Loading...
HomeMy WebLinkAboutFile Documents.701 Gibson Ave.0086-2021-BRES (50)Engineering3_701 Gibson Ave Page: 1 Author: pjm File Name: 40.WaterEasement.701Gibson.20220308.pdf Fill in the easement agreement so I can send to Water Department & COA Attorney for signatures as well. 40.WaterEasement.701Gibson.20220308.pdf (4) Page: 1 Author: pjm File Name: 40.WaterEasement.701Gibson.20220308.pdf Comments on the water main easement will not hold up issuance of the permit, these comments need to be addressed prior to CO/LOC for the project - however finalizing this asap is recommended. Page: 4 Author: pjm File Name: 40.WaterEasement.701Gibson.20220308.pdf Easement needs to be signed by property owner for finalize the document. Page: 8 Author: pjm File Name: 40.WaterEasement.701Gibson.20220308.pdf This is the final easement, remove draft. Page: 3 Author: pjm File Name: 90.Civil.701Gibson.20220322.pdf Impacts to trees? Parks needs to approve the location of the inlet box. 90.Civil.701Gibson.20220322.pdf (3) ENT AGREEMENT ered into this _____ day of _________, 2022, a Colorado municipal corporation and home ress is 701 Gibson Avenue, Aspen, CO 81611 ls e City of Aspen municipal water distribution distribution system uses a waterline uses a tor’s property known as 701 Gibson Avenue, Fill in the easement agreement so I can send to Water Department & COA Attorney for signatures as well. EN T AGREEMENT into this _____ day of _________, 2022, olorado municipal corporation and home Comments on the water main easement will not hold up issuance of the permit, these comments need to be addressed prior to CO/LOC for the project - however finalizing this asap is recommended. Water Director APPROVED AS TO FORM: _____________________________ Aspen City Attorney GRANTOR: TRUE ROMANCE LLC, a Colorado limited liability company By: Name: Title: Address: 701 Gibson Avenue, Aspen, CO 81611 [acknowledgements follow] Easement needs to be signed by property owner for finalize the document. EXHIBIT C ater Department Easement Agreement missible Encroachments EXHIBIT DRAFT R3 Sunday, March 6, 2022 ments in the 25’ Utility Easement. Water Department will not be responsible for cess/repairs or replacement, it is the owner’s responsibility to replace infrastructure This is the final easement, remove draft. X: 1 2 . 5 + / - Impacts to trees? Parks needs to approve the location of the inlet box. A callout has been added to sheet C.2.001 to get approval from the parks department and for the city forester to be present during installation of the curb inlet. Comment Responses by High Country Engineering, Inc. are in red text below. 07/12/2022 Page: 3 Author: pjm File Name: 90.Civil.701Gibson.20220322.pdf Inlet box needs to be accessible for cleaning. Are there constraints on cleaning this inlet? Page: 3 Author: pjm File Name: 90.Civil.701Gibson.20220322.pdf THis sheet needs to be updated in the plan set & the drainage report narrative/calculations need to be updated with the new design. Include the variance in the next round of submittal DE N ; E,+/ - 2% EX : 1 2 . 5 + / - Inlet box needs to be accessible for cleaning. Are there constraints on cleaning this inlet? PROJECT NO. 2201051.00 PP-01 C.2.001 DA R I CI T Y O F A 70 1 G I B S O N 15 - I N C TO C I T Y O F A S PL A N THis sheet needs to be updated in the plan set & the drainage report narrative/calculations need to be updated with the new design. Include the variance in the next round of submittal There are no foreseen accessibility constraints. The curb inlet and catch basin are the typical COA structures. The inlet and basin are also setback from the road, so access will be further from vehicle traffic than a typical curb inlet layout. The plan set and drainage report has been updated and a variance request has been prepared and will be included in submittal. 07/12/2022