HomeMy WebLinkAboutFile Documents.1012 E Cooper Ave.0131-2020-BRES (7)ADDRESS: 1012 E. Cooper PERMIT NUMBER:
COMMUNITY DEVELOPMEN T DEPARTMENT
BUILDING PERMIT CONTACT SHEET
li•l;ilftitliiff lil•lll•il[•llF
Nam e Claude Salter, Aspen Development Services
ll•llll~1PIMl®li•INiill•li4
Nam e Simon Bentley, Crawford Design Build
rJJ~~fs 400 Bay Laurel Ct NE Citv. Saint Petersburg State FL ZIP33703
E-dmda11 abelman@gmail.com , enee56@gmail.com
A ress'======--------------------------------------------
OWNER'S AUTHORIZED AGENT
Name Phone Cell Phone
Mailing
Addres s Citv. State ZIP
E-mail
Addre ss
i'!@P•l,Sli•lli:i•iP•Jllt#i
Name Simon Bentley, Crawford Design Bu ild Cell Phone
rJJ~~fs 1101 Village Road, Unit LL2B c· Carbondale 1tv. State co ZIP 81623
E-mail cdbsimon@comcast.net
Address
1·!111111&1•];1•11111111•]1;11•];1•
Name George Winnie, GRW Architecture, LLC Ce ll Phone
Mailing
Address Citv. Carbondale State co ZIP 81623
E-mail grwarch@gmail.com Addre ss
CIVIL ENGINEER OF RECORD
Name ____________________ Phone~-----------Cell Phone. ___________ _
Mailing Address. _______________________ Cltv. __________ Stat e. _____ ZIP ______ _
E-mail erniekollar@gmial.com Address •ilP•tlllt·)•iltiillliil•JIPl•l;I•
Name Ernest 'Ernie' Kollar, Kollar Engineering Inc.
rJJ~;fs 320 Main Street, Suite 203
E-mail erniekollar@gmial.com
Address
@ltli24ii•lill;hil•J;
Name Crawford Design Build
rJJ 1:~fs 1101 V illage Road , Unit LL2B
E-mail 1101 Village Road, Unit LL2B Address
Phone JI J_J@j_jjjj
citv. Carbondale
citv. Carbondale
INSPECTIONS: The General Contractor must schedule inspections online.
Please visit www.aspenpitkin.com/Departments/Community-Development-Forms/ to do so.
State CO ZIP 81623
I hereby certify that I have read and exa n d thi s application and know the same to be t r ue and co rrect. All provi si ons of laws and
ordinances governing this type of w w · be complied with whether specified herein or not. The granting of a permit does not
presume to give authority to viola or. ancel the provisions of any other state or local law regu lating construction or the performance
of construction. It is my respon · 1 to review the approved plans and any comments that are conta ined thereon and see that the
str ucture and/or p roject is bu il · complia with all applicable codes.
Contractor Si gnature , Date lD /io / 'ZO
D Check if you are a test down uilder (single-family homes onl y). You must take a test and complete the owner/building affidav it .
(CITY USE ONLY) Owne · er approved by:. __________ Date: _________ Affidavit on fi le
[ CITY OF ASPENAugust2017 130 S. GALENA ST I ASPEN, CO 81611)
ADDRESS: 1012 E. Cooper PERMIT NUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT
ZONING COMPLIANCE VERIFICATION POLICY
Applicability: All development projects must comply with the City's zoning regulations, including height and
location, and are subject to periodic inspection during construction and a final inspection prior to project
completion. When required by the City's Zoning Officer, certain development projects within the City of Aspen
shall verify height and/or location compliance through submission of a survey repor t.
Unless otherwise exempted, all commercial, multi-family, lodging, and mixed-use projects proposed within one
foot of the maximum permissible height or within one foot of allowable setbacks shall verify zoning compliance
through this method.
In addition, the Zoning Officer may requ ire this method be used to verify zoning compliance for single-family/
duplex development or other projects where compliance may be in question. Independent of this policy, all
projects must comply with all applicable zoning limitations.
