Loading...
HomeMy WebLinkAboutSub Permit.1225 Alta Vista Dr.0116-2022-BRES (5) 5/7/25,2:49 PM 0099-2022-UTWC-Salesforce-Enterprise Edition • Close Window salesforce • Print This Page • Expand All I Collapse All 0099-2022-UTWC Number 0099-2022-UTWC Record Type Utility Water Connection Address 1225 ALTA VISTA DR Owner Robert Gregor Original Number 22-2741 Status Closed-Final Type Utility Water Connection Reason for Cancel or Comp!. Review Fail Applicant BRYAN MAY Aspen Internal? No Account BRYAN MAY ARCHITECTURE Imported Project HPC-ZON-EH-UTIL Review Permit Contractor Eng Review Is This Associated w/a Building Yes Parks-Prkng-San Review Permit? Master Building Permit 0116-2022-BRES Conditional Inspections Is this an Addendum Permit? Conditional Final lnsp Supplemental/Addendum Master Permit Action Items Hold All Reviews Price Book 2022 Hold Reason Permit Dates New Application Date 8/19/2022 Expiration Date Application Complete Date 8/24/2022 Override Expiration Date Application Accepted Date 8/24/2022 Last Activity Date Issue Date 2/7/2023 Milestone Current Days in 0 Applicant Hand Days to Issue 167 Milestone Current Days in City 63 Hands Close/CO Issuance Date 9/22/2023 Job Location Address 1225 ALTA VISTA DR,ASPEN:273512261001 Lot Site Address Display on Map Block Historic Property? No Legal Description Subdivision:RESIDENCES AT ALTA VISTA Unit:A Historic District? No Eden Address Zone District R-15 Property Information Common Building Name Already on City Water? Yes Public Building? Class of Service Customer Duplex In a Park? Utility Account Number Other Use Water Service Area Inside City Boundaries? Project Information Use of Building Multi-Family Size of Existing Domestic Water 1.50 Line Use Class Residential Size of Proposed Domestic Water 1.50 Line Class of Work Alteration Size of Existing Fire Suppression 1.00 Line If Residential App,Estimated New Size of Proposed Fire Suppression 0.00 ECUs Line Number of Meters Proposed 0 Description Interior remodel of a unit within a duplex. CO Description Raw Water Information Identify ALL Sources of Water City Is There Well or Wells on the Property? Does Project Involve Outdoor No Acre-feet of Water Currently by 0 Irrigation? Well https://cityofaspen.my.salesforce.com/a038X000028hgjYQAQ/p 1/4 5/7/25,2:49 PM 0099-2022-UTWC—Salesforce-Enterprise Edition Irrigated Area Sq Ft 0 Acre-feet of Water Rights to be 0 Conveyed Indicate Amt,Source,and Use of Is There a Pool,Spa or Water No Water Feature? Do Water Feat use Recirc/Recycled No Water? Water Service Requests New Tap? No Abandon Existing Tap No Existing Tap Modifications? No Abandon Existing Well No Internal Use Only Existing ECU Count Utility Investment Charge(Tap Fees) Final ECU Count Utility Investment Charge Paid Date of Existing Tap Utility Hookup Charge Date of New Tap Utility Hookup Charge Paid CO Status if Applicable Cash in Lieu Date of CO Cash in Lieu Paid CO Approved Date Well Development Charges Date of Final Connection Fee Well Development Charges Paid Payment Water Service Agreement Summary of Prior Water Fees Paid Required? Status of Final Agreement Financials Total Fees Total Payments Fees Paid Total Balance $0.00 System Information Created By BRYAN MAY,8/19/2022 3:22 PM Last Modified By Aspen Avocette,9/28/2024 1:53 AM Number 0099-2022-UTWC VIP Form Tool VIP VIP Permit Application Foreign Form Language Template VIP 8/19/2022 VIP [{"parentCategoryld":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvPUAS"}, Submitted 3:27 pM Template {"parentCategoryld":null,"isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvNUAs"}, Status {"parentCategoryld":"a2E6A000000UwvhUAC","isSubmit":null,"isCurrent":null,"categoryStatusLabels":null,"categoryStatus":"Completed","categoryld":"a2E6A000000Uwvc {"parentCategoryld":nul I,"isSu bmit":n u II,"isCu rrent":n u II,"categoryStatusLabels":n u II,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvaUAC"}, {"parentCategoryld":nul I,"isSu bmit":n u II,"isCurrent":n u II,"categoryStatusLabels":n u II,"categoryStatus":"Completed","categoryld":"a2E6A000000UwvZUAS"}, {"parentCategoryld":nul I,"isSubmit".true,"isCu Trent":nu II,"categoryStatusLabels":nu II,"categoryStatus":"Completed","categoryld":"a2E6A000000Ux1 dUAC"}] Action Items View/Print Permit Link Attachment Activity History Email:Utility Connection Permit Final Type Billable Assigned To Steve Wilson Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 9/21/2023 Days in Applicant's Hands Comments To:bmay@bryanmayarchitecture.com CC:kathy.rogo@aspen.gov;frank@blueskyaspen.com BCC: