HomeMy WebLinkAboutFile Documents.1215 Snowbunny Ln.0063-2022-BRES (14)SMOKE ALARMS AND
CARBON MONOXIDE
DETECTORS REQUIRED
THROUGHOUT DWELLING
UNIT PER CITY OF ASPEN
MUNICIPAL CODE 8.15
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
It should be known that this review shall
not relieve the applicant of their
responsibility to comply with the
requirements of the City of Aspen
Municipal Code. Pursuant to
Sec.26.104.050, any permit or approval
issued in error or otherwise not in
conformity with the requirements of this
Title, shall be void. Similarly, any permit
or approval issued in reliance upon or
as a result of, a materially false
statement or representation made in
the process of obtaining the permit or
development approval shall, likewise,
be void. Any person having received a
void or voidable permit or approval
shall not be relieved from having to
comply with all applicable terms and
conditions of this Title and the City shall
not be estopped from fully enforcing
same.
May 2, 2022
Bryan May Architecture
501 Rio Grande Pl Suite 109
Aspen, CO 81611
Attn: Bryan May
RE:Structural Remodel
1215 Snowbunny Lane Unit B, Aspen, CO 8161
Bryan,
We have reviewed the Schematic Pricing Drawings for the remodel at 1215 Snowbunny Lane, Unit B
provided by your office, dated February 18, 2022. The drawings show a single family residence,
approximately 2,700 square feet in size with an attached garage and a finished basement. We
understand that as a part of the remodel, many of the interior walls will be reconfigured and/or removed.
Prior to removal or demolition of any interior walls or framing members, internal wall and ceiling finishes
shall be partially removed to allow observation of the structural system. Once the structure is visible, we
shall be contacted to perform a structural observation of the exposed structure in order to determine the
structural implications of the proposed modifications. Demolition or removal of any framing members
shall not proceed until this visit is completed.
If structural reinforcement, strengthening, or modifications are necessary, we can provide sealed
structural plans and details as required.
We appreciate the opportunity to work with you and your team again. If you have further questions or
concerns, please feel free to reach out. We look forward to the project.
Sincerely,
Tim Strickland, P.E.
Principal
2225 E. MURRAY HOLLADAY RD., SUITE 110 ::SALT LAKE CITY, UTAH 84117 ::801.274.3950 ::structuralds.com
May 2, 2022
05/24/2022
08/17/2022
kylas
427 Rio Grande Place, Aspen, CO 81611
(970) 920.5090
www.aspen.gov
NOTICE OF EXEMPTION AND AUTHORIZATION TO APPLY FOR LAND
USE/BUILDING PERMITS DURING THE EFFECTIVE TERM OF
ORDINANCE #27, SERIES OF 2021
Property Address:
Parcel ID Number:
Property Owner:
Representative/email:
Scope of Work (Provide narrative here and a separate pdf which is a succinct and
clear set of supporting documents, to be attached to this form as Exhibit A, such as
Letters of Completeness, Resolutions, Development Orders, Land Use Case
numbers, Building Permit numbers etc. If the representation being made is that the
work does not involve dimensional changes prohibited by the moratorium provide
existing and proposed calculations, f loor Plans and and elevations to be attached:
___________________________________________________________________
___________________________________________________________________
Due to the circumstances noted below, the above referenced project as defined by
the Scope o f Work is exempt from the application of Ordinance #27, Series of 2021,
and is authorized to pursue a land use review and/or building permit review during
the effective term o f Ordinance #27, Series of 2021, an ordinance which generally
places a moratorium on residential development. This authorization does not
guarantee issuance of a building permit or approval of any land use application. The
applicant must submit complete information and pursue all authorized approvals in a
timely fashion, adhering to all deadlines for submission, terms of Vested Rights,
response times required to maintain an active building permit, and all other Land Use
Code and Building Code requirements in effect as of December 8, 2021. Any
amendments and or additional approvals not addressed or identified in the
application, may be subject to Ordinance #27, Series of 2021.
The project described above is permitted to proceed with land use review because
(check all that apply):
Interior remodel with window and door replacement.
1215 Snowbunny Ln. Unit B
273512236002
Pamela Rosenau
bmay@bryanmayarchitecture.com
05/24/2022
□A land use application for a Development Order or Notice of Approval was
submitted to the Community Development Department prior to final passage of
the ordinance on December 8, 2021, and was subsequently deemed to be
complete by the Community Development Department Director.
