HomeMy WebLinkAboutFile Documents.901 E Hyman Ave.0009-2022-BRES (11)SMOKE ALARMS AND
CARBON MONOXIDE
DETECTORS REQUIRED
THROUGHOUT DWELLING
UNIT PER CITY OF ASPEN
MUNICIPAL CODE 8.15
These plans must be kept at the
building site or inspection
delays may occur. Construction
shall conform to these plans. All
changes shall be approved by
the building official.
Field Plan Set Must Be Printed In Color
SEPARATE PERMITS ARE
REQUIRED FOR ELECTRICAL,
PLUMBING, MECHANICAL, OR
FIRE SPRINKLER WORK
It should be known that this review shall
not relieve the applicant of their
responsibility to comply with the
requirements of the City of Aspen
Municipal Code. Pursuant to
Sec.26.104.050, any permit or approval
issued in error or otherwise not in
conformity with the requirements of this
Title, shall be void. Similarly, any permit
or approval issued in reliance upon or
as a result of, a materially false
statement or representation made in
the process of obtaining the permit or
development approval shall, likewise,
be void. Any person having received a
void or voidable permit or approval
shall not be relieved from having to
comply with all applicable terms and
conditions of this Title and the City shall
not be estopped from fully enforcing
same.
REVIEWED BY ZONING
03/31/2022 kylas
It should be known that this review shall
not relieve the applicant of their
responsibility to comply with the
requirements of the City of Aspen. The
review and approval by the City is
offered only to assist the applicant's
understanding of the applicable Land
Use Code requirements. The issuance
of a permit based on construction
documents and other data shall not
prevent the City of Aspen from
requiring the correction of errors in the
construction documents and other
data.
427 Rio Grande Place, Aspen, CO 81611
(970) 920.5090
www.aspen.gov
NOTICE OF EXEMPTION AND AUTHORIZATION TO APPLY FOR LAND
USE/BUILDING PERMITS DURING THE EFFECTIVE TERM OF
ORDINANCE #27, SERIES OF 2021
Property Address:
Parcel ID Number:
Property Owner:
Representative/email:
Scope o f Work (Provide narrative here and a separate pdf which is a succinct and
clear set of supporting documents, to be attached to this form as Exhibit A, such as
Letters of Completeness, Resolutions, Development Orders, Land Use Case
numbers, Building Permit number s etc. If the representation being made is that the
work does not involve dimensional changes prohibited by the moratorium provide
existing and proposed calculations, f loor Plans and and elevations to be attached:
___________________________________________________________________
___________________________________________________________________
Due to the circumstances noted below, the above re ferenced project as defined by
the Scope o f Work is exempt from the application of Ordinance #27, Series of 2021,
and is authorized to pur sue a land use review and/or building permit review during
the effective term o f Ordinance #27, Series of 2021, an ordinance which generally
places a moratorium on residential development. This authorization does not
guarantee issuance o f a building permit or approval of any land use application. The
applicant must submit complete information and pursue all authorized approvals in a
timely fashion, adhering to all deadlines for submission, terms of Vested Rights,
response times required to maintain an active building permit, and all other Land Use
Code and Building Code requirements in effect as of December 8, 2021. Any
amendments and or additional approvals not addressed or identified in the
application, may be subject to Ordinance #27, Series of 2021.
The project described above is permitted to proceed with land use review because
(check all that apply):
273718231009
901 E Hyman Unit 5 Aspen, CO 81611
Mesta, LLC
tom@shbuilt.com
Interior Remodel of 1Br condo. Including replace sliding glass door in LR (like for like).
02/04/2022
□A land use application for a Development Order or Notice of Approval was
submitted to the Community Development Department prior to final passage of
the ordinance on December 8, 2021, and was subsequently deemed to be
c omplete by the Community Development Department Director.
□The land use application is seeking a Development Order or Notice of Approval
for a project consisting of 100% Af fordable Housing as that term is defined at
§26.104.100 of the Aspen Municipal Code, or as may be deemed necessary for
the issuance of C ertificates of Affordable Housing for a 100% Affordable Housing
project, or as determined by the Community Development Director .
