Loading...
HomeMy WebLinkAboutInspection.204 S Galena St.0030-2022-BCOM (3)Activity Date:02/14/2023 Technician:Barto, Matthew Placement Location: Entry Level slab­on­deck grid "C" @12" on center (remaining at slab SE corner) Plans/Details:AUE #22075 dated 09/02/22 Items Observed: Number of Inserts:4 Type of Anchor Specified:#4 grade 60 rebar Type of Epoxy Specified:Hilti HIT­HY 200­R V3 Expiration Date and Instructions Read:Yes Specified Depth of Embedment:4.0" Actual Depth of Embedment:4.0" to 4.5" Diameter of Hole:5/8" Cleanliness: Yes No Conformance: Discrepancies Observed: Yes No General Remarks: As requested, a site visit was made to observe drilled and epoxied anchor installation. The four remaining holes were drilled into an existing concrete slab after demolition of the existing concrete ramp. We observed contractors clean the holes using a wire brush and compressed air prior to epoxy application. The contractor was notified of our observations. Our office will be contacted when additional services are required. Images: ✔ ✔ Drilled and Epoxied Anchors DEA­000002Report #: 02/14/2023 Glenwood Springs 234 Center Drive Glenwood Springs, CO 81601 Phone: 970­945­2809 Client: Sachse Construction 3663 Woodward Avenue Suite 500 Detroit, MI 48201 Project: GS06753.000F­360 Gucci Aspen 204 S Galena Street Aspen, CO Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 1 of 2Page 1 of 1