Loading...
HomeMy WebLinkAboutInspection.204 S Galena St.0030-2022-BCOM (4)Activity Date:02/07/2023 Technician:Barto, Matthew Placement Location:Store Entry Level between grids "A" and "C".Plans/Details:AUE #22075 dated 09/22/22 Items Observed: Placement Type Observed: Grade Beam Pier Cap Column Structural Slab Slab on Grade Slab on Deck Footing Wall Other Items Checked: Bar Size Bar Quantity and Spacing Lap Length Cover Form Void Dowel Bars Other UFER Ground: Yes No N/A Conformance: The items observed were found to be in general conformance with the approved drawings and standard construction practice: Yes No Discrepancy: Yes No General Remarks: Installation approximately 90% complete. Further demo of existing slab planned at southeast corner work area. Images: Comments:East view presently ✔ ✔ ✔ ✔ ✔ ✔ ✔ Reinforcing Steel Report RSPO­000001Report #: 02/07/2023 Glenwood Springs 234 Center Drive Glenwood Springs, CO 81601 Phone: 970­945­2809 Client: Sachse Construction 3663 Woodward Avenue Suite 500 Detroit, MI 48201 Project: GS06753.000F­360 Gucci Aspen 204 S Galena Street Aspen, CO Legal: Contractor to ensure integrity of completed work is maintained during subsequent construction activities.Page 1 of 2Page 1 of 1