HomeMy WebLinkAboutFile Documents.413 E Main St.0029-2023-BCOM (8)Updated 3/9/22 Page 1 of 5
City of Aspen Building Permit Application Checklist
for Commercial and Multifamily Projects (IBC)
PROJECT ADDRESS_________________________________________________ DATE___________________
Note: This checklist is specific to Building Department requirements for various building permit application types. For Zoning, Engineering, Parks,
Utilities, and WELS requirements visit their pages at http://www.aspen.gov.
Building permit application submissions must include ALL the Submittal Requirements on this checklist or they will not be accepted. Refer to the
IBC Building Submittal Guide for more information about each requirement. Submittal guides, required forms and other resources can be found in
the Building Department Document and Resource Library.
Submit all documents and drawings in PDF format via the Salesforce portal. Follow File Preparation Standards for all files submitted.
REQUIRED 8 ½” X 11” DOCUMENTS
Submittal
Requirements
New
Construction
Addition Alteration/
Remodel
Alteration
(Interior only) Demo
(Complete) Repair
Permit
Application
Packet*
Asbestos test and
clearance reports
State Asbestos
Demolition
Approval Notice
Fireplace
Registration Form
& Manufacturer’s
installation
instructions
Energy Code
Compliance
(REScheck,
COMcheck, or
prescriptive path)
U-Factor
Fenestration
Docs
CREMP/RREMP
documents
Line Grade
Verification Form
06/08/2023
Updated 3/9/22 Page 2 of 5
Submittal
Requirements
New
Construction
Addition Alteration/
Remodel
Alteration
(Interior only)
Demo
(Complete)
Repair
Signed Special
Inspection and
Testing
Agreement
Verification of
Structural
Integrity
Soils Report
Mechanical Docs
Photos
Unit/Building
relationship
CMP**
Residential ECU
Calculator**
Water/sewer
Service
Disconnect
Applications
*Permit Application Packet must be filled out entirely or your submission will not be accepted.
**CMP and ECU Calculator are common Engineering requirements; contact Engineering to discuss.
REQUIRED 24”x36” PLANS
Note: Sheets must be in the following order. Existing plans required for all additions & alterations.
Submittal
Requirements
New
Construction
Addition Alteration/
Remodel
Alteration
(Interior only) Demo
(Complete) Repair
Cover Sheet
Survey
Fire Area Sheet
06/08/2023
Updated 3/9/22 Page 3 of 5
Submittal
Requirements
New
Construction
Addition Alteration/
Remodel
Alteration
(Interior only)
Demo
(Complete)
Repair
Site Plan
CREMP/RREMP
Plan
Floor Plans:
Existing &
Proposed
Reflected Ceiling
Plans
Lighting Plan w/
spec sheet(s)
Occupancy/
Means of Egress
Plans
Separation/Fire
Resistance Plans
Fire Resistant
Assembly Listed
Installation
Details
Accessibility
Plans & Details
Roof Plan
Elevations/
Height
Sections
Details
Fireplace Details
06/08/2023
Updated 3/9/22 Page 4 of 5
Submittal
Requirements
New
Construction
Addition Alteration/
Remodel
Alteration
(Interior only)
Demo
(Complete)
Repair
Schedules
Excavation/
Earth Retention
Plans
Civil Plans
*discuss directly
with Engineering
Electrical Plans
Kitchen Plans
Mechanical Plans
Plumbing
Isometrics/
Flatometric
Structural Plans
ADDITIONAL NOTES and/or REQUIREMENTS
06/08/2023
Updated 3/9/22 Page 5 of 5
PRE-SUBMISSION BUILDING CHECKLIST REVIEWED AND ACCEPTED:
CITY STAFF NAME: _____________________________________________________________
DATE: ________________________________
PERMIT APPLICANT DECLINES TO CONDUCT A PRE-BUILDING PERMIT SUBMISSION MEETING
WITH BUILDING STAFF AND UNDERSTANDS THAT FAILING TO DO SO MAY RESULT IN A
LENGTHIER BUILDING REVIEW PROCESS:
PERMIT APPLICANT NAME: _________________________________________________________
DATE: _________________________________
06/08/2023