HomeMy WebLinkAboutFile Documents.12 E Water Pl.0033-2023-BROF (11)SMOKE ALARMS AND
CARBON MONOXIDE
DETECTORS REQUIRED
THROUGHOUT DWELLING
UNIT PER CITY OF ASPEN
MUNICIPAL CODE 8.15
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
It should be known that this review shall
not relieve the applicant of their
responsibility to comply with the
requirements of the City of Aspen
Municipal Code. Pursuant to
Sec.26.104.050, any permit or approval
issued in error or otherwise not in
conformity with the requirements of this
Title, shall be void. Similarly, any permit
or approval issued in reliance upon or
as a result of, a materially false
statement or representation made in
the process of obtaining the permit or
development approval shall, likewise,
be void. Any person having received a
void or voidable permit or approval
shall not be relieved from having to
comply with all applicable terms and
conditions of this Title and the City shall
not be estopped from fully enforcing
same.
Extent of proposed
work
12
13
Hardscape patio
Hardscape walkway
All areas not called
out as hardscape
are landscaping
Existing downspout
to be replaced like
for like. Drains to
patio
Existing downspout to be
replaced like for like. Drains
to landscapingExisting gutter to be
replaced like for like
Existing gutter to be
replaced like for like
Existing gutter to be
replaced like for like.
Downspout to
landscaping
Site Plan
Roof Replacement
12 - 13 E Water PL
N
Existing downspout to be
replaced like for like. Drains
to landscaping
04/17/2023
Proposed Roof Assembly Drawing – Show all layers/components from the roof sheathing up. Each component must b
product and manufact urer name and existing to remain components and number of layers. Show flashing and ice bar
Existing roofing and number of layers: _________________________________________ 3 layers: 3/4" CDX ply, #15 bldg. paper, asphalt shingles
Roof Assembly Listed Below
05/03/2023
linzhid
0033-2023-BROF
TERRY TRINITY & TRACY R
12 E WATER PL
273513204012
Snow stops required at all locations
where roofs could shed snow onto
walkways, stairs, alleys, decks, exits,
utilities and meters, emergency escape
and rescue opening window wells, or
adjacent properties - IBC 1513/COA
8.20.020(z).
Heat trace/tape must be self-regulating
type cable and must include automatic
controls and timer capable of turning
off the system when the outdoor
temperature is above 50 degrees and
during daylight hours.
0045-2023-BROF
FABROCINI ROBERT
13 E WATER PL
273513204013