Loading...
HomeMy WebLinkAboutFile Documents.211 W Hopkins Ave.0078-2021-BRES (10) aspen 500 w main st,aspen co 81611 + t 970 544 9006 denver 1830 blake st,denver co 80202 + t 303 308 1373 visit www.rowlandbroughton.com rowland+broughton architecture/urban design/interior design MEMORANDUM Project: 22037.00 — Pan Abode Permit#: 0078-2021-BRES Subject: Permit Comment Response R3 Date: 18 Nov 2021 Please find original comment and responses below. Referenced files attached separately. NUMBER COMMENT RESPONSE WELS 1 Kentucky Bluegrass (CST) is rated for Very Please see revised L400 and IR-1, High-Water use (0.90 plant factor). Revise Enviroturf has been specified instead of the water budget accordingly. bluegrass. Enviroturf is specified on COA excel spreadsheet as Medium water use. 2 Bluegrass is rated for Very High-Water use. Please see revised L400 and L401, Revise all plans and calculations accordingly. Enviroturf has been specified instead of bluegrass. BUILDING 1 The address for the new home will be 213 Understood, Thank You West Hopkins. We will clone the application and will not require any additional submittal documents. 2 In our review of the assumed property line Please see the revised Utility Plan C.1.001 between the Pan Abode and the new home I and Mechanical Coversheet MO.1 noting met with the Fire Marshal to review the fire the preliminary service size calculations separation and access to the buildings and and service line increase from 1"to 1 1/2". property and Aspen Fire will require the Pan Detailed calculations and sprinkler shop Abode to be fire sprinklered. drawings will be provided as a deferred submittal by the Fire Sprinkler contractor. Please also see Sheets A4.1 and A4.2 noting the proposed Fire Alarm Control Panel and Strobe locations at the historic cabin and House. Final locations to be coordinated with Aspen Fire on-site per 11/16 email correspondence with Jan Legersky. RECEIVED Page 1 of3 11/19/2021 ASPEN BUILDING DEPARTMENT rowland+broughton architecture/urban design/interior design 3 The location of the gas meter is not shown on Please see revised A4.3 showing proposed the elevation A4.3 but does not appear to gas meter location and noting mechanical meet the Black Hills installation location exhaust and non-operable window requirements for openings into the building. I locations. Sheet A4.3 also notes for GC to have attached the clearances. Please revise. coordinate final location with energy supplier as non-operable windows are typically exempt from minimum distance requirements. 4 The letter for the relocation of the Pan Abode Yes, there has been substantial fireplace is vague. Has a more detailed plan conversation with HPC Amy Simon to developed? provide more detail on the cabin and chimney mover plan. The GC and house mover have warned that the chimney will likely not survive if moved intact and that it will likely need to be disassembled and then reassembled to match the historic dimensions. We have updated the elevation notes at the chimney to reflect Amy's request to further coordinate with HPC during the house move. ENGINEERING 1 The constructability of the water service lines, Please see Sheet C.1.001 for revised and the storm pipe system are a concern due routing. to the close proximity of the tree and property line. 2 The Architecture plans show a sliding gate in Comment clarified in 11/04/2021 email front of the transformer. Gates are not response. Gate acceptable if door allowed to be placed in front of transformers hardware is incapable of locking. Please to prevent any access issues per COA see note on SheetA1.00 to reflect this Electric Dept Standards. condition. 3 Public Improvements for this project will need Comment clarified in 10/24/2021 email to include the installation of a detached response. No detached sidewalk required. sidewalk with a 5' vegetated buffer at the Sidewalk to be repaired to match existing. curb. 4 Show how overflow discharge will be routed Please see Sheet C.1.002 for overflow to ROW? Provide additional elevation points discharge routing and additional elevation to show flow path. points. 5 Fire flow calculations need to be provided. Please see sheet MO.1 for preliminary fire flow calculations. Detailed calculations to be provided by fire sprinkler contractor in deferred submittal per note under Fire Protection title on sheet 1-COVER.1 RECEIVED Page2of3 11/19/2021 ASPEN BUILDING DEPARTMENT rowland+broughton architecture/urban design/interior design 6 How will disturbance to the neighboring Please see shoring plan for shoring property be mitigated along this utility trench location at property line. during construction? 7 Provide 3' separation from vault consistent Please see added dimension on sheet with Architectural Plans sheet A1.1 C.1.001. 8 Provided a Load Calc form signed by the Comment clarified in 11/03/2021 email Electric Dept verifying the transformer and response. The Load Calc form will be generator have capacity. provided when the Electrical Sub- contractor is signed to the project as a deferred submittal. Electrical plans will also be included with this submission per City of Aspen requirements. 9 Provide a note specifying electric and gas Please see sheet C.1.001 note #11 lines have 3' required separation. Revision from 30"to 36". 10 Each individual water service tap needs to Please see revised tap locations and note have 18" of horizontal separation along #6 on sheet C.1.001 mainline from adjacent connections. 11 Provide Excavation & Stabilization plans to Please see excavation &stabilization plan show how disturbance to the adjacent submitted 20210910 property will be mitigated. 12 Show COA Storm Inlet as shown on sheet Please see sheet C.1.002 for COA Storm C.1.002 and associated storm line. Inlet. 13 Water service lines need to have 7" of Please see sheet C.1.001 for revised horizontal separation from inlet box and 2" routing. vertical separation from storm mainline. 14 Where and how is this sump and pump Revised, please see sheet C.1.002 notes routed to the drywell? Specify separation #10-12. Please see Detail 2/P3.0 for sump between foundation sump and stormwater detail. The foundation and stormwater sump. Provide detail for stormwater sump sumps will have separate sump pits. and pumps. 15 Please provide a Curb & Gutter detail that Comment clarified in 10/27/2021 email meets COA Engineering Standards. response. Curb and gutter to be patched to match existing conditions. See sheet C.6.002 for COA curb &gutter detail. 16 Survey needs to show all existing utilities. Please see revised Survey Plan attached. RECEIVED Page3of3 11/19/2021 ASPEN BUILDING DEPARTMENT