HomeMy WebLinkAboutFile Documents.428 E Hyman Ave.0056-2023-BCOM DE-VIEVE.
ADDRESS: 428 E HYMAN AVENUE. ASPEN CO. 81611 LI 10/30/2023
ZONING
COMMUNITY DEVELOPMENT DEPARTMENT > ;
i®iapf
EPIC PERMIT PRE—APPLICATION FORM
i: ASPEN
A
Based on the scope of work of each indiviudal project,a Permit Coordinator will indicate the departments below
that you must schedule a pre-submittal meeting with.Your application will not be accepted for review until you
have received approval from each indicated agency to submit your permit.Submit this completed form as a
component of your permit application.
EPIC PERMIT QUALIFICATION CRITERIA
1. Must be a commercial use.
2. Must be located in the the following zone districts: CC, C-1, NC, CL or at the disrection of the Community
Development Director.
3. Must be an alteration that only affects the interior or minor exterior improvements to the space.
4. Work commenced without a building permit will disqualify the project from the program.
5. Change Orders to an EPIC permit will disqualify the project from the program.
PROPERTY INFORMATION
ADDRESS 428 EAST HYMAN AVENUE,ASPEN,COLORADO,81611
DESCRIPTION OF REMOVAL OF TWO WALLS{130 SO.FT)REMOVAL OF FIXTURES AND SHELVING,REMOVAL OF DRINKING
WORK IN DETAIL FOUNTAIN.EXISTING CEILING.LIGHTING.SPRINKLER.FIRE ALARM AND HVAC TO REMAIN:REFINISHING FLOOR.
NEW PANELING,FIXTURES AND FURNITURE.NO EXTERIOR WORK WILL BE REQUIRED,ONLY SIGNAGE
•
PRE-SUBMITTAL AGENCY APPROVALS
REVIEW REVIEW REVIEWER DATE COMMENTS
REQ'D AGENCY APPROVAL
BUILDING kft see attached pre submittal comment list
Justin Hahn 10.16.23 for revisions to make prior to submitting
p CMP GC must get their certifications current in our
Justin Hahn ''? 10.16.23 system and at minimum provide a medium
project checklist for their CMP
❑ ZONING Magda Dziwosz 10.16.23
❑ WATER
❑ HPC
❑ OTHER
RFCFI\
( CITY OF ASPEN November 2022 427 R I O G RA N D E PL I ASPEN, COA 1,12 6 3
ASPEN
BUILDING DEPARTMENT
90/11049)
magdad
ADDRESS: 428 E.HYMAN AVENUE,ASPEN,CO PERMIT NUMBER: 10/30/2023 ../
• ZONING `
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT CONTACT SHEET
FOR PLAN REVIEW QUESTIONS
Name Phone E-mail
FOR INSPECTION QUESTIONS
Name Phone E-mail
OWNER
Name /LVC2 St.Allot C-04.4bt L LC Phone 24 V- 23 3- v lito Cell Phone (�
Address?o /37-3 / City / 'i^ State ZIP • v / 2,
E-mail
Address
OWNER'S AUTHORIZED AGENT
Name .J A A CA-1240A.M— Phone T.aV 1•Zf'.— CV'd Cell Phone
Address /9° /a) /3 33 City 4t A/ State G- ZIP F//Z) Z'
E-mail john@carbonacapital.com
Address
APPLICATION BEST CONTACT
Name DORIS MCLEAN Phone 1(914)747-2344 Cell Phone 1(917)225-8135
Mddres flings 465 COLUMBUS AVENUE City VALHALLA State NY ZIP 10595
A
E-mail DMCLEAN@ATMOSPHERE-DG.COM
Address
ARCHITECT OR DESIGNER OF RECORD
Name LOUIS LORIA Phone 1(914)747-2344 Cell Phone 1(914)483-9166
ham 465 COLUMBUS AVENUE City VALHALLA State NY ZIP 10595 E-mall LLORIA@ATMOSPHERE-DG.COM
Address
( ENGINEER OF RECORD
Name JOSE H W. PEACE Phone 1(614)839-4639 XT 3213 Cell Phone 1(614)949-3044
Address 3720 BROOKSEDGE BLVD City WESTERVILLE State OHIO zip 43081
Address JPEACE@MENGINEERING.US.COM
Address
STRUCTUAL ENGINEER OF RECORD
Name Phone Cell Phone
M iling
Address City State ZIP
E-mail
Address
GENERAL CONTRACTOR
Name Sachse Construction Phone 313-481-8200 Cell Phone 313-400-7979
Addre 5 3663 Woodward Ave, Suite 500 at,/Detroit State MI ZIP 48201
E-mail abarnes@sachse.net
Address
I hereby certify that I have read and examined this application and know the same to be true and correct. All provisions of laws and ordinances
governing this type of work will be complied with whether specified herein or not. The granting of a permit does not presume to give authority to violate
or cancel the provisions of any other state or local law regulating construction or the performance of construction. It is my responsibility to review the
approved plans and an comments that are contained thereon and see that the structure and/or project is built in compliance with all applicable codes.