□The land use application is seeking a Development Order or Notice of Approval
for a project consisting of 100% Af fordable Housing as that term is defined at
§26.104.100 of the Aspen Municipal Code, or as may be deemed necessary for
the issuance of Certificates of Affordable Housing for a 100% Affordable Housing
project, or as determined by the Community Development Director.
□The land use application involves Voluntary AspenModern designation
processes that meet the requirements of Section 26.415.025.C and
26.415.030.
□The land use application or administrative request may be necessary to issue
exempt building permits as described below, and as determined by the
Comm unity Development Director.
The project described above is permitted to submit for building permit review
bec ause (check all that apply):
□A building permit application was submitted to the Community Development
Department prior to final passage of the ordinance on December 8, 2021, and
was subsequently deemed to be c omplete by the Chief Building Official.
□It is a building permit for a project that will not increase the gross square
footage of development, Net leasable area, or Net livable area of any building
and does not m eet the definition of demolition.
□It is a building permit for a project that will not increase the Height of any
building. This includes additions to or replacement of mechanical equipment or
energy eff iciency systems pursuant to height exemptions as set f orth at
§26.575.020 of the Aspen Municipal Code, or as determined by the Community
Development Director.
□It is a building permit for commercial and lodge development as stand-alone
uses on a parcel or property.
□The project has received or is eligible to receive a Development Order or
Notice of Approval on the effective date of this ordinance.
□It is a building perm it for 100% affordable housing projects as that term is
defined at §26.104.100 of the Aspen Municipal Code.
□It is a building permit for demolition or repair of non-habitable structures.
Issued on ___________________, 20___, this certificate is valid through the
effective date of Ordinance #27, Series of 2021, or any Ordinance which supersedes
a provision of Ordinance #27, Series of 2021 in a manner which is relevant to the
Scope of Work. A copy of this certificate is required when applying for any land use
review or building permit. This Notice is not a Development Order or Administrative
Determination that is subject to appeal.
___________________________________
Phillip Supino
Community Development Director
Disclaimer: This exemption is given based on the information provided by the applicant. If changes are
made, or the scope, after a more detailed review, is found to be subject to Ordinance 27, 2021, the exemption may be revoked.
Exhibit A: Floor plans and elevations representing scope of work
Planning Director, for
n
n
n
22February 11
05/24/2022
FIRE
SPRINKLERS
REQUIRED
Post demo Inspection by the Fire Marshall
required to determine if the scope of work will
not require fire sprinkler installation,
otherwise fire sprinkler installation will be
required with this permit as the building
exceeds 5,000 sf of gross fire area.
08/18/2022
justinh
APPLICATION ACCEPTED DATE: 2022-05-24 PERMIT NUMBER: 0063-2022-BRES
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT COVERSHEET
PROPERTY INFORMATION
ADDRESS : 1215 SNOWBUNNY LN B UNIT:
PARCEL ID: 273512236002 LEGAL DESCRIPTION: COTTONTAIL TOWNHOUSES
OWNER : LINDEN LANE LLC
PERMIT CONTRACTOR : GF WOODS CONSTRUCTION INC
DESCRIPTION OF WORK Full interior remodel of Unit B of the Cottontail Townhouses on Snowbunny Lane including replacing exterior
doors and windows.
USE OF BUILDING Multi -Family FIRE SPRINKLER REQUIRED? Yes
CLASS OF WORK Residential FIRE SPRINKLER TYPE NFPA 13 D
BUILDING TYPE (IRC) Two family REQUIRED SPECIAL
INSPECTIONS
CONSTRUCTION TYPE VB ENERGY CODE COMPLIANCE
OCCUPANCY GROUP (IBC) WORK CHANGES BUILDING
FOOTPRINT? No
CODE EDITIONS 2015 IRC TOTAL SPA SQ.FT.
OTHER CODE EDITIONS TOTAL SNOWMELT SQ.FT.
HISTORIC PROPERTY? No TOTAL POOL SQ.FT.
FIRE SPRINKLER EXISTING? No
0063-2022-BRES
LINDEN LANE LLC
1215 SNOWBUNNY LN
273512236002