Loading...
HomeMy WebLinkAboutFile Documents.735 E Bleeker St.0082-2022-BRES (9) Field Plan Set Must Be Printed In Color �1►1 APPLICATION ACCEPTED DATE: 2022-06-22 PERMIT NUMBER: 0082-2022-BRES i`'/ 0/ dididge COMMUNITY DEVELOPMENT DEPARTMENT CITY OF ASPEN CITY OF \��jg ASPEN BUILDING PERMIT COVERSHEET ��� PERMIT NO 0082-2022-BRES CITY OF ASPEN �� F: � These plans muus eKeept at the building site or inspection OWNER Beckwith delays may occur.Construction PROPERTY INFORMATION - shall conform to these plans.All changes shall be approved by ADDRESS: 735 E BLEEKER ST UNIT: Ifiliging official. PARCEL ID: 273707360006 LEGAL DESCRIPTION: CREEKTREE CONDOS SPECIAL INSPECTION REQUIRED ADDRESS 735 E Bleeker OWNER: BECKWITH DAVI D E QPRT SEPARATE PERMITS ARE PERMIT CONTRACTOR: WELL HUNG CABINETRY - PARCEL ID REQUIREDN FOR ELECTRICAL, 273707360006 PLUMBING,MECHANICAL,OR Special inspection is required per 20091BC FIRE SPRINKLER WORK DESCRIPTION OF WORK newexteriorstairinpreviouslydefinedbuildingenvelope section 1704. Inspector to verify that copy of SMOKE ALARMS AND CARBON MONOXIDE agreement for inspection program to be on DETECTORS REQUIRED THROUGHOUT DWELLING NIT PER CITY OF the job site prior to performing any U MUNICIPAL CODE 8.15N USE OF BUILDING Multi-Family FIRE SPRINKLER REQUIRED? No inspections. A copy of all Special Inspector field reports to be on the job site for IT should be known that this review shall CLASS OF WORK Residential FIRE SPRINKLER TYPE inspectors' review if requested. Failure to not relieve the applicant of their responsibility to comply with the comply mayresult in denial of inspection. requirementsMupalof the Pursuy of ant to p y p Municipal Code.Pursuant to IRC Twofamil REQUIRED SPECIAL Structural Steel Welding Sec.26.104.050,any permit or approval BUILDING TYPE (IRC) y INSPECTIONS issued in error or otherwise not in conformity with the requirements of this Title,shall be void.Similarly,any permit or approval issued in reliance upon or CONSTRUCTION TYPE VA ENERGY CODE COMPLIANCE as a result of,a materially false statement or representation made in the process of obtaining the permit or development approval shall,likewise, OCCUPANCY GROUP(IBC) B WORK CHANGES BUILDING No y p having received FOOTPRINT? be or voidable permit or approvala shall not be relieved from having to comply with all applicable terms and conditions of this Title and the City shall CODE EDITIONS 2015 I RC TOTAL SPA SQ.FT. not be estopped from fully enforcing same. OTHER CODE EDITIONS TOTAL SNOWMELT SQ.FT. [ ew/ED 07/07/2022 HISTORIC PROPERTY? No TOTAL POOL SQ.FT. kyles FIRE SPRINKLER EXISTING? No ZONING_ tmaii 09/01/2022 iji FoRcootampuvecE jimp l$ 1a e A land use application fora Development Order or Notice of Approval was 1`/�I� submitted to the Community Development Department prior to final passage of I]�/ the ordinance an December 8,2021,and was subsequently deemed to be complete by the Community Development Department Director. CITY OF ASPEN o The land use application is seeking a Development Order or Notice of Approve, Piece,ASPo^.CO 8t6n fora project consisting of 100%Affordable Housing as that term,s defined at qz7 Rio Grande P (970)iece, 90 U6.100100 of the Aspen Municipal code,or as may be deemed necessary for the issuance of Cedifkates of Afforded°Housing fora 100%Affordable Housing NOTICE OF APPROVAL www.eaPeo.gov project,or as determined by the Community Development Director. o The land use application involves Voluntary AspenModem designation FOR MTV OF ASPEN ADMINISTRATIVE EXEMPTION