Loading...
HomeMy WebLinkAboutSub Permit.701 Gibson Ave.0086-2021-BRES (5)Close Window Print This Page Expand All | Collapse All 0073-2021-UTWC Number 0073-2021-UTWC Record Type Utility Water Connection 701 GIBSON AVE Owner Robert Gregor Original Number 21-1597 Status Closed - Final Type Utility Water Connection Reason for Cancel or Compl. Review Fail Applicant Leila Schwyhart No BLDG SEED ARCHITECTS Imported Project HPC-ZON-EH-UTIL Review Permit Contractor KEY ELEMENTS CONSTRUCTION Eng Review Yes Parks-Prkng-San Review Master Building Permit 0086-2021-BRES Conditional Inspections Conditional Final Insp Supplemental/Addendum Master Permit Action Items 2021 Hold Reason Permit Dates 10/19/2021 Expiration Date 10/20/2021 10/20/2021 5/10/2022 0 202 Milestone Current Days in City Hands 27 Close/CO Issuance Date 4/8/2024 Job Location Address 701 GIBSON AVE, ASPEN : 273707345003 Lot Site Address Display on Map Block Historic Property?No Legal Description Subdivision: HILL HOUSE Unit: C Historic District?No Zone District R-30 Property Information Common Building Name Already on City Water?Yes Public Building?No Class of Service Customer Single-Family In a Park?No 02-34070320-02 Other Use Water Service Area 1 Inside City Boundaries? Project Information Use of Building Single Family 1.00 Use Class Residential 1.00 Class of Work Alteration 1.00 1.00 Number of Meters Proposed 1 Description Existing Single Family Residence interior remodel and exterior landscape. CO Description Raw Water Information Please reference ECU calculator Is There Well or Wells on the Property? Does Project Involve Outdoor Irrigation? Yes 0 Address Aspen Internal? Account Is This Associated w/a Building Permit? Is this an Addendum Permit? Hold All Reviews Price Book New Application Date Application Complete Date Override Expiration Date Application Accepted Date Last Activity Date Issue Date Milestone Current Days in Applicant Hand Days to Issue Eden Address Utility Account Number Size of Existing Domestic Water Line Size of Proposed Domestic Water Line Size of Existing Fire Suppression Line If Residential App, Estimated New ECUs Size of Proposed Fire Suppression Line Identify ALL Sources of Water Acre-feet of Water Currently by Well 3/24/25, 7:41 PM 0073-2021-UTWC ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a034o00000FOyz6AAD/p 1/5 Irrigated Area Sq Ft 6,400 0 6400 sf spray 60 emitters of drip Is There a Pool, Spa or Water Feature? Yes Yes Water Service Requests New Tap?No Abandon Existing Tap No Existing Tap Modifications?No Abandon Existing Well No Internal Use Only Existing ECU Count Utility Investment Charge (Tap Fees) Final ECU Count Utility Investment Charge Paid Date of Existing Tap Date of New Tap Utility Hookup Charge Paid CO Status if Applicable Date of CO Cash in Lieu Paid CO Approved Date Well Development Charges Date of Final Connection Fee Payment Well Development Charges Paid Water Service Agreement Required? Summary of Prior Water Fees Paid Status of Final Agreement Financials $0.00 Total Payments $0.00 Fees Paid Total Balance $0.00 System Information Created By Leila Schwyhart, 6/9/2021 11:28 AM Last Modified By Aspen Avocette, 9/28/2024 1:36 AM Number 0073-2021-UTWC VIP Form Tool VIP Foreign Language VIP Form Template Permit Application VIP Submitted 10/19/2021 8:45 AM VIP Template Status [{"parentCategoryId":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000UwvPUAS"}, {"parentCategoryId":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000UwvNUAS"}, {"parentCategoryId":"a2E6A000000UwvhUAC","isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000Uwv {"parentCategoryId":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000UwvaUAC"}, {"parentCategoryId":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000UwvZUAS"}, {"parentCategoryId":null,"isSubmit":true,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryId":"a2E6A000000Ux1dUAC"}] Action Items View/Print Permit Link Attachment Activity History Email: Utility Connection Permit Final Type Billable Assigned To Tim Rohe Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 2/15/2024 Days in Applicant's Hands Comments To: leila@bldgseed.com CC: gabe@keyelementsconstruction.com BCC: Attachment: 701 Gibson Ave. Final UCP.pdf Subject: Utility Connection Permit Final Body: Hello Leila Schwyhart, Attached is your final Utility Connection Permit for the completed project at 701 GIBSON AVE associated with permit #: 0073-2021-UTWC. After review, please print, have signed by owner, and notarized. Once signed and notarized, please return UCP with payment, if applicable, to the Finance Department window located on the second floor of City Hall at 427 Rio Grande Place. Alternatively, you may upload the signed and notarized copy of the UCP as a SCANNED (not photographed) .pdf file and pay all fees due via Salesforce, but if submitting via Salesforce, please send a chatter to @Robert Gregor and @Cole Langford on the permit record once the document is uploaded and all fees are paid to serve as a “push” notification that these permit requirements are complete. Please reach out with any questions or concerns. Email: Permit Fees Due: 0073-2021-UTWC at 701 GIBSON AVE, ASPEN : 273707345003 Acre-feet of Water Rights to be Conveyed Indicate Amt, Source, and Use of Water Do Water Feat use Recirc/Recycled Water? Utility Hookup Charge Cash in Lieu Total Fees 3/24/25, 7:41 PM 0073-2021-UTWC ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a034o00000FOyz6AAD/p 