Project: 22037.00— Pan Abode
Permit#: 0078-2021-BRES
Subject: Permit Comment Response
Date: 10 Sept 2021
Please find original comment and responses below. Referenced files attached separately.
NUMBER COMMENT RESPONSE
HPC
A4.1 Please indicate location for FDC and strobe Per AMC Ordinance 40, the cabin is not
on historic house. Place as "discretely" as required to be sprinkled as it contains
possible and use white casing for strobe. less than 5,000 SF fire area.A FDC with
strobe connection is not required.
A4.5 Please study other locations for meters Proposed location acceptable to HPC.
and disconnect, including free standing Please see study and response files for
location, hanging on a fence, etc. record.
Z0.4 Please provide detailed plans for Please find a detailed description of the
temporary relocation/on-site storage of relocation and stabilization plans
the historic resource during excavation, attached. Note regarding chimney
along with plans for temporary or reconstruction added to Sheets
permanent stabilization for the structure. A2.1,A2.1d,A2.2,A2.2d,A4.1,A4.4 and
A4.5.
PARKS
L100 Submit tree removal permit. In process
L301a Use original fence post holes for fence or We will need to get approval for the 30"
get approval from City Forester in writing. fence that returns to the pan abode
since there is no ex.fence there
currently.
L301b Permission from City Forester will be We will get permission before digging.
required for location of fence posts in
dripline of tree.
L400 You can plant these but they will not be We have not proposed used multi stem
allowed to be used to offset mitigation. aspens in mitigation offset values.
Single stems are allowed to be used for ,,I, 1\
offsetting mitigation. i 4c/ `
Page 1of5 09/13/2021
ASPEN
BUILDING DEPARTMENT
rowland+broughton
architecture/urban design/interior design
Survey-a Floating sidewalk required in driplines of We have detailed as such. See sheet
trees. C.1.001 for added note.
Survey-b Letter from neighbor may be required for Approval from neighbor to the West
excavation within tree driplines. has been received. Letter from the
Neighbor to the East will be submitted
when received.
C.1.001a Floating sidewalk required in dripline of Detail will show 2"of aggregate and
spruce- 2" maximum excavation only. then floating sidewalk detail on top of
that. See sheets C.1.001 & C.1.002 for
added notes.
C.1.001b Air spading will be required on both sides Will coordinate with GC. See sheets
of trench for water/storm drain lines. C.1.001 & C.1.002 for added notes.
C.1.001c Move water service line to west side of See sheet C.1.001 for relocated water
property as discussed with City Forester. services.
C.1.001d Remove storm drain from dripline of See sheet C.1.001 for revised storm pipe
spruce. layout.
C.1.001e Use same 4'wide trench for storm drain as See sheet C.1.001 for revised storm pipe
water line and route drain outside of layout. Verified with COA Engineering
dripline of spruce -Verify with Water Dept that separation is required for water
required separation of storm drain and mains and non-potable lines. The water
water line. service will be 7'-10'deep and the storm
pipe reaches 5'deep max; will be in the
same trench.
WELS MARKUP#1
1 Signature of a qualified landscape design See sheet IR-1 for signature.
professional is required.
2 Please include the species of the sod See sheet L400 for sod species.
3 Per Sheet L-401, the proposed turf is rated See sheet IR-1 for water budget
for medium water (.65 plant factor). Please calculations.
revise the water budget accordingly
4 Trees should be on separate valves from See sheet IR-1 for revised calculations
shrubs, perennials and ground covers as and sheet IR-2 for revised plans.
per WELS Section 5.2.7. Revise plans and
calculations.
5 Please indicate the total irrigated area in See sheet IR-1 for revised right of way
the City ROW here. irrigated sqft.
6 Trees should be on separate valves from See sheet IR-1 for revised calculations
turf as per WELS Section 5.2.7. Revise all and sheet IR-2 for revised plans.
plans and budget calculations accordingly.
7 As per WELS Section 5.1.3, a lockable See sheet IR-2 for plan change, and IR-3
master valve is required. Revise plan to detail for lockaable master valve
ErEIVED
include this component. assembly.
Page 2of5 09/13/2021
ASPEN
BUILDING DEPARTMENT
rowland+broughton
architecture/urban design/interior design
ZONING
A2.2 Provide a 3rd floor/roof plan for the new Please find sheet A2.3 attached. Please
house also find sheets A5.1 and A5.2 for
reference.
A4.1 Not sure what this is for.We measure to Sheet A4.1-A4.5 Revised to omit Roof
the midpoint on a 3:12 roof. Level line. Dimensions revised to show
height to height calculation point.
A4.4a Maximum height line should mirror most Sheet A4.4 revised to show maximum
restrictive,which at this point is finished height line 25'-0"above proposed
grade. grade.
A4.4b The bottom of the pit can be no more than Sheet A4.4 revised to show max. 2'-6"
2'-6". Please provide a note on the plans dimension. Note revised to reflect intent
stating that the mechanical pit will be no as follows:RECESSED MECHANICAL
deeper than 30". YARD; MAX 30"BELOW GRADE.