OF STREAM MARGIN NOTICE OF EXEMPTION AND AUTHORIZATION TO APPLY FOR LAND USE/ processes that meet the requirements of Section 26016.02NC and REVIEWEOR STAIRWAY CONSTRUCTION,OXIDE PROPERTY-COMMONLV BUILDING PERMITS DURING THE EFFECTIVE TERM OF ORDINANCE#27, 26015.030. DESCRIBED AS 735 E.MEEKER,LEGALLY DESCRIBED AS UNIT 735, SERIES OF 2021 AND ORDINANCE#0,SERIES OF 2022 o The land use application or administrative request may be necessary to issue corvpoMlnwms,ACCORDINGIAMAPS THEMAe THEREOF • amp building permits as described below,and as determined by the .00..EPTEMBER]O19B IN BOOR 120E MAPS AT PAGES 20 AND FIRST • Community Development Director. RECORDEDAMENDMENT AUGUST 12,]Y9],IN PLAT BOOK2Y AT Property Address: 735E Bleeker St Aspen,CO 81611 PAGE 50 AND ACCORDING TO T.CONDOMRSIUMDECLARATION THEREOF The palest described above,s permitted to submit for building permit reviewRECORDED BOOK 4l6 AT PAGE 35d OF SUCH RE(:OHUS,AS AMN:nI]ED. Parcel,D Number: 2737 07 360 006 because(check all tat apply): COUNTY OF?REM,STATE OF COLORADO. Properly Owner: David Beckwith o A building permit application was submNed to the Community Development FIxed 0DNa.2737A7-36-0006 I Deparment prior to final passage of the ordnance on December 8,2021,and Representative/email: vier@re,darchitecrecom was subsequently deemed to be complete by the Chief Building Official. APPLICANT, D 'aB k'W • • e ,t,s a building permit far a project that wit not increase the gross squareB'Gloria Circle d of of Work(Provide narrative here and a separate pdf which,s a succinct and footage development,Net leasable area,or Net livable area of any building Merdo G perk94U15 dear set of supporting documents,to be attached to this form as Exhibit A,such as and does notmeet the definition of demolition. Letters of Completeness, Resolutions, Development Orders, Lana Use Case a ,t,s a building permit for a project that will not increase the Height of any REPRESENTATIVE: Suzann.Reid,Reid Architects,Inc. numbers,Building Permit numbers etc. ,f the representation being made is that the building.This,^cloaca additions to or replacement of mechanical equipment a work does not involve dimensional changes prohibited by the moratorium provide energy efficiency systems pursuant to height exemptions as set forth at CO 82611 existing and proposed calculations,floor Plans and and elevations to be attached §26.575.020 of the Aspen Municipal Corte,or as determined by the Community Asp on, Development Director. SUBJECT&SITE OF APPROVAL: .wamm..m,sw.. .n..co�eue.,en•+•r•w.n.eume..�•m�..e muu.e•••+•n•.e...re.sm.nm. o It is a building permit for commercial and lodge development as stand-alone The subject property is located within the Medium-Density(R-66))m^eaistiict and is improved uses 00 a pares,or Property. one hundred fact or less(as mrion of property is lac o The projecthas l vest o edste to a Development Orders ta50111 0015 portion deject to of the heighened Roaring Forkpursuant is to considered b Approval on the 100%e affordable of leis ordinance weh435.0 Sensitive Area and is subject m heightened review p uant m Lend use Conic Due to the circumstances noted below,the above referenced project as defined by o I[is a building permit for 100%affordable housing projects as that term is Section 26..435. cam G axiom the Scope of W.is exempt from the application ofOrdinance#27,Series of 2021 defined at§26.104.100 of the Aspen Municipal Code. and ON,nance#6,Series 01 2022,and is authorized toland use review o It is a Wilding permit for demolition