Additionally,I and: • d that I am responsible for ensuring that all sub-permits associated with my project are submitted to the City in compliance
with the appro ••ter plan set.I understand that the City does not review sub-permits for compliance with the master plan set
Contr. or . Date l0�23
Sig ure 1 i
PA Check.�tv are a tested owner builder(single-family homes only).You must take a test and complete the owner/building affidavit.
(CI USE ONLY)Owner builder approved by: Date: - Affidavit LRi Ie( E ID
ITY OF ASPEN November2022 427 RIO GRANDE PL I ASPEN, CO, §)$a. 23
ASPEN
BUILDING DEPARTMENT
oe-0rmagdad
ADDRESS: 428 E HYMAN AVENUE, ASPEN CO. 81611 PERMIT NUMBER: 10/30/2023
ZONING
COMMUNITY DEVELOPMENT DEPARTMENT
HOMEOWNER ASSOCIATION COMPLIANCE FORM :.E�,
All applications for a building permit within the City of Aspen are required to include a certification of compliance
with applicable covenants and homeowner association policies. The certification must be signed by the property
owner or attorney representing the property owner. The following certification shall accompany the application
for a permit.
ADDRESS ( r % UNIT# ' , PARCEL ID# Z7I_: 0� 33 t'3
I,the property owner, certify as follows: (pick one)
;3: This property is not subject to a homeowners association or other form of private covenant.
❑ This property is subject to a homeowners association or private covenant and the improvements
proposed in this building permit do not require approval by the homeowners association or covenant
beneficiary.
❑ This property is subject to a homeowners association or private covenant and the improvements
proposed in this building permit have been approved by the homeowners association or covenant beneficiary.
I understand the City/ cf Aspen does not interpret, enforce, or manage the applicability, meaning, or effect
of private covens 4s or homeowner association rules or bylaws. I understand that this document is a public
document.
Owner Signature/
Date 1-` - .
Owner Printed/Na e <A �
1
OR
Owner's Attorney Signature _ Date
Owner's Attorney Printed Name
RECEIVED
( CITY OF ASPEN November2022 427 RIO GRANDE PL I ASPEN, CCA). 61./123
ASPEN
BUILDING DEPARTMENT
ADDRESS: 428 E HYMAN AVENUE, ASPEN CO. 81611 PERMIT NUMBER: 1ILLRR11t�11 10/30/2023
COMMUNITY DEVELOPMENT DEPARTMENT
VALUATION AFFIDAVIT : f_sac
AFFIDAVIT POLICY
All applications for a building permit within the City of Aspen are required to include a certification of
compliance with building permit valuation requirements. The certification must be signed by the property
owner or authorized representative. The following certification shall accompany the application for a permit.
I, the property owner or authorized agent, understand and certify as follows:
City of Aspen Ordinance No. 40, Series of 2016 adopts the 2015 International Residential Code (IRC) and
International Building Code (IBC)with certain amendments.These codes define building valuation as follows:
R108.3 Building permit valuations. Building permit valuation shall include total value of the work for which a
permit is being issued, such as electrical, gas, mechanical, plumbing equipment, and other permanent systems,
including materials and labor.
109.3 Building permit valuations.The applicant for a permit shall provide an estimated permit value at time
of application. Permit valuations shall include total value of work, including materials and labor,for which the
permit is being issued, such as electrical, gas, mechanical, plumbing equipment and permanent systems. If, in
the opinion of the building official,the valuation is underestimated on the application, the permit shall be
denied, unless the applicant can show detailed estimates to meet the approval of the building official. Final
building permit valuation shall be set by the building official.
City policy indicates that permit valuation includes materials and labor for the structure and mechanical,
electrical, plumbing and gas,fire sprinkler and elevator systems and equipment. Permanent systems such as
audio visual, lighting and HVAC controls are included in the total as are expenses directly related to construction
such as equipment rental and contractor fees. Finish materials such as paint, floor coverings, tile, cabinets and
counter tops are included in the permit valuation total.
Costs such as architectural and engineering design fees, landscaping and planting, tap fees, development
mitigation fees,trash removal, and cleaning are not included.
