Loading...
HomeMy WebLinkAboutInspection.204 S Galena St.0030-2022-BCOM (2)Activity Date:02/07/2023 Technician:Barto, Matthew Placement Location: Entry Level Slab­on­deck gridline "C" at 12" o/c. Plans/Details:AUE #22075 dated 09/02/22 Items Observed: Number of Inserts:70 Type of Anchor Specified:#4 grade 60 rebar Type of Epoxy Specified:Hilti HIT­HY 200­R V3 Expiration Date and Instructions Read:Yes Specified Depth of Embedment:4.0" Actual Depth of Embedment:4.0" to 4.5" Diameter of Hole:5/8" Cleanliness: Yes No Conformance: Discrepancies Observed: Yes No General Remarks: Dowel into existing for new 3" slab at entryways. Holes cleaned using wire brush and compressed air prior to epoxy application. Images: ✔ ✔ Drilled and Epoxied Anchors DEA­000001Report #: 02/07/2023 Glenwood Springs 234 Center Drive Glenwood Springs, CO 81601 Phone: 970­945­2809 Client: Sachse Construction 3663 Woodward Avenue Suite 500 Detroit, MI 48201 Project: GS06753.000F­360 Gucci Aspen 204 S Galena Street Aspen, CO Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 1 of 2Page 1 of 1