or repair d non-habitable structures. pursueu a r vi conho eectsli connects-le d floorts approval second-floor Mardeck. Renew to wnshvnonenenxir staircase the, and/or building permit review during the effective teens of Ordinance i{27,Series of oninn, June 10 zz enmr aWe groom flxixirmaeeaxind-exim seek. 2021 and Ordinance#6,Series of 2022,ordinances which II lace a eoe00 s0 this ardilanc i#valid though me generally p a rdi datc d Ordih nance supersedes aeries of 2021 and Ordinances I Seriesmanner of 20whi or The proposed pla n location or the Zone"and o potion mane residence ere While the wiwimme l0o- oraissuance o oe residential itdevelopmentorapproval ral Thisy authorization p does not guarantee any Ordinancet welope of Wok A copy of s esecer fxete le led man appAinh t to theMAting Fork "ABM than Me existing Fodltiwa.woimdc staircase will c se rice of acomplet permit or app dal of any land use application. The applicantSmell is relevant to the Scope d Work A mpy d this ceicepis is required when n Order located no�elr m e Roaring build Rim than tar tablish dwelling,the e First of the d Plat of must submit complete information and pursue all ion,tern approvals ina timely for anyland use review or building permit.This Notice is not a Development Order do Creek SH within.buildingi7,Pge54e establishetl purnrentto the First Amended Plat of fashion, adhering to all deadlines for submission, teens of Vested Rights, or Administrative OeWmmination that is subject mappeal. re are nee vraron(Boo 54). response times required to maintain en active building permit,and all other Land Use On 5... Planning Director,for The foot,.of We staircase wil137measureapproximately Warty-three square fen,which falls Code and Building Code requirements in effect as of December 8,2021. Any the allowable area for exterior decks taircesc rcqures asirp)csmcl poem aconerete amendments and additional approvals not addressed or identified in the Phillip Supinw oriube to supportthe uppw rim boy as well as a three-foot wide connate foundation under the application,may be subject m Ordinance#27,Series of 2021 or Ordinance#6 Se' Community onvelopment Director area t pp the ese of We stair.Existing gad,and landscaping will not be of2022. RECEIVED axe,.isgiven on then sanproidedbby aapllgeniItchangesare pee RECEIVED amaredat w: ndm e,a n ace 'RECEIVED The project described above is permitted m proceed with land use review be4EY21/2022 Exnlbit A.Morpensarn elevators representing same of von a. ag 06/21/2022 e00p21/2022 (check all that apply): ASPEN SPEN BUILOINGDEPARTMENT ASPEN 8ulunlev0EMRrMEM BUILOINGDEPARTMENT STRUCTURAL GENERAL NOTES ABBREVIATIONS STRUCTURAL SYMBOLS LEGEND GENERAL WOOD AND TIMBER FRAMING f. .' . N „n' m .. �"N . mauw: w**'" m .xxmmm.w i �1,Gnc„Ex„nu,E Med� --— .tm1 .,.mme. —--—ECSTI110 HEADER BEM CR LIAM STRUCTURAL DESIGN Co aRy mRwm mam.n"Gm mad...a.m x ;, "„ .. • N x .. iw xG ; RN xrRwx°T°EmW .wx ym r1° PEx Emnor xww ''NOMEwN L.KOLIXO p .w.n on,.e w..ecexmw gg :O'x°wuE s ENS ` O x ` NI... mRRww ., awwu Tax °iTex m.x k ` b r s 'roef ° . xnw moam ..„.,..m � .0 ix BE,°w WAwwROnE . N FR . m. .m.mro a•s�ax CL °rx s D FEwuE� " aarunT RT `PVECRVDTSTS. _ wxm R° €i ix MT.. 2rrik 2" PPR°cuuR ..a,m�.e.. nn,s+..m:m.rveu.xaa.m,mu.,xea.u.mw.oFOUNDATIONS �w` iD its wu GmRuxuR.- msEffRGGRwcmxeoRwusmxG nme immee ems iw am gum..ma.. c., /7 owwrw coxx.niw, . REr I� m..m...m,,.,,�... —....�..a..