Loading...
HomeMy WebLinkAboutFile Documents.1225 Alta Vista Dr.0116-2022-BRES (2) ADDRESS: 1225 Alta Vista, Unit A PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT 4 y�I Q , VALUATION AFFIDAVIT CITY OF ASPEN AFFIDAVIT POLICY All applications for a building permit within the City of Aspen are required to include a certification of compliance with building permit valuation requirements. The certification must be signed by the property owner or authorized representative. The following certification shall accompany the application for a permit. I, the property owner or authorized agent, understand and certify as follows: fi City of Aspen Ordinance No. 40, Series of 2016 adopts the 2015 International Residential Code (IRC) and International Building Code (IBC) with certain amendments. These codes define building valuation as follows: R108.3 Building permit valuations. Building permit valuation shall include total value of the work for which a permit is being issued, such as electrical, gas, mechanical, plumbing equipment, and other permanent systems, including materials and labor. 109.3 Building permit valuations. The applicant for a permit shall provide an estimated permit value at time of application. Permit valuations shall include total value of work, including materials and labor, for which the permit is being issued, such as electrical, gas, mechanical, plumbing equipment and permanent systems. If, in the opinion of the building official, the valuation is underestimated on the application,the permit shall be denied, unless the applicant can show detailed estimates to meet the approval of the building official. Final building permit valuation shall be set by the building official. City policy indicates that permit valuation includes materials and labor for the structure and mechanical, electrical, plumbing and gas, fire sprinkler and elevator systems and equipment. Permanent systems such as audio visual, lighting and HVAC controls are included in the total as are expenses directly related to construction such as equipment rental and contractor fees. Finish materials such as paint, floor coverings, tile, cabinets and counter tops are included in the permit valuation total. Costs such as architectural and engineering design fees, landscaping and planting, tap fees, development mitigation fees, trash removal, and cleaning are not included. I certify that the permit valuation entered on the permit application for this property complies with the above valuation requirements. I understand that t ' document is a public document. Owner Signature: Date: 7/Z5/ZZ - Owner Printed Name: —SASr w 1eA"` or, Authorized Agent Signature: Date: Authorized Agent Printed Name: RECEIVED 08/31/2022 CITY OF ASPEN January2019 130 S. GALENA ST ASPEN, CO aa. 1,1 '_JILUI[O utrHrC I MAT ADDRESS: 1225 Alta vista,Unit A PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT ASBESTOS VERIFICATION AND H KLIS CITY OFASPEN ASBESTOS INFORMATION Asbestos is a known human carcinogen and is an airborne hazard. Once airborne,asbestos fibers can stay suspended in the air for days, weeks,or even months before settling out of the air.The fibers can easily become airborne again from a minor disturbance like turning on an air conditioner. Uncontrolled asbestos abatement projects or renovation projects that disturb asbestos may cause latent asbestos hazards that could expose people to asbestos in the future,long after the renovation activity occurred.The airborne asbestos fiber concentrations resulting from disturbances may result in a significant exposure to the current and future occupants of the home. The 1989"ban"on asbestos-containing materials is commonly misunderstood. In fact,in 1991 the U.S. Fifth Circuit Court of appeals vacated much of the so-called "Asbestos Ban and Phaseout Rule"and remanded it to the EPA.Thus, much of the original 1989 EPA ban on the U.S. manufacturing, importation, processing,or distribution in commerce of many asbestos-containing product categories was set aside and DID NOT TAKE EFFECT.Therefore,ALL demolition, remodel or renovation projects must determine if disturbed material above the trigger levels contains asbestos. ASBESTOS CHECKLIST Dyes 0 No Residential: Will you be removing more than 32 sq ft, 50 linear feet (e.g., pipe insulation), or the volume equivalent of a 55-gallon drum of any material besides concrete, wood, bricks, or steel —examples are drywall, linoleum, ceiling tiles, roofing materials, etc.? ❑Yes❑No Commercial: Will you be removing more than 160 sq ft, 260 linear feet (e.g., pipe insulation), or the volume equivalent of a 55-gallon drum of any material besides concrete, wood, bricks, or steel —examples are drywall, linoleum, carpet, carpet adhesives, ceiling tiles, roofing materials, etc.? If the answer is YES to any of the above, you will need an asbestos test before you can receive a building and/ or demolition permit.You will also need to provide plans indicating areas to be demolished and determine if a CO state demolition license is required.A state certified asbestos inspector must do this test and the test report must be submitted with the building permit application. If the building has asbestos, a state certified asbestos abatement firm must remove it. After removal, the abatement firm must provide a letter to the Building Department stating that all the asbestos has been removed and that the air is clean. This letter must be received BEFORE a permit will be issued. (See the local or statewide Yellow Pages, DexOnLine, or http://www.cdphe.state. co.us/ap/asbestos/index.html for certified asbestos inspectors and abatement companies. ALWAYS ask for proof of current state certification.) If you are demolishing the building, you must submit a demolition permit app with the CDPHE in addition to the Aspen permit app. This form may be found at https://www.colorado.gov/pacific/cdphe/asbestos-forms NOTE: A copy of this demolition permit app must be submitted with the initial building permit application. When the CDPHE approves the app, their issued permit must be given to the Aspen Building Dept before we issue our permit. I hereby certify tha the above information is true and complete. Owner Phone # / 7 — 533 3300 Applicant (grin name vGdrf e iU`, P '_I °` Phone # / — C33 72 dc1 Applicant Signature Date 7/Z5/Lz--- r Please call the Cityof A en nvironmental Health Department at 920-5039 at anytime if you have questions p about asbestos, interpreting your test results, or other matters. 08/31/2022 CITY OF ASPEN August2017 130 S. GALENA ST ASPEN, CO 8,4411 '3UILDING DEPAK I MAT ADDRESS: PERMIT NUMBER: COMMUNITY DEVELOPMENT DEPARTMENT HOMEOWNER ASSOCIATION COMPLIANCE FORM CITY FA OFA SPEN All applications for a building permit within the City of Aspen are required to include a certification of compliance with applicable covenants and homeowner association policies. The certification must be signed by the property owner or attorney representing the property owner. The following certification shall accompany the application for a permit. ADDRESS 1225 Alta Vista UNIT tSA PARCEL ID#t 273512261001 I, the property owner, certify as follows: (pick one) ❑ This property is not subject to a homeowners association or other form of private covenant. ® This property is subject to a homeowners association or private covenant and the improvements proposed in this building permit do not require approval by the homeowners association or covenant beneficiary. ❑ This property is subject to a homeowners association or private covenant and the improvements proposed in this building permit have been approved by the homeowners association or covenant beneficiary. I understand the City of Aspen does not interpret, enforce, or manage the applicability, meaning, or effect of private covenants or homeowner association rules or bylaws. I understand that this document is a public document. Owner Signature Date 2 f L1'/Ly Owner Printed Name Searre L3; led" OR Owner's Attorney Signature Date Owner's Attorney Printed Name RECEIV 08/31/20 2 CITY OF ASPEN January 2ois 130 S. GALENA ST ASPEN, CO alkali '0l)ILDING DEfArRTMC'NT