HomeMy WebLinkAboutFile Documents.155 Miners Trail Rd.0068-2022-BCHO (6)SMOKE ALARMS AND
CARBON MONOXIDE
DETECTORS REQUIRED
THROUGHOUT DWELLING
UNIT PER CITY OF ASPEN
MUNICIPAL CODE 8.15
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
SEE NOTES #1 PLANS
It should be known that this review shall
not relieve the applicant of their
responsibility to comply with the
requirements of the City of Aspen
Municipal Code. Pursuant to
Sec.26.104.050, any permit or approval
issued in error or otherwise not in
conformity with the requirements of this
Title, shall be void. Similarly, any permit
or approval issued in reliance upon or
as a result of, a materially false
statement or representation made in
the process of obtaining the permit or
development approval shall, likewise,
be void. Any person having received a
void or voidable permit or approval
shall not be relieved from having to
comply with all applicable terms and
conditions of this Title and the City shall
not be estopped from fully enforcing
same.
bobn
10/24/2022ZONING
REVIEWED BY ZONING
10/24/2022 bobn
It should be known that this review shall
not relieve the applicant of their
responsibility to comply with the
requirements of the City of Aspen. The
review and approval by the City is
offered only to assist the applicant's
understanding of the applicable Land
Use Code requirements. The issuance
of a permit based on construction
documents and other data shall not
prevent the City of Aspen from
requiring the correction of errors in the
construction documents and other
data.
ALL OUTDOOR LIGHTING
MUST COMPLY WITH
THE CITY OF ASPEN LIGHTING CODE
SECTION 26.575.150
0097-2021-BRES
Blissful LLC
155 Miners Trail
273707323002
APPLICATION ACCEPTED DATE: 2022-09-12 PERMIT NUMBER: 0068-2022-BCHO
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT COVERSHEET
PROPERTY INFORMATION
ADDRESS: 155 MINERS TRL RD UNIT:
PARCEL ID: 273707323002 LEGAL DESCRIPTION: MOCKLIN
OWNER: BLISSFUL LLC
PERMIT CONTRACTOR: IA SEDGWICK INC
DESCRIPTION OF WORK Revised lower patio footprint to fit in building envelope. Added steel stair off south side of deck. Added stairs
from front entry porch to garage exterior. Further details on REMP locations and calcs. New stone bench on
lower patio. Removed center column of garage (see additional structural submitted 07- 15 to original permit
0097-2021-BRES. Additional skylight shown on roof. Removed column at M Bedroom 201 between door and
windows. Minor exterior material changes to north side of garage.
USE OF BUILDING Single Family FIRE SPRINKLER REQUIRED? No
CLASS OF WORK Residential FIRE SPRINKLER TYPE
BUILDING TYPE (IRC) One family REQUIRED SPECIAL
INSPECTIONS
High-Strength Bolting;Structural
Steel Welding
CONSTRUCTION TYPE ENERGY CODE COMPLIANCE RESCheck UA Alternative
OCCUPANCY GROUP (IBC) R-2 WORK CHANGES BUILDING
FOOTPRINT? No
CODE EDITIONS 2015 IRC TOTAL SPA SQ.FT. 37
OTHER CODE EDITIONS 2015 IEBC, 2020 NEC TOTAL SNOWMELT SQ.FT. 1,081
HISTORIC PROPERTY? No TOTAL POOL SQ.FT.
FIRE SPRINKLER EXISTING?
SEE NOTES #1 PLANS
1
SPECIAL INSPECTION REQUIRED:
-Structural steel welding: Field & Shop
-High strength bolting
-Epoxy anchors
-Intumescent paint
-Spray applied fire resistive materials
-Permanent micropiles
Special inspection is required per 2015 IBC
section 1704. Inspector to verify that copy of
agreement for inspection program to be on
the job site prior to performing any
inspections. A copy of all Special Inspector
field reports to be on the job site for
inspectors' review if requested. Failure to
comply may result in denial of inspection.
External Energy Use Approved
RREMP CREMP
PERMIT #:_______________DATE:________
SNOWMELT:_____________________________
POOL: _____________________________
SPA: _____________________________
OFFSET:________________________________
REMP SHEET: __________________________
REVIEWED BY: _________________________
SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S.
All snowmelt systems shall meet the following:
-Any portions in the Right of Way must be on a separate zone. A ROW
permit and Permanent Encroachment License are required.
-R10 insulation shall be installed under the area to be snow melted or R5
insulation shall be installed under and at the slab edges. (Ordinance 11
Series 2011)
-Automatic controls installed for system shut off when pavement
temperature is above 50°F and no precipitation is falling. (2009 IECC
Sec. 403.8 & 503.2.4.5)
-Automatic or manual controls installed for system shut off when outdoor
temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5)
-Inspection by testing hydrostatically at 1½ times max system design
pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec.
1208.1)
MINIMUM BOILER AFUE: _________________
0097-2021-BRES 1/6/22
1081 SF
37 SF (exempt)
A3.1-A3.3
0
75%
Jim Pomeroy
General Electrical Requirements
Any areas affected by the renovation must be brought
up to the current electrical code including:
tamperproof receptacles (NEC 406.12),
ground-fault circuit interrupter protection (NEC 210.8),
arc-fault protection (NEC 210.12),
receptacle spacing (NEC 210.52) etc.
01/06/2023
jimp