2/5 Type Billable Assigned To Robert Gregor Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 11/16/2021 Days in Applicant's Hands Comments To: leila@bldgseed.com CC: BCC: Attachment: --none-- Subject: Permit Fees Due: 0073-2021-UTWC at 701 GIBSON AVE, ASPEN : 273707345003 Body: If you have not already paid the fees due on your permit 0073-2021-UTWC, at 701 GIBSON AVE, ASPEN : 273707345003 , please log into the Aspen Permitting Portal to pay them. If you pay online, be aware that credit card or e-check transaction fees will apply. If you would like to pay by check, you can mail payments to the following locations: • Building and related permits: Community Development, 130 S Galena St., 3rd Floor • Parking Reservation permits: Parking Department, 130 S Galena St, 1st Floor • Pitkin County Water Permit: Utility Billing., 130 S Galena, 1st Floor • ROW and encroachments: 201 N Mill St., Suite 203 • Tree permits: Parks Dept., 585 Cemetery Lane Aspen • Utility Connection Permits: Utility Billing., 130 S Galena, 1st Floor • Electric Community Investment Fee: Utility Billing., 130 S Galena, 1st Floor Current Amount Due: $7,093.84 Instructions to see detail of fees due: - Log in to the Portal here: https://cityofaspen.force.com/applicantportal and click on Permits menu - Open the permit by clicking on the permit number link - Click on the Related tab (next to Details tab) and scroll down to Fees section - If all fees are not visible, click the “View All” link - To filter fees, click on the black funnel icon at the top right. (Example: to only see the fees due at permit submission, select “Complete Pending Submittal Fees” under Permit Fees Due At section and then click Apply button.) Instructions to pay fees are found here: https://www.cityofaspen.com/DocumentCenter/View/5008/Paying-for-an-Application-?bidId= Thank you! City of Aspen Email: Utility Connection Permit Review Type Billable Assigned To Steve Wilson Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 11/16/2021 Days in Applicant's Hands Comments To: leila@bldgseed.com CC: BCC: Attachment: UCP_Insubstantial_Review__20211116.docx.pdf Subject: Utility Connection Permit Review Body: Hello Leila Schwyhart, Attached is your review Utility Connection Permit for the proposed project at701 GIBSON AVE associated with permit #: 0073-2021-UTWC After review, please print, have signed by owner, and notarized. Once signed and notarized, please return UCP with payment, if applicable, to the Finance Department window located on the first floor of City Hall at 130 S. Galena St. Alternatively, you may upload the signed and notarized copy of the UCP as a SCANNED (not photographed) .pdf file and pay all fees due via Salesforce, but if submitting via Salesforce, please send a chatter to @Robert Gregor and @Cole Langford on the permit record once the document is uploaded and all fees are paid to serve as a “push” notification that these permit requirements are complete. Please reach out with any questions or concerns. Thank you, Leila. Steve Wilson Planning Review Type Utilities Billable Assigned To Steve Wilson Number of Hours 2.00 Total Cost $650.00 Fee Generated Date Start Date Completed Date 11/16/2021 Days in Applicant's Hands Comments Contacts Leila Schwyhart Account BLDG SEED ARCHITECTS Type Applicant 3/24/25, 7:41 PM 0073-2021-UTWC ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a034o00000FOyz6AAD/p 3/5 Active Contractor License Count 0.00 Number 0037301 Account Type Architect or Engineer of Record Active Contractor License Count 0.00 Number 0037302 Account Type Owner Active Contractor License Count 0.00 Number 0037303 ROB RUSSELL Account KEY ELEMENTS CONSTRUCTION Type Contractor Active Contractor License Count 1.00 Number 0042129 Dana Koch Account KEY ELEMENTS CONSTRUCTION Type Contractor Active Contractor License Count 1.00 Number 0042130 Fees 0067770 Type Utility Connection Tap Fees Total $7,093.84 Waived/Refunded Amt $7,093.84 Discount $ Outstanding $0.00 Fee Due At Ready for Issue Show in Cart Paid in Full Fee Paid Date/Time Files 701 Gibson Ave. Final UCP Last Modified 2/15/2024 3:18 PM Created By Tim Rohe UCP_Insubstantial_Review__20211116.docx Last Modified 11/16/2021 2:19 PM Created By Steve Wilson Permit Application 2021-10-19 14:45:17.pdf Last Modified 10/19/2021 8:45 AM Created By Leila Schwyhart 701 Gibson Review Count Sheet Last Modified 11/16/2021 2:26 PM Created By Steve Wilson UCP_Insubstantial_Review__20211116.docx Last Modified 11/16/2021 2:14 PM Created By Steve Wilson Milestones Review Round 1 - 0073-2021-UTWC Status Approved Due Date Created Date 10/20/2021 Permit History 4/8/2024 12:28 PM User Robert Gregor Action Changed Status from Ready for Closure to Closed - Final. 4/8/2024 12:27 PM User Robert Gregor Action Changed Status from Issued to Ready for Closure. Reviews REV-021456 Milestone Review Round 1 - 0073-2021-UTWC Status Approved Type Engineering Water Due Date Completed Date 11/16/2021 2:21 PM Owner Alias SWilson On Hold Created Date 10/20/2021 Submissions 50.701Gibson.Res ECU Calc.20210503.xlsx Actions Submission Date 10/19/2021 8:44 AM Status Pending 3/24/25, 7:41 PM 0073-2021-UTWC ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a034o00000FOyz6AAD/p 4/5 Required Description Copyright © 2000-2025 salesforce.com, inc. All rights reserved. 3/24/25, 7:41 PM 0073-2021-UTWC ~ Salesforce - Enterprise Edition https://cityofaspen.my.salesforce.com/a034o00000FOyz6AAD/p 5/5