Loading...
HomeMy WebLinkAboutFile Documents.927 E Durant Ave.0002-2021-BRES (13)These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK COMMUNITY DEVELOPMENT DEPARTMENT BUILDING PERMIT CONTACT SHEET CITY OF ASPEN 130 S. GALENA ST | ASPEN, CO 81611 ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone City Mailing Address E-mailAddress State ZIP OWNER ___________________________________ _____________________ ________________________Name Phone E-mail FOR PLAN REVIEW QUESTIONS ___________________________________ _____________________ ________________________Name Phone E-mail FOR INSPECTION QUESTIONS ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone City Mailing Address E-mailAddress State ZIP OWNER’S AUTHORIZED AGENT ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone City Mailing Address E-mailAddress State ZIP APPLICATION BEST CONTACT ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone City Mailing Address E-mailAddress State ZIP ARCHITECT OR DESIGNER OF RECORD ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone City Mailing Address E-mailAddress State ZIP CIVIL ENGINEER OF RECORD ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone City Mailing Address E-mailAddress State ZIP STRUCTUAL ENGINEER OF RECORD /ŚĞƌĞďLJĐĞƌƚŝĨLJƚŚĂƚ/ŚĂǀĞƌĞĂĚĂŶĚĞdžĂŵŝŶĞĚƚŚŝƐĂƉƉůŝĐĂƚŝŽŶĂŶĚŬŶŽǁƚŚĞƐĂŵĞƚŽďĞƚƌƵĞĂŶĚĐŽƌƌĞĐƚ͘ůůƉƌŽǀŝƐŝŽŶƐŽĨůĂǁƐĂŶĚŽƌĚŝŶĂŶĐĞƐ ŐŽǀĞƌŶŝŶŐƚŚŝƐƚLJƉĞŽĨǁŽƌŬǁŝůůďĞĐŽŵƉůŝĞĚǁŝƚŚǁŚĞƚŚĞƌƐƉĞĐŝĨŝĞĚŚĞƌĞŝŶŽƌŶŽƚ͘dŚĞŐƌĂŶƚŝŶŐŽĨĂƉĞƌŵŝƚĚŽĞƐŶŽƚƉƌĞƐƵŵĞƚŽŐŝǀĞĂƵƚŚŽƌŝƚLJƚŽǀŝŽůĂƚĞ ŽƌĐĂŶĐĞůƚŚĞƉƌŽǀŝƐŝŽŶƐŽĨĂŶLJŽƚŚĞƌƐƚĂƚĞŽƌůŽĐĂůůĂǁƌĞŐƵůĂƚŝŶŐĐŽŶƐƚƌƵĐƚŝŽŶŽƌƚŚĞƉĞƌĨŽƌŵĂŶĐĞŽĨĐŽŶƐƚƌƵĐƚŝŽŶ͘/ƚŝƐŵLJƌĞƐƉŽŶƐŝďŝůŝƚLJƚŽƌĞǀŝĞǁƚŚĞ ĂƉƉƌŽǀĞĚƉůĂŶƐĂŶĚĂŶLJĐŽŵŵĞŶƚƐƚŚĂƚĂƌĞĐŽŶƚĂŝŶĞĚƚŚĞƌĞŽŶĂŶĚƐĞĞƚŚĂƚƚŚĞƐƚƌƵĐƚƵƌĞĂŶĚͬŽƌƉƌŽũĞĐƚŝƐďƵŝůƚŝŶĐŽŵƉůŝĂŶĐĞǁŝƚŚĂůůĂƉƉůŝĐĂďůĞĐŽĚĞƐ͘ ĚĚŝƚŝŽŶĂůůLJ͕/ƵŶĚĞƌƐƚĂŶĚƚŚĂƚ/ĂŵƌĞƐƉŽŶƐŝďůĞĨŽƌĞŶƐƵƌŝŶŐƚŚĂƚĂůůƐƵďͲƉĞƌŵŝƚƐĂƐƐŽĐŝĂƚĞĚǁŝƚŚŵLJƉƌŽũĞĐƚĂƌĞƐƵďŵŝƚƚĞĚƚŽƚŚĞŝƚLJŝŶĐŽŵƉůŝĂŶĐĞ ǁŝƚŚƚŚĞĂƉƉƌŽǀĞĚDĂƐƚĞƌƉůĂŶƐĞƚ͘ /ƵŶĚĞƌƐƚĂŶĚƚŚĂƚƚŚĞŝƚLJĚŽĞƐŶŽƚƌĞǀŝĞǁƐƵďͲƉĞƌŵŝƚƐĨŽƌĐŽŵƉůŝĂŶĐĞǁŝƚŚƚŚĞŵĂƐƚĞƌƉůĂŶƐĞƚ ________________________________________________________ _____________________ŽŶƚƌĂĐƚŽƌ^ŝŐŶĂƚƵƌĞ Date ___________________________________ _____________________ _____________________ ________________________________________ __________________ _________ ____________ _______________________________________________________________________________________ Name Phone Cell Phone City Mailing Address E-mailAddress State ZIP GENERAL CONTRACTOR ŚĞĐŬŝĨLJŽƵĂƌĞĂƚĞƐƚĞĚŽǁŶĞƌďƵŝůĚĞƌ;ƐŝŶŐůĞͲĨĂŵŝůLJŚŽŵĞƐŽŶůLJͿ͘zŽƵŵƵƐƚƚĂŬĞĂƚĞƐƚĂŶĚĐŽŵƉůĞƚĞƚŚĞŽǁŶĞƌͬďƵŝůĚŝŶŐĂĸĚĂǀŝƚ͘ ;/dzh^KE>zͿKǁŶĞƌďƵŝůĚĞƌĂƉƉƌŽǀĞĚďLJ͗ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺĂƚĞ͗ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺĸĚĂǀŝƚŽŶĮůĞ Z^^͗ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ WZD/dEhDZ͗ͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺͺ KĐƚŽďĞƌϮϬϮϬ 927 E. Durant 925 1125Dave Rybak dave@daverybak.com 618 7294Kevin Glenn kevin@sevencastlesconstruction.com Aspen Towhhouse Near Nell, LLC P O BOx 29 Jenkintown PA 19046 925 1125Dave Rybak 948 1012 600 E. Hopkins Ave., Unit 303 Aspen CO 81611 dave@daverybak.com 925-1125Rybak Architecture & Development, P.C. 948-1012 600 E. Hopkins Ave., Unit 303 Aspen CO 81611 dave@daverybak.com 618 7294Seven