The Zoning Officer will inform the applicant during building permit review if verification will be requir ed .
However, circumstances may require zoning compliance verification of a project which is already underway.
Timing: Height verification should be accompl i shed at a po int of construction when enough roof structure is in
place to accurately measure the structure yet early enough in the process to still make changes if the structure
is too tall. Location verification should be accomplished at a point of construction when the final exterior of the
structure can be accurately measured in relation to setback requirements. Applicants are encouraged to confer
with the Zoning Officer regarding the timing of zoning compliance verification. Applicants are encouraged to
perform their own verification during construction to ensure the building is progressing to plan , including the
height and location of foundation forms prior to concrete pours.
Survey Report: A Colorado Professional Land Surveyor shall describe and depict the height and location of a
structure compared to the dimensions shown on the zoning sheets of the approved building permit plan set. The
City's Zoning Officer can as sist in determining which elements of the structure should be measured and if natural
or finished grade should be used .
The report shall include the following information:
1-A brief cover letter with the building permit number, name of the proj ect, name of the owner and general
contractor, with a written description of the measurement methods including date(s) of measurement.
2-For location verification : A plan drawing showing property boundaries, permitted setbacks, bu i ld ing envelope
(if applicable), location of foundation walls, location of the outermost exterior of e ac h st ructure (inclusive of all
exterior veneer or other exterior treatments), and the location and dimension of each observed mea surement.
3-For height verification: El evation drawing(s) showing the natural or finished grad e of the property, ma ximum
permitted height, building elevations including the nominal roof form (inclu sive of the first layer of exterior
sheathing or weatherproofing membrane but excluding all exterior surface treatm ents such as shakes, shingles,
or other veneer treatments orornamentation), and the location and dimensi on of each obs erved measurement.
Additional roof plan s showing location o f meas urements may be nece ssary.
( CITY OF ASPEN August2017 130 S. GALENA ST I ASPEN, CO 81611)
PERMIT NUMBER: ADDRESS: 1012 E. Cooper
COMMUNITY DEVELOPMENT DEPARTMENT
ZONING COMPLIANCE VERIFICATION POLICY
4-Plans and elevations must include height or setback exemption items unique to the building, such as stair/
elevator overruns, utility/mechanical apparatus, hot tubs and spas, and other height or setback exemption items
unique to the project.
5-The report shall include a written description or drawing notes of the benchmarks or control points used to
establish property boundaries, setbacks, building location, building height,and grades for each measurement.
6-AII drawings must correlate with the building locations, elevations, and grading/drainage representations i n
the approved building permit set.
7-The report must include the signature, date, and stamp of Colorado Professional Land Surveyor who
conducted the field measurements certifying that the field measurements areaccurately represented .
Review and Acceptance of Report: The Zoning Officer shall review the report(s} and either confirm the project
conforms to the dimensions shown on the zoning sheets of the approved building permit plan set and meets
the zoning limitations for the property or shall determine which elements of the project are not in compliance.
The Zoning Officer may request additional information to verify zoning compliance, which may include but is not
limited to additional survey work or a site visit.
All drawings of the survey report must correlate with representations in the approved building permit set for
acceptance . Modifications to field conditions or amendments to the building permit may be required.
A determination of non-compliance shall result in the issuance of a correction notice and possible work
stoppage. Applicants are encouraged to verify zoning compliance as early as reasonably practical in the
construction process to minimize disruption to the construction schedule.
Acknowledgment:
Brad Crawford
I (contractor name} _____________ understand this policy. I agree that this project will
comply with the zoning limitations affecting this parcel and the representations made on the zoning sheets of
the approved building permit plans. lo/understand that a Certificate of Occupancy will not be issued until this
project complies with all applicable zoni limitations. /
Contractor Signature: f J ... ~
Date: 10.20.20
vv-\_.../
( CITY OF ASPENAugust2017 130 S. GALENA ST I ASPEN, CO 81611)