Loading...
HomeMy WebLinkAboutSub Permit.1265 Red Butte Dr.0113-2022-BRESClose Window Print This Page Expand All | Collapse All 0030-2023-ELEC Number 0030-2023-ELEC Record Type Electrical 1265 RED BUTTE DR Owner Martyna Wojtkowska Original Number 23-0612 Status Closed - Final Type Electrical Reason for Cancel or Compl. Review Fail Applicant CRAIG WILLIAM NICHOLS JR No INDEPENDENT ELECTRIC INC Yes Project Master Building Permit 0113-2022-BRES Land Use Planning Application Supplemental Permit?No Permit Contractor INDEPENDENT ELECTRIC INC Supplemental/Addendum Master Permit Valid Business License on Account HPC-ZON-EH-UTIL Review Imported HPC-ZON-EH-UTIL Review-2 Required Submissions Eng Review Documents Resubmitted Parks-Prkng-San Review Conditional Inspections Conditional Final Insp Action Items Hold Reason Conditional Flat Fee Formula SupN,2023 Conditional Tiered Fee Formula Discount All Fees (%) Conditional Tiered SqFt Fee Formula ERN,Fee Discount Reason Dates 3/9/2023 10/19/2023 3/9/2023 Expiration Date 2/12/2024 3/9/2023 3/9/2023 0 0 Close/CO Issuance Date 10/19/2023 Milestone Current Days in City Hands 0 Job Location Address 1265 RED BUTTE DR, ASPEN : 273501306003 Legal Description Subdivision: RED BUTTE EAST Lot: 3 Site Address Display on Map Historic Property?No Historic District?No Zoning Lot 3 HPC Certificate of Appropriateness? Zone District R-30 HOA/Covenant Deed Restricted? Work Details Use of Building Single Family Work in a Setback?No Use Class Residential Exterior Lighting Added or Changed? Yes Class of Work Alteration Photovoltaic Installation No $35,000.00 YES Reason for Valuation Change NO 4,165 No Description Removal of all decorative fixtures Dining/ kitchen LED (under 10') Kitchen LED (under 5') Kitchen Drawer outlet Install 123 Lotus cans (LSG3-27K-WH Kitchen rough-in and trim out. Includes power hook-up fro System Size in kW Address Aspen Internal? Account Is This Associated w/a Building Permit? Hold All Reviews Create Fees Create Fees 2 Price Book New Application Date Last Activity Date Application Complete Date Application Accepted Date Due Date Issue Date Override Expiration Date Days to Issue Milestone Current Days in Applicant Hand Eden Address Valuation City of Aspen Electrical Service? New or Upgraded Service? Sq Ft of Building Work Area Other Distributed Energy System? 3/24/25, 7:56 PM 0030-2023-ELEC ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a038X00002AHTh0QAH/p 1/5 2 dishwashers, microwave, cooktop, wall oven, column refrigerator, column refrigerator, and range hood including blower. Install of all decorative fixtures per ID plans 9/20/22 Steamer power Power to air conditioner condenser and make-up air Garage- move switches at back wall and create switch leg for 3rd bay, Add switches at new door, Add 2 lights ceiling Game room- Trim chandelier, add power to 2 appliances, add power for 2 tv's Add backsplash outlets at built-in, Add 25' LED lighting in shelves and under cabs Powder bath 2- Delete sconce light, remove 1 recessed can, add ceiling mount fixture Powder bath 1- Remove/ replace sconce and add recessed can Exterior sconce light swaps - 12 Entry- Add interior sconce lights Dining room/ living room/ kitchen- Rewire, remove and replace recessed cans Master bedroom- Change 2 gang switch at back deck to 3 gang Add 2 new sconces at bed wall, rewire cans as needed in ceiling Add ceiling fan switch leg Master bath- move his/ her sconces (2 each). Add power for his and her lighted mirror Add lighted mirror to shower. Add 1 outlet to his and her vanities (inside cabinet) Provide drawer outlet for each Add 1 outlet in her cabinet (not in drawer0 Add power