Attachment:1225 Alta Vista Dr.Final Packet.pdf Subject:Utility Connection Permit Final Body: Hello BRYAN MAY, Attached is your final Utility Connection Permit for the completed project at 1225 ALTA VISTA DR associated with permit#:0099-2022-UTWC. After review,please print,have signed by owner,and notarized.Once signed and notarized,please return UCP with payment,if applicable,to the Finance Department window located on the second floor of City Hall at 427 Rio Grande Place. Alternatively,you may upload the signed and notarized copy of the UCP as a SCANNED(not photographed).pdf file and pay all fees due via Salesforce,but if submitting via Salesforce,please send a chatter to @Robert Gregor and @Cole Langford on the permit record once the document is uploaded and all fees are paid to serve as a"push"notification that these permit requirements are complete. Please reach out with any questions or concerns. Thank you, https://cityofaspen.my.salesforce.com/a038X000028hgjYQAQ/p 2/4 5/7/25,2:49 PM 0099-2022-UTWC—Salesforce-Enterprise Edition Steve Email:Utility Connection Permit Review Type Billable Assigned To Steve Wilson Number of Hours Total Cost $0.00 Fee Generated Date Start Date Completed Date 10/26/2022 Days in Applicant's Hands To:bmay@bryanmayarchitecture.com CC:kathy.rogo@aspen.gov BCC: Attachment:1225 Alta Vista Dr.Review Packet.pdf Subject:Utility Connection Permit Review Body: Hello BRYAN MAY, Attached is your review Utility Connection Permit for the proposed project at1225 ALTA VISTA DR associated with permit#:0099-2022-UTWC Comments After review,please print,have signed by owner,and notarized.Once signed and notarized,please return UCP with payment,if applicable,to the Finance Department window located on the second floor of City Hall at 427 Rio Grande PI. Alternatively,you may upload the signed and notarized copy of the UCP as a SCANNED(not photographed).pdf file and pay all fees due via Salesforce,but if submitting via Salesforce,please send a chatter to @Robert Gregor and @Cole Langford on the permit record once the document is uploaded and all fees are paid to serve as a"push"notification that these permit requirements are complete. Please reach out with any questions or concerns. Thanks Bryan, Steve Planning Review Type Utilities Billable Assigned To Steve Wilson Number of Hours 2.00 Total Cost $650.00 Fee Generated Date Start Date Completed Date 10/26/2022 Days in Applicant's Hands Comments Contacts BRYAN MAY Account BRYAN MAY ARCHITECTURE Type Applicant Active Contractor License Count 0.00 Number 0050029 BRYAN MAY Account BRYAN MAY ARCHITECTURE Type Architect or Engineer of Record Active Contractor License Count 0.00 Number 0050030 Account Type Owner Active Contractor License Count 0.00 Number 0050031 Files UCP(Final)-FE,No Fees Due-1225 Alta Vista Dr 1225 Alta Vista Dr.Final Packet Last Modified 9/22/2023 10:17 AM Last Modified 9/21/2023 4:08 PM Created By Robert Gregor Created By Steve Wilson UCP(Rev)-FE,No Fees-1225 Alta Vista 1225 Alta Vista Dr.Review Packet Last Modified 2/7/2023 12:37 PM Last Modified 10/26/2022 1:11 PM Created By Robert Gregor Created By Steve Wilson Permit Application 2022-08-19 21:27:47.pdf Last Modified 8/19/2022 3:27 PM Created By BRYAN MAY Milestones Review Round 1-0099-2022-UTWC Status Approved Due Date Created Date 8/24/2022 https://cityofaspen.my.salesforce.com/a038X000028hgjYQAQ/p 3/4 5/7/25,2:49 PM 0099-2022-UTWC-Salesforce-Enterprise Edition Reviews REV-026049 Milestone Review Round 1-0099-2022-UTWC Status Approved Type Engineering Water Due Date Completed Date 10/26/2022 1:13 PM Owner Alias SWilson On Hold Created Date 8/24/2022 Submissions 10.Permit Application Packet.20210827.pdf Actions Submission Date 8/19/2022 3:26 PM Latest Submission Date Status Required Description 10.Permit Application Packet.Owner Signatures.20220819.pdf Actions Submission Date 8/19/2022 3:26 PM Latest Submission Date Status Required Description 50.CMP.20220819.pdf Actions Submission Date 8/19/2022 3:26 PM Latest Submission Date Status Required Description 50.Residential ECU Calculator.20211028.xlsx Actions Submission Date 8/19/2022 3:26 PM Latest Submission Date Status Required Description 90.Architectural Drawings.20220819.pdf Actions Submission Date 8/19/2022 3:26 PM Latest Submission Date Status Required Description Final UCP.Notarized.20230922.pdf Actions Submission Date 9/22/2023 8:44 AM Latest Submission Date Status Required Description Copyright©2000-2025 salesforce.com,inc.All rights reserved. https://cityofaspen.my.salesforce.com/a038X000028hgjYQAQ/p 4/4