��..ma..m.ma.m...,. d _ N N.xTGwxaTwr U O x Et 'trr ,sm-xsrsversa" Z N 0 m=osouomr r 1 M y 6uniw vsTmLaTEP w x°w Ce ES mn.aam...n.. ,re��mm.e., ,<wa<a.m,. ,.,.w,em,w,,.,<„.,.maae.mm,iiR °mam.E°no - wN.nm,P°x,G-----,.. N w O ....e„mw.EMI mm.naeP.amnGmm..1E..�...m,mmn.m,am, ' n�ww.usre>raxrs�xoxEcroxrcowm Y mxa,.maaamarenam,.m, ..w.mmma.No,. N'P�`e„ K w O w�mer.m,ma.,.,m.,. _ fir' wwsw°nxG J U REINFORCED CONCRETE .n,w.a.m.°a.aw...e..wmm.....wnn.,Wr..wem — mrnu,E s w"a H6 H m ` • ,,.,xNm G.u,a.Ac�T�x.xa., ..m xc,�..mm....m.,,,,...FRAMING CDNNECRON SCHEDULE 1I37 P° xR.w..,.=NORMrGGRxG w Z LLI '"""""m°"`°" •• �wNMGm°.Nor= .� �w� ANr EEL`,RUNE _--}w000n.onNnNwwN..w.E Y M,_GN° ' + +:GNawaR LU n Q E °.m. mm,a ,: mwGGTmowweE.wmwxG m .n,w.3,0„.a.x...�....m. A' ,ow„°° sNa .& &S + +x m.RIxGnaDwNEEDW,.RNwNG Wmmxx�awmrw..e.Aa..,.w.m, P�,N r®xu� °Eca.E.ar°E�xE.E°Ex„"�oaoa4r°.°�w,. ,Nm.x°°"r..,.�x°°aE°..rm,E"I°" ♦ ICiR€au�r6»G LG UT uw�x ..mw� °m,NneEN»Gwm.xELwwr«e..N .a.I Imp °mx„mm mwWar —G ExNx�°x� EG,°xE,.,,E°.N wm�GR `"x'"`.'"•"D T' G°rE .° n�xGxx.RwN., rNxrnm,NnGwNEm.Gw.RNwxG ®m,...mm�...,m,.,,n.�m.mn.a.G..,mNm.mxrmr.m Pxn.x„r .mwA r..Ne wwr 1LOE 4,., E,Nwa<mnra,.0.8E,aanGwN<N.°w.mra�xG • .,.w,.mna „ ,.�.,m,x.e.w ,. '''''' ..woes • mmTDmNaRIn= I \�RxxRGm.mEmG GG.WERRxNRGmR,YmruGmN. mGmwGW INM.rzN� Pem,r ,ae..m,,.am,. SHEATHING NAILING SAWN LUMBERIrN SS,CONNECTION SCHEDULE ❑ Gx."amwG,mxwGx,DmnTGxna,.,,®wN.RGmaG. °°°"a`w • „reum.,m. EaPn's,wom,rn,wow. wmonoor Nccumox isi ,r r auxo ma MOTE, E` LVL HICK MEMBER WIDTH m11'CONNEGTIONSCHEDULE °"w°G°coLuwwnlcxwmw,amu.M°w Laws mom w m,.GwraNEwGT�wx,RROPERwn.x COVE. �e. rew... O TYP FLOOR&ROOF SHEATHING LN11�R"�x°,Gws'G E.x... °wnGE M.ME a,. In aD°.x°m..r°NrrGx°.,axµcwRrm,PLAx°EErEDErE cwcRNENrosEo,oumxo"wu,xe. wy m • mn .m..,.ra.mow..w".=—amA..x.e..... rc•. M.Ocu.MA 611'THICK MEMBER W NM.1 xawwx xnruEonTErsEcrwru rxxsuovE cwoaTEnmDw.n,°wu wnw.2 °' ,sme „w n I.em.,.Xa,emlmm,mlm Omm9REQD PEMENIS�iewrmarxv,m..m,wi .�:mwur�Nxow �I'O,xxN°E sRvxsrxxswsrnEws Br+.. — — CD 1.wxxuMIIMPL-w REVISEITEMSmxsxTmexax ,m ,a... c.eb.,re coma. N cores III`"'/ e,wm a®x., III ® eENwGwcn*ws ...dams v, x_ rPDBLTOPPLCONN �I�II�I 111111�1 x°Gm,GGT.r.N.WRGwE°E,Gxn,E "°••••. OmxG„u° ,xrrexER >aYREUNR ULYwwm uE =2,RAumuw BACHFILLINGlea�`.aGwNR.nmxN,RGwE°6wnE STRUCTURAL sr m.,mm... .mm..m.�.rem...mm..Nmm..am.m.m...mR..N �,°rrPT°ua.rx � .,,ry TPmxGG'`R E.E..rW r, Rco.xGmNMR°w.En.pc.x SHOP AND ERECTION DRAWINGS O TYP MULTI-PLY BEAMS&COLUMNS GENERAL .n m"" � NN 1. NOTES&TYP �wxo a ® ~TIN DETAILS .mesa® .w.Nr.w.a�a.m.,m.,aa x a.,..w.MG.na.. ^aa..na.mmw,m.a,n.a..a..aaGN,mn.N..N EGGEGGrE.,w.,,GmGN. x ®�.r .�_w_®a - Gm., wrew „ . � �m°xo. IW�"�II PLOT DATE PROJECT MBp N..a..,,,a,.m xr.x Wr x aP w,, m,,,xxE G W,,E F".", N,GmG.w. 71 I R.GR N M MGM.' DRAWN BY:PAL �w� w�IIR ro RwR N H�IL Po CHECKED BY DW 02 TYP WALL�FRAMING DETAIL 4 TYP REINF AT CONC WALLSRwN O TYP REINF DETAILS qq , O""'"' GNE NE .., bp,��RECE VED D6/21/2022 BMFDINGDrvRNEM MINE STRUCTURAL DESIGN ,4„ 0.841/2022 "' TTATmmmmml �1lrrmrrTI4 n' -m—m—m—m rr--Tl—n mom—n N"m—m—m—m R„Rnwx. O STRINGER TO TIMBER FDN E,N.:,wGER w Ur ZNp w A I o o m,.n..NP®, „NxsRw® 171 w0y O moi.E.w..= SSE, \ 1.7.m Z'�rwr amaMOM� Rn.EES vi crv.eGEa.EGnma.ExvxEEss W Q Ee SECT ARTO RELIEVE FOUNDATION WALLS FR.„MOSIPTiC PRES.., O FOUNDATION PLAN �x°R°R,GREwRxE°m,xGA,°PEx.G E°E. EERPERr°.x°.,°RxG Exa, N "" ,NGRGn,R°„a,xGm EEGaGrww°wmD G1 p GSM AMMO Pe. LIM AA Hill"c1°0 w Amm mill II.1 OSQUARE PIER AT STL PIPE�`R�xGx p"HMI 11 A L PiGE. 11 mcx,nms oEvxcrtRwm.'x ® IWI �I�II III FOUNDATION& umaN.rax:4", <.nmaGER FRAMING PLAN m'x,nsu \11� xrsNm.wr ® Na Tow,woeu w.,wR wc. II �4_ xsrArFnEFEEEFasior .12012 m, ®n a„ wEN NewEW Mm MAIN LEVEL STAIR LANDING NwG ,,.000w °w x G wn nRm m.Er wP130.