to Carolina II toto toilet Remove hair dryer power, Raise recessed lights at shower Laundry- add power to ironing board area for ironing board Bath 2- move ceiling light pendants to be sconce lighting Closet 2- Change light fixture to LED fixture Bedroom 2- Add ceiling fan and switch leg for it Office- Two recessed cans above stairs to be their own isolated switch All other lights to switch the same. Trim fan, Add outlet for TV, add outlet for desk/ computer Storage 122- Add ceiling fan and switch, change fluorescent light in closet to LED Bath 3- Move sconce lights from 6'8 center, add heat mat at bathroom, move switch by bedroom 3 door- 1-1/2" Bedroom 3- Add fan and switch for it. Demo/ remove sconce lights Bedroom 4- Add ceiling fan and switch. Remove sconce lights. Move tv Hall to bedroom 4 and storage 122- All hallways lights to get wired together (4-way) or two separate 2 ways Step lights- Add 13 step lights All sconce lights at stairways to be removed with power and switch leg removed as well No Battery Storage?No No Code Editions MEP Financials $662.00 Total Payments $662.00 Total Balance $0.00 System Information Number 0030-2023-ELEC Community Visibility Created By CRAIG NICHOLS, 3/9/2023 8:06 AM 0033s0000107SdoAAE,0033s0000107SdoAAE Last Modified By Aspen Avocette, 9/28/2024 1:54 AM VIP Form Tool VIP Foreign Language VIP Form Template Permit Application IsTestData?VIP Template Status [{"parentCategoryId":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000UwvPUAS"}, {"parentCategoryId":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000UwvNUAS"}, {"parentCategoryId":"a2E6A000000UwvgUAC","isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000Uz2A {"parentCategoryId":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000UwvaUAC"}, {"parentCategoryId":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000UwvZUAS"}, {"parentCategoryId":null,"isSubmit":true,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000Ux1dUAC"}] VIP Submitted 3/9/2023 8:14 AM Action Items View/Print Permit Link Attachment Activity History Email: Issued Electrical Permit 0030-2023-ELEC at 1265 RED BUTTE DR, ASPEN : 273501306003 Work Affects Exterior of Building? Affects Parking/Alleys/Loading?Permit Comments Other Code Editions Total Fees Contact IDs 3/24/25, 7:56 PM 0030-2023-ELEC ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a038X00002AHTh0QAH/p 2/5 Type Billable Assigned To Martyna Wojtkowska Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 3/9/2023 Days in Applicant's Hands Comments To: craig@independentelectric.net CC: BCC: Attachment: MEP_Permit_Letter__20230309.pdf Subject: Issued Electrical Permit 0030-2023-ELEC at 1265 RED BUTTE DR, ASPEN : 273501306003 Body: Hello CRAIG WILLIAM NICHOLS JR, Please find attached your issued Electrical permit for 1265 RED BUTTE DR, ASPEN : 273501306003. If you have any questions please let us know. Thank you. Email: Permit Fees Due: 0030-2023-ELEC at 1265 RED BUTTE DR, ASPEN : 273501306003 Type Billable Assigned To Martyna Wojtkowska Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 3/9/2023 Days in Applicant's Hands Comments To: craig@independentelectric.net CC: BCC: Attachment: --none-- Subject: Permit Fees Due: 0030-2023-ELEC at 1265 RED BUTTE DR, ASPEN : 273501306003 Body: If you have not already paid the fees due on your permit 0030-2023-ELEC, at 1265 RED BUTTE DR, ASPEN : 273501306003 , please log into the Aspen Permitting Portal to pay them. If you pay online, be aware that credit card or e-check transaction fees will apply. If you would like to pay by check, you can mail payments to the following locations: • Building and related