HomeMy WebLinkAboutFile Documents.11 E Water Pl.0044-2023-BROF (9) CONSTRUCTION MANAGEMENT PLAN (CMP)
Water Place Roof Replacements
1. Project location and summary:The existing asphalt shingle roofs of 15 buildings in Water Place have
reached the end of their usable life.The existing roofs are approximately 25 years old. Project scope
will include removal and disposal of the existing roof assembly, and installation of a new roof
assembly.
Units included in scope: 1-17 E Water PI. (8 buildings), 18-22 W Water PI. (5 buildings), 480 Doolittle
Dr. (1 building), and 455 Doolittle Dr. (1 building)
)OOLITTLE OR
0
T_P pL E WATER
A Pl
TW
say
Fig 1: Project Vicinity Map
2. Project Documentation
a. Permits/Documentation: A roofing permit will be required for this scope.
b. Public notification: Asset staff will provide a weather resistant project sign at site (Fig 2), no
less than the minimum size and information required,which will be located in an area visible
from Doolittle Dr, E and W Water PI.
Project contact list:
Owner: City of Aspen
Contact: Ben Levenson (Capital Asset Dpt.) 970-309-5199
Contractor : City of Aspen
Water Place Roof Replacements
(Replacement of roof assemblies of 15 buildings. Units
included in scope: 1-17 E Water PI. (8 buildings),
18-22 W Water PI. (5 buildings), 480 Doolittle Dr. (1
building), and 455 Doolittle Dr. (1 building))
Permit No: TBD 18"
General Contractor: City of Aspen
Contact: Ben Levenson 970-309-5199
Emergency Contact: Ben Levenson
Phone: 970-309-5199
24"
Fig 2: Project Sign (not to scale)
3. Project Implementation:
a. Construction timeline:Timeline is approximately 3 weeks with a TBD start date dependent
on permit issuance. Construction hours will follow the allowances and limitation of the city
(7:30-5:30 M-F, 9-5 on Saturdays and observed holidays.This project is not within the CRA.
b. Construction sequencing: Existing roof removal and disposal will be followed by immediate
installation of new roof assembly. One crew will work on one building at a time.
4. Site and ROW management
a. ROW usage: Use of ROW is not anticipated due to projects scope.
b. Staging areas and site plan: Exhibit A outline the proposed CMP site plan.
5. Traffic control and noise suppression:This project sits outside of the haul route map. Based on the
scope of the project no closures/impacts to Doolittle Dr, E or W Water PI are anticipated.As a short
duration residential roofing repair project, project is exempt from noise suppression requirements.
v tr.77 - ... . •,111111FW .. 4PIC. Vt. .41. ta..1: -.
e• • p. k� , Exhibit A Site Plan . �, 01` ' - A 'i` • •, '' i
isitt
- ,...4...- -.r.,11110•• : ;fr. t-' iti4iC-' 4.' .- -4... .
1\
N 'r, .., ' .0b,. ."...t ,r(e. 4, # -...". ... ...,,,"'• g.. , , t.T-t- "- . ifte. "Pli ,-• '' ' , . ..•
.06. . • 11110 1.. _ : - - *vitoft: • -- .,,4,' *.!' .0,4' ..,,,,P ...
t' 4 •1 • •� -ter • 1,1% _ a .
of
.' el t' IllAt P .,..._ r .4 ,s‘ rve .,,,\14 - . ...
. c . . ...- . . •• ....,:. , • ,
, . , , , r
..... . .... s% •
Laborer Parking . 1-
Z../".- • .
�� �. • •
t ,-14
S 4 4 406 ;• ~ - i,� `` _ Foreman/Manager Parking , }r+ .!1
IL
'4 ts, A.
_ ikii
• , , ,,
_ , • 'Ilip k ;...
. „It,
-0 • .. iiiii Ai - . ..4 R `•- 4
\lir .,,
•. •a , �c ' rf ° _ 1 • 4.` / �,.+
►•!
• 4 f �• �'- i , Metal Roof Fabrication Area r .l'•
kelbk •.• 4 •• •w; 1,' • +- r •• tt* r Toilet P' �. •l1t1,
may ,' - . • C . • • jtt, �. ..t .�
f 1 Dumpster .. ` •. �, • r .�
-, �,i,+ � •
,. •^� . •.'. . a �r . a. r r foil �� - Construction Parking(1 space) Q
v, .p . �, _ ... Materials
ar_
1-41 ' T 1 + ' f•y Staging 1.•° u '
•• Ar.
.L_ d ..11.__ -.1.1.__ 4, .
; ,
�Z u"S'.i'Q'i=SXS• S�YLzz�.Li�.Z'ZZ. ►�/,
•
Certificate of Completion `i , �.
THIS ACKNOWLEDGES THAT
•
., Ben Levenson I Cityof Aspen•
, •. r
+ i
,
: ..
HAS SUCCESSFULLY COMPLETED
'i'THE CITY OF ASPEN CONSTRUCTION MANAGEMENT COURSE
O ' p§ /
. 1.4 iti 4. „AC- 2023-03-14
CITY OF ASPEN,ENGINEERING DEPARTMENT DATE i ' '
O G
. """10110. NOE '41"elon '41"1160b• * '4.1111.... 0 --..,, A
"4k . ,