Castles Construction P O Box 1797 Basalt CO 81621 kevin@sevencastlesconstruction.com 12/17/20 01/04/2021 0002-2021-BRES 0002-2020-BRES ALLAN FAMILY TRUST 927 E DURANT AVE 273718235003 04/01/2021 justinh SMOKE ALARMS AND CARBON MONOXIDE DETECTORS REQUIRED THROUGHOUT DWELLING UNIT PER CITY OF ASPEN MUNICIPAL CODE 8.15 GLASS IN GUARDS AND HANDRAILS Glass in guards and handrails shall be two plies equal thickness laminated glass. Tempered glass is only permitted where not above a walking surface and when a top rail that is either self-supported (glass infill panels) or is supported by a minimum of three panes of glass. IRC 308.7/IBC 2407. READ THIS OR FAIL YOUR INSPECTION! Furred & Dropped Ceilings, Soffits, and Walls 20015 IBC 803.13 This applies to the attachment of finishes or furring to any assemblies that are required to be either fire-rated or non-combustible and is separate from the fire-rated assembly requirement. Walls, Ceilings & Soffits: If furred 1 ¾ inches or less, do one of the following: 4.Fill spaces with Class A material. 5.Fill spaces with inorganic or non-combustible material. 6.Fire block 8 feet in all directions. Walls: If set out (furred) greater than 1 ¾ inches, do one of the following: 4.Use a Class A finish material (such as drywall). 5.Use non-combustible framing. 6.Protect both sides with fire sprinklers. Ceilings & Soffits: If dropped (furred) greater than 1 ¾ inches: Framing members, hangers, and other assembly members must be non-combustible. You may not use wood. In Type III and V construction only, you may use fire retardant treated wood or non-combustible framing. Recessed luminaires installed in building thermal envelope shall be sealed and IC-rated – IECC sec R402.4.5 Any recessed light fixtures in contact with insulation must be IC rated. 04/27/2021 NO EXTERIOR LIGHTING IN SCOPE OF WORK. NO CHANGES TO MECHANICAL EQUIPMENT IN SCOPE OF WORK. ALLOWABLE FLOOR AREA NEITHER REVIEWED NOR CONFIRMED THROUGH THIS PERMIT. NO CHANGES TO FLOOR AREA. External Energy Use Approved RREMP CREMP PERMIT #:_______________DATE:________ SNOWMELT:_____________________________ POOL: _____________________________ SPA: _____________________________ OFFSET:________________________________ REMP SHEET: __________________________ REVIEWED BY: _________________________ SNOWMELT SYSTEM AND EQUIPMENT MANDATORY REQ’S. All snowmelt systems shall meet the following: -Any portions in the Right of Way must be on a separate zone. A ROW permit and Permanent Encroachment License are required. -R10 insulation shall be installed under the area to be snow melted or R5 insulation shall be installed under and at the slab edges. (Ordinance 11 Series 2011) -Automatic controls installed for system shut off when pavement temperature is above 50°F and no precipitation is falling. (2009 IECC Sec. 403.8 & 503.2.4.5) -Automatic or manual controls installed for system shut off when outdoor temperature is above 40°F. (2009 IECC Sec. 403.8 & 503.2.4.5) -Inspection by testing hydrostatically at 1½ times max system design pressure, but not less than 100psi, for 15minutes. (2009 IMC Sec. 1208.1) MINIMUM BOILER AFUE: _________________ X 0002-2021-BRES 9/20/21 36 SQ.FT. REMP EXEMPT SPA NA NA SEE ADDITIONAL INFO FOR DECK REP. JH