HomeMy WebLinkAboutInspection.204 S Galena St.0030-2022-BCOM (2)Activity Date:02/07/2023 Technician:Barto, Matthew
Placement Location:
Entry Level Slabondeck gridline "C" at 12" o/c.
Plans/Details:AUE #22075 dated 09/02/22
Items Observed:
Number of Inserts:70
Type of Anchor Specified:#4 grade 60 rebar
Type of Epoxy Specified:Hilti HITHY 200R V3
Expiration Date and Instructions Read:Yes
Specified Depth of Embedment:4.0"
Actual Depth of Embedment:4.0" to 4.5"
Diameter of Hole:5/8"
Cleanliness:
Yes No
Conformance:
Discrepancies Observed:
Yes No
General Remarks:
Dowel into existing for new 3" slab at entryways. Holes cleaned using wire brush and compressed air prior to epoxy
application.
Images:
✔
✔
Drilled and Epoxied Anchors DEA000001Report #:
02/07/2023
Glenwood Springs
234 Center Drive
Glenwood Springs, CO 81601
Phone: 9709452809
Client:
Sachse Construction
3663 Woodward Avenue
Suite 500
Detroit, MI 48201
Project:
GS06753.000F360
Gucci Aspen
204 S Galena Street
Aspen, CO
Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 1 of 2Page 1 of 1