Loading...
HomeMy WebLinkAboutFile Documents.1215 Snowbunny Ln.0072-2022-BCHO Project: 1215 Snowbunny Ln, Unit B Permit # 0063-2022-BRES 22 September 2022 Change Order 01 – Summary Change order 01 is a structural clarification to replace insufficient existing roof framing. The existing interior volume remains unchanged. Ceilings heights are not impacted, and the overall area remains the same. New parallel chord trusses will replace existing dimensional lumber roof framing. The height of the building will increase approximately 12”-18” as a result. Final heights will be determined through the design-build-engineering process by the roof truss manufacturer. We are submitting the worst case (18”) scenario should we need a 24” tall truss. Included with the change order submittal are the following drawings: 1. Structural engineering drawings 2. Calculations for both height and demolition area 3. Architectural elevations showing the height increase Bryan May, AIA Bryan May Architecture + Interiors 09/26/2022