HomeMy WebLinkAboutFile Documents.196 Pfister Dr.0107-2023-BRES (7) G. Building Department Responsibilities:
1. Approve special-inspection program.The building department shall approve all special
inspectors and special-inspection requirements.
2. Enforce special inspection.Work requiring special inspection and the building inspector shall
monitor the performance of special inspectors. His/Her approval,in addition to that of the special
inspector,must be obtained prior to placement of concrete,covering of structural steel,or other
similar materials.
3. Review inspection reports.The building official should review special-inspection progress and
final reports.
4. Perform final inspection.The building official should perform the final inspection and approval
for a project[IBC Sec. 109.3.1]after the final special-inspection report has been reviewed and
approved.
0107-2023-BRES
Project Address: 196 Pfister Dr Permit Number: 23-0572
ACKNOWLEDGMENTS
I have read and agree to comply with the conditions of this agreement.
Special Inspection Signature Printed Name Date Email
Agency***
Owner* Signature Printed Name Date Email
Campo3/7/2023 rdecampo@billposs.com
POSS Architecture*Planning Nowt I. �?; ,.. Richard de rdecam bill ss.com
Design Professional in Signature Printed Name Date Email
Responsible Charge**
Contractor Signature Printed Name Date Email
Approved Signature Printed Name Date Email
Fabricator*** 3/V 23
CO/b/Goo l0ir)4.5 G1k,tA16vStr 7 ebJ't66L coo I. C GµAst.CO e.
Inspected Signature Printed Name Date Email
Fabricator***
City of Aspen Building
Department: Signature Printed Name Date Email
*See a list of who may sign as the owner on page 2.
**The Design Professional in Responsible Charge is not required to sign if they perform the duties as described in item C above.
***Either the Approved Fabricator or Inspected Fabricator must sign.If all work is performed in the shop of an Approved Fabricator.the Special
Inspection Agency signature is not required(no field work).
RECEIVED
08/21/2023
ASPEN
BUILDING DEPARTMENT