□The land use application involves Voluntar y AspenModern designation
processes that meet the requirements of Section 26.415.025.C and
26.415.030.
□The land use application or administrative request may be necessary to issue
exempt building permits as described below , and as determined by the
Comm unity Development Director .
The projec t described above is permitted to submit for building permit review
bec ause (check all that apply ):
□A building permit application was submitted to the Community Development
Department prior to final passage of the ordinance on December 8, 2021, and
was subsequently deemed to be c omplete by the Chief Building Official.
□It is a building permit for a project that will not increase the gross square
footage of development, Net leasable area, or Net livable area of any building
and does not m eet the definition of demolition.
□It is a building permit for a project that will not increase the Height of any
building. This includes additions to or replacement of mechanical equipment or
energy eff iciency systems pursuant to height exemptions as set f orth at
§26.575.020 of the Aspen Municipal Code, or as determined by the Community
Development Director.
□It is a building permit for commercial and lodge development as stand-alone
uses on a parcel or property .
□The project has received or is eligible to receive a Development Order or
Notice of Approval on the effective date of this ordinance.
□It is a building perm it for 100% affordable housing projects as that term is
defined at §26.104.100 of the Aspen Municipal Code.
□It is a building permit for demolition or repair of non-habitable str uctures.
Issued on ___________________, 20___, this certificate is valid through the
effective date of Ordinance #27, Series of 2021, or any Ordinance which supersedes
a provision of Ordinance #27, Series of 2021 in a manner which is relevant to the
Scope of Work. A copy of this certificate is required when applying for any land use
review or building permit. This Notice is not a Development Order or Administrative
Determination that is subject to appeal.
___________________________________
Phillip Supino
Community Development Director
Disclaimer: This exemption is given based on the information provided by the applicant. If changes are
made, o r the scope, after a more detailed review, is found to be subject to Ordinance 27, 2021, the
exemption may be revoked.
Exhibit A: Floor plans and elevations representing scope of work
X
X
Planning Director, for
22January 28
02/04/2022
January 13, 2022
Thomas J Sherlock
SH Building Group LLC
314 AABC, Ste B
Aspen, CO 81611
tom@SHBuilt.com
RE: Structural Engineering Services Agreement
Chateau Blanc #5 Remodel – 901 E Hyman, Aspen Colorado
Tom,
We understand the proposed work is primarily an interior remodel to the above residence. Once demolition can
begin, the interior wall and ceiling finishes shall be at least partially removed and existing relevant structure
exposed to allow observation of the existing structural systems, as necessary. We shall be contacted to perform
a site observation of the exposed elements to determine the structural implications of the proposed remodel
and any necessary revisions. This shall be done prior to proceeding with the removal or modification of any
framing members.
Should you have any further questions regarding this matter, please feel free to contact our office. We look
forward to assisting you in completing your project.
Sincerely,
Evolve Structural Design LLC
Steven R. Edmiston, P.E., S.E.
Principal
01/13/2022
01/20/2022
FIRE
SPRINKLERS
REQUIRED
Discuss directly with Fire Marshal to determine if this
requirement can be waived on this alteration
0009-2022-BRES
ROBERTS
901 E Hyman #5
273718231009
04/25/2022
justinh
2015 IBC 601 Fire Resistive Requirements for
Type of Construction: ____
Primary Structural Frame: ____hr
(columns, beams, girders, etc)
Exterior Bearing Walls: ____hr
Interior Bearing Walls: ____hr
Floors/Ceilings: ____hr
Roof : ____hr
Unless noted otherwise for occupancy separation or fire
separation distance.
READ THIS OR FAIL YOUR INSPECTION!
Furred & Dropped Ceilings, Soffits, and Walls
20015 IBC 803.13
This applies to the attachment of finishes or furring to any
assemblies that are required to be either fire-rated or
non-combustible and is separate from the fire-rated
assembly requirement.
