SUBSOIL STUDY
FOR FOUNDATION DESIGN
PROPOSED RENOVATION AND BASEMENT ADDITION
211 WEST HOPKINS AVENUE
ASPEN, COLORADO
PROJECT NO. 21-7-156
MARCH 4, 2021
PREPARED FOR:
MATTHEW JOBLON
3003 EAST 3"AVENUE, SUITE 201
DENVER, COLORADO 80206
(matW,bmcinv.com)
RECEIVED
05/21/2021
ASPEN
BUILDING DEPARTMENT
TABLE OF CONTENTS
PURPOSE AND SCOPE OF STUDY - 1 -
PROPOSED CONSTRUCTION - 1 -
SITE CONDITIONS - 1 -
FIELD EXPLORATION - 2 -
SUBSURFACE CONDITIONS - 2 -
FOUNDATION BEARING CONDITIONS - 2 -
DESIGN RECOMMENDATIONS - 3 -
FOUNDATIONS - 3 -
FOUNDATION AND RETAINING WALLS - 3 -
FLOOR SLABS - 4 -
UNDERDRAIN SYSTEM - 5 -
PERCOLATION TEST - 5 -
SURFACE DRAINAGE - 6 -
LIMITATIONS - 6 -
FIGURE 1 - LOCATION OF EXPLORATORY BORING
FIGURE 2 - LOG OF EXPLORATORY BORING
FIGURE 3 - GRADATION TEST RESULTS
TABLE 1- SUMMARY OF LABORATORY TEST RESULTS
TABLE 2 -PERCOLATION TEST RESULTS
RECEIVED
05/21/2021
Kumar&Associates,Inc.° Project No.21-7-156 ASPEN
BUILDING DEPARTMENT
PURPOSE AND SCOPE OF STUDY
This report presents the results of a subsoil study for the proposed renovation and basement
addition to the existing residence located at 211 West Hopkins Avenue, Aspen, Colorado. The
project site is shown on Figure 1. The purpose of the study was to develop recommendations for
the foundation design. The study was conducted in accordance with our agreement for
geotechnical engineering services to Matthew Joblon dated January 26, 2021.
An exploratory boring was drilled to obtain information on the subsurface conditions. Samples
of the subsoils obtained during the field exploration were tested in the laboratory to determine
their classification and other engineering characteristics. The results of the field exploration and
laboratory testing were analyzed to develop recommendations for foundation types, depths and
allowable pressures for the proposed building foundation. This report summarizes the data
obtained during this study and presents our conclusions, design recommendations and other
geotechnical engineering considerations based on the proposed construction and the subsurface
conditions encountered.
PROPOSED CONSTRUCTION
The proposed construction includes a single story residence over a full depth basement detached
from the existing historic residence. A full depth basement addition will also be constructed
below the historic residence. An attached two car garage will be constructed as part of the
detached addition. Ground floors will be slab-on-grade. Grading for the structure is assumed to
include cut depth up to about 12 feet. We assume relatively light foundation loading, typical of
the proposed type of construction.
If building loadings, location or grading plans change significantly from those described above,
we should be notified to re-evaluate the recommendations contained in this report.
SITE CONDITIONS
The subject site is developed with a single-story historic residence. The ground surface is
relatively flat with some cut and fill from the previous development. Vegetation consists of
landscaped lawn grass and trees. There was approximately 16 to 18 inches of snow cover
present at the time of our exploration.
RECEIVED
05/21/2021
Kumar&Associates,Inc.® Project No.21-7-156 ASPEN
BUILDING DEPARTMENT
-2 -
FIELD EXPLORATION
The field exploration for the project was conducted on February 9, 2021. One exploratory
boring was drilled at the location shown on Figure 1 to evaluate the subsurface conditions. The
boring was advanced with 4-inch diameter continuous flight augers powered by a truck-mounted
CME-45B drill rig. The boring was logged by a representative of Kumar&Associates, Inc.
Samples of the subsoils were taken with 13/8 inch and 2-inch I.D. spoon samplers. The samplers
were driven into the subsoils at various depths with blows from a 140 pound hammer falling 30
inches. This test is similar to the standard penetration test described by ASTM Method D-1586.
The penetration resistance values are an indication of the relative density or consistency of the
subsoils. Depths at which the samples were taken and the penetration resistance values are
shown on the Log of Exploratory Boring, Figure 2. The samples were returned to our laboratory
for review by the project engineer and testing.
SUBSURFACE CONDITIONS
A graphic log of the subsurface conditions encountered at the site is shown on Figure 2. The
subsoils consist of about 12 feet of medium dense, gravelly sand fill overlying dense, slightly
silty to silty sand and gravel with cobbles and possible boulders down to the maximum drilled
depth of 21 feet.
Laboratory testing performed on samples obtained from the boring included natural moisture
content and gradation analyses. Results of gradation analyses performed on small diameter drive
samples (minus 11/2-inch fraction) of the coarse granular subsoils are shown on Figure 3. The
laboratory testing is summarized in Table 1.