I certify that the percintt luation entered on the permit application for this property complies with the above
valuation requireme is un s d t ytt this document is a p
u
blic document.
Owner Signature:
Date:
Owner Printed Na • ,4/hV 4 G o.v v
or,
Authorized Agent Signature: _ Date:
Authorized Agent Printed Name:
CITY OF ASPEN November2022 427 RIO GRANDE PL I ASPEN, CO g161,� I J
T f
ASPEN
BUILDING DEPARTMENT
� �Q
ADDRESS: 428 E HYMAN AVENUE, ASPEN CO. 81611 PERMIT NUMBER:revs
�
COMMUNITY DEVELOPMENT DEPARTMENT
ASBESTOS VERIFICATION AND CHECKLIST
ASBESTOS INFORMATION
Asbestos is a known human carcinogen and is an airborne hazard.Once airborne,asbestos fibers can stay suspended in the air for days,
weeks,or even months before settling out of the air.The fibers can easily become airborne again from a minor disturbance like turning
on an air conditioner.Uncontrolled asbestos abatement projects or renovation projects that disturb asbestos may cause latent asbestos
hazards that could expose people to asbestos in the future,long after the renovation activity occurred.The airborne asbestos fiber
concentrations resulting from disturbances may result in a significant exposure to the current and future occupants of the home.
The 1989"ban"on asbestos-containing materials is commonly misunderstood.In fact,in 1991 the U.S. Fifth Circuit Court of appeals
vacated much of the so-called"Asbestos Ban and Phaseout Rule"and remanded it to the EPA.Thus,much of the original 1989 EPA ban
on the U.S.manufacturing,importation,processing,or distribution in commerce of many asbestos-containing product categories was
set aside and DID NOT TAKE EFFECT.Therefore,ALL demolition,remodel or renovation projects must determine if disturbed material
above the trigger levels contains asbestos.
ASBESTOS CHECKLIST
•
❑Yes❑No
Residential: Will you be removing more than 32 sq ft,50 linear feet (e.g., pipe insulation), or the volume
equivalent of a 55-gallon drum of any material besides concrete, wood, bricks, or steel—examples are drywall,
linoleum, ceiling tiles, roofing materials, etc.?
❑Yes IZINo
Commercial: Will you be removing more than 160 sq ft, 260 linear feet(e.g., pipe insulation), or the volume
equivalent of a 55-gallon drum of any material besides concrete, wood, bricks, or steel—examples are drywall,
linoleum, carpet, carpet adhesives, ceiling tiles, roofing materials, etc.?
If the answer is YES to any of the above,you will need an asbestos test before you can receive a building and/
or demolition permit. You will also need to provide plans indicating areas to be demolished and determine if a
CO state demolition license is required. A state certified asbestos inspector must do this test and the test report
must be submitted with the building permit application. If the building has asbestos, a state certified asbestos
abatement firm must remove it. After removal,the abatement firm must provide a letter to the Building
Department stating that all the asbestos has been removed and that the air is clean.This letter must be received
BEFORE a permit will be issued. (See the local or statewide Yellow Pages, DexOnLine, or http://www.cdphe.state.
co.us/ap/asbestos/index.html for certified asbestos inspectors and abatement companies. ALWAYS ask for proof
of current state certification.)
If you are demolishing the building, you must submit a demolition permit app with the CDPHE in addition to the
Aspen permit app.This form may be found at https://www.colorado.gov/pacific/cdphe/asbestos-forms NOTE:
A copy of this demolition permit app must be submitted with the initial building permit application. When the
CDPHE approves the app,their issued permit must be given to the Aspen Building Dept before we issue our
permit. /
I — — —
I hereby ce' ' t t e ab ve information is true and complete.
Owner 'hone# 2/7 �� S �.
Applicant rint name) Phone#
Applicant Signature _ Date
Please contact the Building Department at buildingsupport@aspen.gov at any time if you have questions about
asbestos, interpreting your test results, or other matters. ";; ;r Ids , E�_
( CITY OF ASPEN November2022 427 RIO GRANDE PL I ASPEN, CO k6 3
ASPEN
BUILDING DEPARTMENT
magdad 1
ASPEN CO. 81611 10/30/2023 J
ADDRESS: 428 E HYMAN AVENUE, PERMIT NUMBER. ZONING 1 •
COMMUNITY DEVELOPMENT DEPARTMENT
ar
ZONING COMPLIANCE VERIFICATION POLICY :::, �� i;C;;=ASPEN;
Applicability:All development projects must comply with the City's zoning regulations, including height and
location,and are subject to periodic inspection during construction and a final inspection prior to project
completion. When required by the City's Zoning Officer, certain development projects within the City of Aspen
shall verify height and/or location compliance through submission of a survey report.