Walls, Ceilings & Soffits: If furred 1 ¾ inches or
less, do one of the following:
4.Fill spaces with Class A material.
5.Fill spaces with inorganic or non-combustible material.
6.Fire block 8 feet in all directions.
Walls: If set out (furred) greater than 1 ¾ inches,
do one of the following:
4.Use a Class A finish material (such as drywall).
5.Use non-combustible framing.
6.Protect both sides with fire sprinklers.
Ceilings & Soffits: If dropped (furred) greater
than 1 ¾ inches:
Framing members, hangers, and other assembly
members must be non-combustible. You may not
use wood.
In Type III and V construction only, you may use fire
retardant treated wood or non-combustible framing.
VA
1
1
1
1
1
SPECIAL INSPECTION REQUIRED:
-Structural steel welding: Field & Shop
-High strength bolting
-Epoxy anchors
-Intumescent paint
-Spray applied fire resistive materials
-Permanent micropiles
Special inspection is required per 2015 IBC
section 1704. Inspector to verify that copy of
agreement for inspection program to be on
the job site prior to performing any
inspections. A copy of all Special Inspector
field reports to be on the job site for
inspectors' review if requested. Failure to
comply may result in denial of inspection.
2x10 or Greater Joist Floor/Ceiling 1 hour fire, STC 51 assembly from the Gypsum Manual (GA-600 Fire
Resistance Design Manual):
(No IIC given. Must use an underlayment product or carpet to achieve IIC 50)
Resilient channel,
single layer of 5/8"
type X, and
insulation for sound
to be installed for 1
hour ceiling where
joist framing is
present
SPECIAL INSPECTION AND TESTING AGREEMENT
This form is required for projects needing special inspection and/or testing per Chapter 17 of the International
Building Code (IBC).
Project Address: __________________________________ Permit Number: ______________________
BEFORE A PERMIT CAN BE ISSUED: The owner, or the design professional in responsible charge, acting as
the owner’s agent, shall complete two copies of this agreement and the attached Special-inspection and Testing
Schedule, including the required acknowledgments. A pre-construction conference with the parties involved may be
required to review the special-inspection requirements and procedures.
APPROVAL OF SPECIAL INSPECTORS: Special inspectors may have no financial interest in the projects for
which they provide special inspections. Special inspectors shall be approved by the building department prior to
performing any duties. Special inspectors shall submit their qualifications and are subject to personal interviews for
pre-qualification. Special inspectors shall display approved identification, as stipulated by the building official,
when performing the function of special inspector.
Special inspection and testing shall meet the minimum requirements of the International Building Code Section
1704. The following conditions are also applicable:
A. Special Inspector Responsibilities:
1. Signify presence at job site. Special inspectors should notify contractor personnel of their
presence and responsibilities at the job site. If required by the building official, they shall sign in
on the appropriate form posted with the building permit.
2. Observe assigned work. The special inspector shall observe assigned work for conformance with
the building department approved (stamped) design drawings, specifications, and applicable
workmanship provisions of the International Building Code. Architect\engineer-reviewed shop
drawings may be used only as an aid to inspection.
For continuous special-inspection, the special inspector shall be on site at all times observing the
work requiring special inspection. Periodic inspections, if any, must have prior approval based on
a separate written plan reviewed and approved by the building department and the engineer or
architect of record.
3. Report nonconforming items. The special inspector shall bring nonconforming items to the
immediate attention of the contractor and note all such items in the daily report. If any item is not
resolved in a timely manner or is about to be incorporated in the work, the special inspector shall
immediately notify the building department by telephone or in person, notify the engineer or
architect, and post a discrepancy notice.
4. Provide timely reports. The special inspector shall complete written inspection reports for each
inspection visit and provide the reports on a timely basis determined by the building official. The
special inspector or inspection agency shall furnish these reports directly to the building official,
engineer or architect of record, and others as designated. [IBC Sec. 1704.1.2] These reports should
be organized on a daily format and may be submitted weekly at the option of the building official.