permits: Community Development, 427 Rio Grande • Parking Reservation permits: Parking Department, 427 Rio Grande • Pitkin County Water Permit: Utility Billing., 427 Rio Grande • ROW and encroachments: 427 Rio Grande • Tree permits: Parks Dept., 585 Cemetery Lane Aspen • Utility Connection Permits: Utility Billing., 130 S Galena, 1st Floor • Electric Community Investment Fee: Utility Billing., 130 S Galena, 1st Floor Current Amount Due: $662.00 Instructions to see detail of fees due: - Log in to the Portal here: https://cityofaspen.force.com/applicantportal and click on Permits menu - Open the permit by clicking on the permit number link - Click on the Related tab (next to Details tab) and scroll down to Fees section - If all fees are not visible, click the “View All” link - To filter fees, click on the black funnel icon at the top right. (Example: to only see the fees due at permit submission, select “Complete Pending Submittal Fees” under Permit Fees Due At section and then click Apply button.) Instructions to pay fees are found here: https://www.cityofaspen.com/DocumentCenter/View/5008/Paying-for-an-Application-?bidId= Thank you! City of Aspen Contacts CRAIG WILLIAM NICHOLS JR Account INDEPENDENT ELECTRIC INC Type Applicant Active Contractor License Count 1.00 Number 0055388 CRAIG WILLIAM NICHOLS JR Account INDEPENDENT ELECTRIC INC Type Contractor Active Contractor License Count 1.00 Number 0055389 Fees 0081632 Type Electrical Permit Fee Total $662.00 Waived/Refunded Amt Discount $ Outstanding $0.00 Fee Due At Ready for Issue Show in Cart Paid in Full Fee Paid Date/Time 3/24/25, 7:56 PM 0030-2023-ELEC ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a038X00002AHTh0QAH/p 3/5 Files MEP_Permit_Letter__20230309.pdf Last Modified 3/9/2023 3:06 PM Created By Martyna Wojtkowska Permit Application 2023-03-09 15:14:59.pdf Last Modified 3/9/2023 8:15 AM Created By CRAIG NICHOLS Inspections INS-0002092-23 Status Accepted as Noted Type Electric Subtype Rough Electrical Requested Date 5/15/2023 10:00 AM Scheduled Start Date 5/15/2023 Completed Date 5/15/2023 Owner Last Name Nye Permit Inspection Round Initial Inspection Closed TRUE INS-0005223-23 Status Pass/Accepted Type Electric Subtype Final Electrical Requested Date 10/18/2023 9:30 AM Scheduled Start Date 10/18/2023 Completed Date 10/18/2023 Owner Last Name Bennett Permit Inspection Round Final Inspection Closed TRUE Milestones Review Round 1 - 0030-2023-ELEC Status Approved Due Date Created Date 3/9/2023 Payments PY-016103 Related To 0030-2023-ELEC Amount $662.00 Created Date 3/9/2023 Payment Source R-0015123 Receipt - Amount Remaining R-0015123: $0 Permit History 10/19/2023 6:04 AM User Ric Bennett Action Changed Status from Issued to Closed - Final. 10/17/2023 8:59 AM User CRAIG NICHOLS Action Changed Expiration Date to 2/12/2024. Reviews REV-028848 Milestone Review Round 1 - 0030-2023-ELEC Status Approved Type MEPs Due Date Completed Date 3/9/2023 9:58 AM Owner Alias OOO3/31 On Hold Created Date 3/9/2023 Submissions Application for Photovoltaic (PV) Installation Form Actions Upload Submission Date Status Pending Required Description City of Aspen Electric Load Form – Application for Service Actions Upload Submission Date Status Pending Required Description Homeowner Association Compliance Form Actions Submission Date 3/9/2023 8:13 AM 3/24/25, 7:56 PM 0030-2023-ELEC ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a038X00002AHTh0QAH/p 4/5 Status Pending Required Description Copyright © 2000-2025 salesforce.com, inc. All rights reserved. 3/24/25, 7:56 PM 0030-2023-ELEC ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a038X00002AHTh0QAH/p 5/5