Loading...
HomeMy WebLinkAboutFile Documents.413 E Main St.0029-2023-BCOM (8)Updated 3/9/22 Page 1 of 5 City of Aspen Building Permit Application Checklist for Commercial and Multifamily Projects (IBC) PROJECT ADDRESS_________________________________________________ DATE___________________ Note: This checklist is specific to Building Department requirements for various building permit application types. For Zoning, Engineering, Parks, Utilities, and WELS requirements visit their pages at http://www.aspen.gov. Building permit application submissions must include ALL the Submittal Requirements on this checklist or they will not be accepted. Refer to the IBC Building Submittal Guide for more information about each requirement. Submittal guides, required forms and other resources can be found in the Building Department Document and Resource Library. Submit all documents and drawings in PDF format via the Salesforce portal. Follow File Preparation Standards for all files submitted. REQUIRED 8 ½” X 11” DOCUMENTS Submittal Requirements New Construction Addition Alteration/ Remodel Alteration (Interior only) Demo (Complete) Repair Permit Application Packet* Asbestos test and clearance reports State Asbestos Demolition Approval Notice Fireplace Registration Form & Manufacturer’s installation instructions Energy Code Compliance (REScheck, COMcheck, or prescriptive path) U-Factor Fenestration Docs CREMP/RREMP documents Line Grade Verification Form 06/08/2023 Updated 3/9/22 Page 2 of 5 Submittal Requirements New Construction Addition Alteration/ Remodel Alteration (Interior only) Demo (Complete) Repair Signed Special Inspection and Testing Agreement Verification of Structural Integrity Soils Report Mechanical Docs Photos Unit/Building relationship CMP** Residential ECU Calculator** Water/sewer Service Disconnect Applications *Permit Application Packet must be filled out entirely or your submission will not be accepted. **CMP and ECU Calculator are common Engineering requirements; contact Engineering to discuss. REQUIRED 24”x36” PLANS Note: Sheets must be in the following order. Existing plans required for all additions & alterations. Submittal Requirements New Construction Addition Alteration/ Remodel Alteration (Interior only) Demo (Complete) Repair Cover Sheet Survey Fire Area Sheet 06/08/2023 Updated 3/9/22 Page 3 of 5 Submittal Requirements New Construction Addition Alteration/ Remodel Alteration (Interior only) Demo (Complete) Repair Site Plan CREMP/RREMP Plan Floor Plans: Existing & Proposed Reflected Ceiling Plans Lighting Plan w/ spec sheet(s) Occupancy/ Means of Egress Plans Separation/Fire Resistance Plans Fire Resistant Assembly Listed Installation Details Accessibility Plans & Details Roof Plan Elevations/ Height Sections Details Fireplace Details 06/08/2023 Updated 3/9/22 Page 4 of 5 Submittal Requirements New Construction Addition Alteration/ Remodel Alteration (Interior only) Demo (Complete) Repair Schedules Excavation/ Earth Retention Plans Civil Plans *discuss directly with Engineering Electrical Plans Kitchen Plans Mechanical Plans Plumbing Isometrics/ Flatometric Structural Plans ADDITIONAL NOTES and/or REQUIREMENTS 06/08/2023 Updated 3/9/22 Page 5 of 5 PRE-SUBMISSION BUILDING CHECKLIST REVIEWED AND ACCEPTED: CITY STAFF NAME: _____________________________________________________________ DATE: ________________________________ PERMIT APPLICANT DECLINES TO CONDUCT A PRE-BUILDING PERMIT SUBMISSION MEETING WITH BUILDING STAFF AND UNDERSTANDS THAT FAILING TO DO SO MAY RESULT IN A LENGTHIER BUILDING REVIEW PROCESS: PERMIT APPLICANT NAME: _________________________________________________________ DATE: _________________________________ 06/08/2023