� DRAww MI DROPPED BM CONN CANTD JOIST END CONN ©FRAMING PLAN _� DHE�BY.wY O ,x.,w O „.�„ n 1 c„""1,DxN,DN.,rvm.Y,N,EGFi w„:s1 0OKECEIVED 11111141 B. Owner Responsibilities: CITY OF ASPEN 1. The project owner,an agent of the owner,or the design professional in responsible charge acting as the owner's agent,is responsible for employing special-inspection services.The special SPECIAL INSPECTION AND TESTING AGREEMENT inspector/agency shall not be in the employ of the contractor,subcontractor or material supplier. [IBC Sea 1704.11 In case of an owner/contractor,the special inspectodagency shall be employed This form is required for projects needing special inspection and/or testing per Chapter 17 of the International as specified by the building official. Building Code(IBC). C. Design Professional in Responsible Charge Responsibilities: Project Address:735 E Bleeker permit Number:0082-2022-BRES Design Professional in Responsible Charge definition:An individual who is registered or licensed to practice their respective design profession as defined by the statutory requirements ofthe professional registration laws of the state or BEFORE A PERMIT CAN BE ISSUED:The owner,or the design professional in responsible charge,acting as jurisdiction in which the project is to be constmcted;whoa engaged by the owner to review and coordinate certain G. Building Department Responsibilities: the owner's agent,shall complete two copies Of this agreement and the attached S ecial-ins action and Testis aspects of the project,as determined by the building official,for compatibility with the design of the building or I. Approve special-inspection program The building department shall approve all special g p p p D g structure. inspectors and special-Inspection requirements. Schedule,including the required acknowledgments.A pre-construction conference with the parties involved may be 1. Pre taCement of special inspections.There tared designprofessional in responsible 2. Enforce special inspection.Work requiring special inspection and the building inspector shall required to review the special-inspection re uicements and procedures. pares pecia r pec gets prom q4 Pr monitor the performance of special inspectors.His/Her approval,in addition to that of the special charge shall prepare a statement of special inspections in accordance with IBC Section 1705 for tor,must be obtained 1 placement f concrete,covering of structural steel,or other APPROVAL OF SPECIAL INSPECTORS:Special inspectors may have no financial interest in the projects for submittal by the applicant.The statement of special inspections shall identify the following: inspector, prior a p stamen o g which they provide special inspections.Special inspectors shall be approved by the building department prior to a. The materials,systems,components and work required to have special inspection or similar materials. f duties.Special inspectors shall submit theirqualifications are sub t to interviews for testingbythe building official or the registered designprofessional responsible for J. Review reporinspts. on reports.The building official should review special-inspection progress and performing any pecia pec ors s a andjet personal g y gi final reports. pre-qualification.Special inspectors shall display approved identification,as stipulated by the building official, each portion of the work. 4. Perform final inspection.The building official should perform the final inspection and approval when performing the function of special inspector. b. The type and extent of each special inspection. for a project[IBC Sec.109.3.1]after the final special-inspection report has been reviewed and Special inspection and testing shall meet the minimum requirements of the International Building Code Section c. The type and extent of each test. approved. 