These reports should include:
a. Description of daily inspections and tests made with applicable locations,
b. Listing of nonconforming items,
c. Report on how nonconforming items were resolved or unresolved as applicable,
d. Itemized changes authorized by the architect, engineer, and building official if
not included in nonconforming items
5. Provide Final Inspection Report. The special inspector shall submit a written final report
documenting required special inspections and correction of any discrepancies noted in the
inspections prior to the final building inspection.
901 E Hyman #5 0009-2022-BRES
B. Owner Responsibilities:
1. The project owner, an agent of the owner, or the design professional in responsible charge acting
as the owner’s agent, is responsible for employing special-inspection services. The special
inspector/agency shall not be in the employ of the contractor, subcontractor or material supplier.
[IBC Sec 1704.1] In case of an owner/contractor, the special inspector\agency shall be employed
as specified by the building official.
C. Design Professional in Responsible Charge Responsibilities:
Design Professional in Responsible Charge definition: An individual who is registered or licensed to practice their
respective design profession as defined by the statutory requirements of the professional registration laws of the state or
jurisdiction in which the project is to be constructed; who is engaged by the owner to review and coordinate certain
aspects of the project, as determined by the building official, for compatibility with the design of the building or
structure.
1. Prepare statement of special inspections. The registered design professional in responsible
charge shall prepare a statement of special inspections in accordance with IBC Section 1705 for
submittal by the applicant. The statement of special inspections shall identify the following:
a. The materials, systems, components and work required to have special inspection or
testing by the building official or by the registered design professional responsible for
each portion of the work.
b. The type and extent of each special inspection.
c. The type and extent of each test.
d. For each type of special inspection, identification as to whether it will be continuous
special inspection or periodic special inspection.
D. Contractor Responsibilities:
1. Notify the special inspector. The contractor is responsible for notifying the special inspector or
agency regarding individual inspections for items listed on the attached schedule and as noted on
the building department approved plans. Adequate notice shall be provided so the special inspector
has time to become familiar with the project.
2. Provide access to approved plans. The contractor is responsible for providing the special
inspector access to approved plans.
3. Retain special inspection records. Upon request, the contractor is also responsible for retaining,
at the job site, all special inspection records completed by the special inspector.
E. Inspection of Fabricators:
1. Fabrication of structural assemblies and members. Where fabrication of structural load-bearing
members and assemblies is being performed on the premises of a fabricator’s shop, IBC Section
1704.2 shall require special inspection of the fabricated items.
2. Fabrication and implementation procedures. The special inspector shall verify that the
fabricator maintains detailed fabrication and quality control procedures that provide a basis for
inspection control of the workmanship and the fabricator’s ability to conform to approved
construction documents and reference standards. The special inspector shall review the procedures
for completeness and adequacy relative to code requirements for fabricator’s scope of work.
F. Approved Fabricator Responsibilities:
1. Fabrication exempt inspections. Special inspections are not required where work is done on the
premise of a fabricator registered and approved to perform such work without special inspection.
If work is done on site that requires special inspection, special inspection will be required.
2. Approval of fabricator. Approval shall be based upon review of the fabricator’s written
procedural and quality control manuals and periodic auditing of fabrication practices by an
approved special inspection agency.
3. Completion of fabrication. Upon completion of fabrication, the approved fabricator shall submit
certificate of compliance to the building official stating that the work was performed in accordance
with the approved construction documents.
Justin Hahn 6/8/22
06/08/2022
justinh
2 layers of 5/8" type x
gypsum to wrap
around the bottom
face of new steel
beam, and then turn
both layers back up to
floor/ceiling deck
above beyond beam
pocket.
Beyond the point where 2 layers of 5/8"
type X meet upper layer already
installed tight to T&G decking the
required fire protection is achieved by
the existing heavy timber construction.
The drop ceiling in this location is not
rated, penetrations are not required to
be protected, but the drop must be
framed with non-combustible materials
or fire retardant treated lumber.
Existing shaft shall terminate in a 5
sided enclosure of 5/8" type X gyp,
then exhaust and line sets may
penetrate the protected shaft
termination with appropriate firestop
assemblies.