RE:LANDSCAPE/CIVIL DWGS.AIR
CONDENSING UNITS MUST BE LESS
THAN 30"ABOVE GRADE;MAX 30"
BELOW GRADE. Please also see detail
3/A1.1 note that mechanical well not to
exceed 30"below grade.
A4.4f Please verify that the fence is not more Please see sheet L802 for fence detail.
than 6'tall from the most restrictive grade Fence is max 6'-0"tall and will follow
grade.
Z0.2a Check math for house area totals. Please see revised chart total on Sheet
Z0.2
Z0.2b Check math for combined area totals. Please see revised chart total on Sheet
Z0.2
Z0.2c This staircase was already counted on the Please see revised detail 3/Z0.2 and
floor below. On this level this would be revised FAC table total on Sheet Z0.2
simply a hole in the floor and therefore
does not count as FA.
Z0.2d I do not believe that this matches the Code Chart on sheet Z0.2d updated to more
or approvals. Per the code for duplex on clearly show bonus granted by HPC.
6,000 sq ft lot=3,600 FA+ 135 (per Council
ordinance)for a total Allowable FA of
3,735
20.2e House area does not match the amount Please see revised chart on Sheet Z0.2
shown in the pictures. Please reconcile. showing correct area.
RECEIVED
Page3of5 09/13/2021
ASPEN
BUILDING DEPARTMENT
rowland+broughton
architecture/urban design/interior design
Z0.2f FA includes all areas within the Please see revised details and chart on
surrounding walls- including fireplaces. Sheet Z0.2 including area to face of stud
Please include the projection for the support at fireplace on levels one and
fireplace on both the ground and upper two.
floors.
L804a In order for a structure to be counted as Please see sheet S2.01 for decking
"patio" and not deck, it must be no more details.
than 6" from finish grade at both
perimeter as well as underneath. Please
modify this or add it to the deck totals.
S100 Show window wells,fireplace foundation Please see revised sheet S100 attached.
BUILDING
B-1 The special inspection and testing Please find the signed special inspection
agreement document provided is not and testing agreement attached.
signed. Please provide a signed copy to the
jurisdiction.
B-2 Refer to the landscaping plans:The deck Refer to Structural plans sheet S1.01
framing shown on sheet L804 is not and section 4/S2.01 for all information
adequate to support the 100psf ground on framing for deck.
snow load. Please provide engineered
structural plans.The provided foundation
and structural plans do not include the
deck.
B-3 Refer to sheet A1.1: Please add the line Please see revised sheet A1.1 note
used to determine fire separation distance indicating line of minimum 10'-0"fire
to the proposed site plan. Looks like there separation distance between cabin and
will not be any issues,just need for the house structures.
record set of plans.
B-4 Refer to sheets A8.2 and A8.3; Please Please see revised sheets A8.2 and A8.3
identify the windows and doors that will indicating safety glazing locations in
require safety glazing. Although sheet A0.3 each window type elevation.
outlines the requirements, actual labels
will help avoid confusion in the field.
STRUCTURAL
S-1 Please verify that a shoring plan will not be Shoring plan is required. Please find
needed for the new home excavation. proposed shoring plan attached. Please
also see A2.0,A7.2,A7.12 and S100
showing the revised Cabin foundation
wall configuration to accommodate
shoring and minimize tree root
disturbance.
RECEIVED
Page4of5 09/13/2021
ASPEN
BUILDING DEPARTMENT
rowland+broughton
architecture/urban design/interior design
S-2 Provide the engineered truss details for Please see attached for the revised
review or specify this will be a deferred 50.01 stating that the pre-engineered
submittal. wood trusses are a deferred submittal
MECHANICAL
M-1 No comments. Acknowledged
PLUMBING
P-1 Aspen does not require plumbing plans for Acknowledged
single family dwellings.
ENERGY
No
Comments
ELECTRICAL
E-1 Aspen does not require electrical plans for Acknowledged
single family dwellings. Verified the
required electric vehicle charging was
included.
ENGINEERING
9/8/21 Email After speaking with the water distribution The bury depth for the water service is
Shoring Plan team,they want to see 7' of vertical 7-10'and our storm pipe gets to
Comments separation between the storm pipe and roughly 5'deep;only way to get 7'
the water service line to ensure proper separation is to bury the water service
bury depth from open air conduit. Spot to the max 10'and shallow the storm
elevation call outs or a profile view of pipes and provide heat tape throughout
those pipe sections would help. the entire system. The simpler solution
of insulation seems to be the best
solution.
9/8/21 Email I do have one drainage concern about the The gravel surrounding the drywell has
Shoring Plan vicinity of the micropiles to the drywell on been expanded to 2'in width and will
Comments the north side and if there is enough begin 10'away from the foundation;
clearance for that side of the drywell to percolation area updated in the
have proper percolation area, but that is drainage study. Only a small portion
more of a storm system question. north of the drywell will be less than 2'
due to the cap.
9/1/21 Mtg Concern with storm drainage tied to Sheet C.1.002, notes#10 and 11 clearly
C.1.001 foundation system and surface daylight state 'do not tie storm pipe to
pump discharge. foundation drain'.
RECEIVED
Page5of5 09/13/2021