1704.The following conditions are also applicable: d. For each type of special inspection,identification as to whether it will be continuous special inspection or periodic special inspection. A. Special Inspector Responsibilities: D. Contractor Responsibilities: 1. Notify the special inspector.The contractor is responsible for notifying the special inspector or 1. Signify presence at job site.Special inspectors should notify contractor personnel of their presence andresponsibilities jobrequiredbybuilding othey shallsign in agency regarding individual inspections for items listed on the attached schedule and as noted on res bilities at the site.If the official, 735E Bleeker St 0082-2022-BRES on the appropriate form posted with the building permit. the budding department approved plans.Adequate notice shall be provided so the special inspector Project Addrcu: Permit Number: has time to become familiar with the project. 2. Observe assigned work.The special inspector shall observe assigned work for conformance with 2. Provide access to approved plans.The contractor is responsible for providing the special ACKNOWLEDGMENTS the building department approved(stamped)design drawings,specifications,and applicable inspector access to approved plans. I have read and agree to comply with the conditions of this agreement. workmanship provisions of the International Building Code.Architect\engineer-reviewed shop 3. Retain special inspection records.Upon request,the contractor is also responsible for retaining, drawings maybe used only as an aid to inspection. at the job site,all special inspection records completed by the special inspector. E. Inspection of Fabricators: For continuous special-inspection,the special inspector shall be on site at all times observing the work requiring special inspection.Periodic inspections,if any,must haveapproval based on 1. Fabrmembers n structural assemblies rf and members.Where fabrication of structural adctionng Special Inspection Signature Printed Name Date Email q g p pecprior members and assemblies is being performed on the premises of a fabricator's shop,IBC Section Agency a separate written plan reviewed and approved by the building department and the engineer or 1704.2 shall require special inspection of the fabricated items. architect of record. 2. Fabrication and implementation procedures.The special inspector shall verify that the 3. Report nonconforming items.The special inspector shall bring nonconforming items to the faOwner' Signature Printed Name Date Email immediate attention of the contractor and note all such items in the daily report.If any item is not inspection cmointai os detailed workmanship and the quality control procedures co thatto provide a vests for inspection n control of the and feren and s.f The specr's ability to conform to wtheapproved �D Sura Name Reid 7/20/22 Email reidarchitects.com resolved in a timely manner or is about to be incorporated in the work,the special inspector shall construction documents an reference standards.The special inspector shall review the procedures immediately notify the building department by telephone or in person,notify the engineer or for completeness and adequacy relative to code requirements for fabricator's scope of work. Design Professional in Si Printed Date Email architect,and post a discrepancy notice. F. Approved Fabricator Responsibilities: Responsible/,,,urge'• 4. Provide timely reports.The special inspector shall complete written inspection reports for each 1. Fabrication exempt inspections.Special inspections are not required where work is done on the Sgotot ry A8 f e.t -w t.