Unless otherwise exempted,all commercial, multi-family, lodging, and mixed-use projects proposed within one
foot of the maximum permissible height or within one foot of allowable setbacks shall verify zoning compliance
through this method.
In addition,the Zoning Officer may require this method be used to verify zoning compliance for single-family/
duplex development or other projects where compliance may be in question. Independent of this policy, all
projects must comply with all applicable zoning limitations.
The Zoning Officer will inform the applicant during building permit review if verification will be required.
However, circumstances may require zoning compliance verification of a project which is already underway.
Timing: Height verification should be accomplished at a point of construction when enough roof structure is in
place to accurately measure the structure yet early enough in the process to still make changes if the structure
is too tall. Location verification should be accomplished at a point of construction when the final exterior of the
structure can be accurately measured in relation to setback requirements.Applicants are encouraged to confer
with the Zoning Officer regarding the timing of zoning compliance verification.Applicants are encouraged to
perform their own verification during construction to ensure the building is progressing to plan, including the
height and location of foundation forms prior to concrete pours.
Survey Report:A Colorado Professional Land Surveyor shall describe and depict the height and location of a
structure compared to the dimensions shown on the zoning sheets of the approved building permit plan set.The
City's Zoning Officer can assist in determining which elements of the structure should be measured and if natural
or finished grade should be used.
The report shall include the following information:
1-A brief cover letter with the building permit number, name of the project, name of the owner and general
contractor,with a written description of the measurement methods including date(s) of measurement.
2-For location verification: A plan drawing showing property boundaries, permitted setbacks, building envelope
(if applicable), location of foundation walls, location of the outermost exterior of each structure (inclusive of all
exterior veneer or other exterior treatments),and the location and dimension of each observed measurement.
3-For height verification: Elevation drawing(s) showing the natural or finished grade of the property, maximum
permitted height, building elevations including the nominal roof form (inclusive of the first layer of exterior
sheathing or weatherproofing membrane but excluding all exterior surface treatments such as shakes,shingles,
or other veneer treatments orornamentation), and the location and dimension of each observed measurement.
Additional roof plans showing location of measurements may be necessary. w m
CITY OF ASPEN November2022 427 RIO GRANDE PL I ASPEN, Ccu3i11. 3
ASPEN
BUILDING DEPARTMENT
riegEf))
10magdad
PERMIT NUMBER: ADDRL., /30/2023 �J AVENUE,ASPEN CO.81611
ONING
COMMUNITY DEVELOPMENT DEPARTMENT
ZONING COMPLIANCE VERIFICATION POLICY
ASPEN
•
4-Plans and elevations must include height or setback exemption items unique to the building, such as stair/
elevator overruns, utility/mechanical apparatus, hot tubs and spas, and other height or setback exemption items
unique to the project.
5-The report shall include a written description or drawing notes of the benchmarks or control points used to
establish property boundaries, setbacks, building location, building height,and grades for each measurement.
6-All drawings must correlate with the building locations,elevations,and grading/drainage representations in
the approved building permit set.
7-The report must include the signature, date, and stamp of Colorado Professional Land Surveyor who
conducted the field measurements certifying that the field measurements areaccurately represented.
Review and Acceptance of Report:The Zoning Officer shall review the report(s)and either confirm the project
conforms to the dimensions shown on the zoning sheets of the approved building permit plan set and meets
the zoning limitations for the property or shall determine which elements of the project are not in compliance.
The Zoning Officer may request additional information to verify zoning compliance,which may include but is not
limited to additional survey work or a site visit.
All drawings of the survey report must correlate with representations in the approved building permit set for
acceptance. Modifications to field conditions or amendments to the building permit may be required.
A determination of non-compliance shall result in the issuance of a correction notice and possible work
stoppage.Applicants are encouraged to verify zoning compliance as early as reasonably practical in the
construction process to minimize disruption to the construction schedule.
Acknowledgment:
I (contractor name) Sachse Construction understand this policy. I agree that this project will
comply with the zoning limitations affecting this parcel and the representations made on the zoning sheets of
the approved building permi plans. I understand that a Certificate of Occupancy will not be issued until this
project complies with all a /icable zoning limitations.
Contractor Sign re:
Date: 10/23/2023
RECEIVE()
CITY OF ASPEN November2022 427 RIO GRANDE PL I ASPEN, COA).g1J21,23
ASPEN
BUILDING DEPARTMENT