: PlanCheck 4 Page Label: [4] 22338-508 E COOPER- MECH-M3-1 Provide full hood plans/specs = with the permit submittal. Author:justinh _- File Name: 22338-508 E COOPER-MECH PLUMB.pdf h - nz, Color: ■ �.wn.w. BCE Response: __. Any additional kitchen equipment is to be designed and specified by kitchen designer. Subject: PlanCheck J Page Label: [4] 22338-508 E COOPER-MECH-M3-1 Provide your required ventilation Author:justinh calculation per the 2015 IMC for File Name: 22338-508 E COOPER-MECH_PLUMB.pdf all spaces. Color: ■ ®� BCE Response: 1"-7 ,, S ii Ventilation calculations added to drawings. r,, Ref. Sheet M3-2. Ff. r-i I-.1111 i l OCCUPANCY (002).pdf(1) Subject: PlanCheck Kitchen and back of bar space Page Label: 1 occupant calculations look good, Author:justinh File Name: OCCUPANCY(002).pdf but the dining areas are to be Color: ■ net area measurements which ETIIIJ would exclude the area of your accessible route and required egress paths. Alternatively you can use a compliant seating ® r layout design to establish the dining area's occupant load,we would give you which ever is larger. Provide a plumbing fixture calculation that corresponds to the designed occupant load. ZG response: New occupancy calculations and plumbing Occupant load over 50 will require a second exit from your fixture calculations located on space,the"corridor"to the rear A0.30 second exit will need to be opened up if we're to consider that not route not passing Second exit egress through through your kitchen (which is kitchen shown on A-101 prohibited by IBC). If under 50 occupants we don't need to require a compliant path to the rear exit. PLAN (002).pdf(3) Subject: PlanCheck Page Label: 1 Construction documents for the Author:justinh walk in cooler/freezer are File Name: PLAN (002).pdf required at permit submittal Color: • demonstrating compliance with °-IiIt1I 2015 IECC C403.2.15 or C403.2.16 ZG response: IBC compliance shown in"60. RECEIVED .���� . _ WALK IN COOLER SPECS MEETS IBC. 20230201" 03/10/2023 ASPEN BUILDING DEPARTMENT Subject: PlanCheoV Page Label: 1 Provide a lighting plan and Author:justinh corresponding interior lighting File Name: PLAN (002).pdf ComCheck report. The lighting oob�° m ;':° 'rem .g.9. Color: ■ plan needs to show all required „ , , „�„ ,,,,,,re,�,re,. ZG Response: Lighting plan with exit exit directional signage if the re '"R directional signage provided on LD1.1 occupant load is over 50 and a second exit is required. Lighting fixture spec package in document "30. INTERIOR LIGHTING CUT SHEETS. Provide a lighting fixture spec 20230201" package, be sure to highlight max fixture wattage and NRTL listing on all specs. Subject: PlanCheck Provide specs on all kitchen ',,urom___r, ■ ' 1 Page Label: 1 equipment . Author:justinh File Name: PLAN (002).pdf Color: ■ ee - c ZG Response: Kitchen �g1 iSpecs shown in"60. _ KITCHEN CUT SHEETS. 20230201" RECEIVED 03/10/2023 ASPEN BUILDING DEPARTMENT