- inspection visit and provide the reports on a timely basis determined by the building official.The premise of a fabricator registered and approved to perform such work without special inspection. Contind er Signature Printed Name Date Email special inspector or inspection agency shall furnish these reports directly to the building official, If work is done on site that requires special inspection,special inspection will be required. engineer or architect of record,and others as designated.[IBC Sec.1704.1.2]These reports should 2. Approval of fabricator.Approval shall be based upon review of the fabricator's written be organized on a daily format and may be submitted weekly at the option of the building official. procedural and quality control manuals and periodic auditing of fabrication practices by an Approved Signature Printed Name Date Email These reports should include: approved special inspection agency. Fabricamr••• a. Description of daily inspections and tests made with applicable locations, 3. Completion of fabrication.Upon completion of fabrication,the approved fabricator shall submit b. Listing of nonconforming items, certificate of compliance to the building official statist that the work was erfonned in accordance c. Report on how nonconformingitems were resolved or unresolved as applicable, p g° g p Inspected Signature Printed Name Date Email eP° DD with the approved construction documents. Fabricator'^ d. Itemized changes authorized by the architect,engineer,and building official if not included in nonconforming items City of Aspen Building 5. Provide Final Inspection Report.The special inspector shall submit a written final report Department: Signature Printed Name Date Email documenting required special inspections and correction of my discrepancies noted in the inspections prior to the final building inspection. bin a tin nrwho my aim as the owner on oar Z. **Toe Design Rofesvanal in Responsible Charge is rot required m sign if lb,perform the duties as dmaibed in ism C above.RECEIVED RECEIVED **•Enher the ApprovdFabriWororInspectd Fabricator rmWvgn.If ell work ivrm rrondin the shop Um Approved Fabeirwor, r E IV ED Wpection Amu,Signature is not ragmmd(no field work,. 06/21/2022 06/21/2022 06/21/2022 ASPEN 130 South Galena street Aspen CO Memic75 I P:970.920.5000 I F:970.920.5197 I clt yo laspa n.c o m ASPEN +3o South Galena Street Aspen,COe,trvt97s I P,970.920.5000 I F:970.920.5197 I eityofaapen.cnm ASPEN BUILDING DEPARTMENT BUILDING DEPARTMENT BUILDING DEPARTMENT tau Swdh Gahm Setae[Aspen COmen.snrs I P.97092Gt000 I f,9709205 „ 'D1 DocuSign Envelope ID:4BBF124A-8142-4B9A-91AEA987EEBD875F 00/01/2022 kr iORCOMOMMflfi lrnp G. Building Department Responsibilities: C. Building Department Responsibilities: 1. Approve special-inspection program.The building department shall approve all special 1. Approve special-inspection program.The building department shall approve all special inspectors and special-inspection requirements. inspectors and special-inspection requirements. 2. Enforce special inspection-Work requiring special inspection and the building inspector shall 2. Enforce special inspection.Work requiring special inspection and the building inspector shall monitor the performance of special inspectors.His/Her approval,in addition to that of the special monitor the performance of special inspectors.HisiHer approval,in addition to Thal of the special inspector,must be obtained prior to placement of concrete,covering of structural steel,or other inspector,must be obtained prior to placement of concrete,covering of structural steel,or other similar materials. similar materials. 3. Review inspection reports.The building official should review special-inspection progress and 3. Review inspection reports.The building official should review special-inspection progress and final reports. final reports. 4. Perform final inspection.The building official should perform the final inspection and approval 4. Perform final inspection.The building official should perform the final inspection and approval for a project[IBC Sec.109.3.11 after the final special-inspection report has been reviewed and for a project[IBC Sec.109.3.1]alter the final special-inspection report has been reviewed and approved. approved. ProjartAddress,735 E Bleeker St Permit Number: projectAddreaa:735 E Bleeker St Permit Number: ACKNOWLEDGMENTS ACKNOWLEDGMENTS I have read and agree to comply with the conditions of this agreement. I have read and agree to comply with the conditions of this agreement. Special Inspection Signature Printed Name Dale DWI Special Inspection Signature Printed Name Date Email Agency's* Agency*** ooessom bo Owner• Signature Printed Name Date Email Homeowner Dour.6uA4e W Dave Beckwith June 13, 2022 davebec k0@gmai 1.con Owner' 'Sigtletmareesteear... Printed Name Date Email Design Professional in Signature Printed Name Date Email Responsible Charge*' Design Professional in Signature Printed Name Date Email Responsible Charge** Contractor Si,i - Printed Name Date Email �wR tar C0r y �1;L -NW 2ri �J-� 2, , ,m Contractor Signature Printed Name Date Email A proved / Signet Printed Name mail DYh/tle7*/_7 Emai �M Fabricator•*• t, Approved Signature Printed Name Date Email Fabricator*** Inspected Signature Printed Name Date Email Fabricator*•' Inspected Signature Printed Name Date Email City of Aspen Building Fabricator*** Department: Signature Printed Name Date Email City of Aspen Building "See ahn of who may sign as the owner on page 2 Department: Signature Printed Name Date Email "•Tie Design Professional in Responsible Charge is not requoed to sign tithe)perform the dunes es dexnbrd in rem C above ••Esher the Approved Febncater or Inspected Fabncator must sign Midi work is performed mshc slop of an Approved Fabricator,the Special Inspection Agency signature is not required(no field work) "See list of who may sign as the owner on page 2. **The Design Professional in Responsible Charge is not required to sign if they perform the duties as described in item C above. ***Either the Approved Fabricator or Inspected Fabricator must sign.Nall work is performed in the shop of an Approved Fabricator,the Special Inspection Agency signature is not required(no field woM). RECEIVED RECEIVED Uo south Galen*Strwt Aspen CO rpeumm I P,970.920.5000 I F,970920.SIq ,,1_vv L0 08/25/2022 r09/O1/hs'W`�tD 06/21/2022 �!'��J 09/01/2022 ` 2 a22 FORC00.21 11VICE ASPEN UO South Galena Street Aspen Coe,tmiprs I P:970.920.50001 F 19 FORCaaaans.a'E ASPEN „rap BUILDING DEPARTMENT BUILDING DEPARTMENT