No free water was encountered in the boring at the time of drilling and the subsoils were slightly
moist to moist.
FOUNDATION BEARING CONDITIONS
The natural granular soils encountered in the boring are adequate for support of spread footing
foundations. Man-placed fill and debris from previous site development should be completely
removed from beneath proposed foundation areas. At the planned basement level excavation
depth, we expect existing fill and debris from prior site development and clay soils (if present)
will be removed but we should observe the foundation excavation for bearing conditions.
RECEIVED
05/21/2021
Kumar&Associates,Inc.® Project No.21-7-156 ASPEN
BUILDING DEPARTMENT
- 3 -
DESIGN RECOMMENDATIONS
FOUNDATIONS
Considering the subsurface conditions encountered in the exploratory boring and the nature of
the proposed construction, we recommend new building foundations be supported with spread
footings bearing on the natural granular soils.
The design and construction criteria presented below should be observed for a spread footing
foundation system.
1) Footings placed on the undisturbed natural granular soils should be designed for
an allowable bearing pressure of 3,000 psf. Based on experience, we expect
settlement of footings designed and constructed as discussed in this section will
be minor, about '/2 inch or less.
2) The footings should have a minimum width of 16 inches for continuous walls and
2 feet for isolated pads.
3) Exterior footings and footings beneath unheated areas should be provided with
adequate soil cover above their bearing elevation for frost protection. Placement
of foundations at least 42 inches below exterior grade is typically used in this
area.
4) Continuous foundation walls should be reinforced top and bottom to span local
anomalies such as by assuming an unsupported length of at least 10 feet.
Foundation walls acting as retaining structures should also be designed to resist
lateral earth pressures as discussed in the "Foundation and Retaining Walls"
section of this report.
5) Existing fill, debris from previous site development and loose or disturbed soils
should be removed and the footing bearing level extended down to the relatively
dense natural granular soils. Disturbed granular soils in footing area should then
be moistened and compacted.
6) A representative of the geotechnical engineer should observe all footing
excavations prior to concrete placement to evaluate bearing conditions.
FOUNDATION AND RETAINING WALLS
Foundation walls and retaining structures which are laterally supported and can be expected to
undergo only a slight amount of deflection should be designed for a lateral earth pressure
computed on the basis of an equivalent fluid unit weight of at least 50 pcf for backfill con t r. Y of the on-site granular soils. Cantilevered retaining structures which are separate from thRE ,.#
05/21/2021
Kumar&Associates,Inc.° Project No.21-7-156
ASPEN
BUILDING DEPARTMENT
-4 -
building (if any) and can be expected to deflect sufficiently to mobilize the full active earth
pressure condition should be designed for a lateral earth pressure computed on the basis of an
equivalent fluid unit weight of at least 40 pcf for backfill consisting of the on-site granular soils.
Backfill should not contain organics, debris and rock larger than about 6 inches.
All foundation and retaining structures should be designed for appropriate hydrostatic and
surcharge pressures such as adjacent footings, traffic, construction materials and equipment. The
pressures recommended above assume drained conditions behind the walls and a horizontal
backfill surface. The buildup of water behind a wall or an upward sloping backfill surface will
increase the lateral pressure imposed on a foundation wall or retaining structure. An underdrain
should be provided to prevent hydrostatic pressure buildup behind walls.
Backfill should be placed in uniform lifts and compacted to at least 90% of the maximum
standard Proctor density at a moisture content near optimum in landscape areas. Backfill placed
in pavement and walkway areas should be compacted to at least 95% of the maximum standard
Proctor density. Care should be taken not to overcompact the backfill or use large equipment
near the wall, since this could cause excessive lateral pressure on the wall. Some settlement of
deep foundation wall backfill should be expected, even if the material is placed correctly, and
could result in distress to facilities constructed on the backfill. Backfill should be a relatively
well graded granular material and could be compacted to at least 98% standard Proctor density to
help limit settlement potential.
The lateral resistance of foundation or retaining wall footings will be a combination of the
sliding resistance of the footing on the foundation materials and passive earth pressure against
the side of the footing. Resistance to sliding at the bottoms of the footings can be calculated
based on a coefficient of friction of 0.50. Passive pressure of compacted backfill against the
sides of the footings can be calculated using an equivalent fluid unit weight of 400 pcf. The
coefficient of friction and passive pressure values recommended above assume ultimate soil
strength. Suitable factors of safety should be included in the design to limit the strain which will
occur at the ultimate strength, particularly in the case of passive resistance. Fill placed against
the sides of the footings to resist lateral loads should be a granular material compacted to at least
95% of the maximum standard Proctor density at a moisture content near optimum.
FLOOR SLABS
The natural on-site granular soils, exclusive of topsoil and debris from previous construction, are
suitable to support lightly loaded slab-on-grade construction. To reduce the effects of soRE 1 E IVE D
05/21/2021
Kumar&Associates,Inc.° Project No.21-7-156 ASPEN
BUILDING DEPARTMENT
- 5 -
differential movement, floor slabs should be separated from all bearing walls and columns with
expansion joints which allow unrestrained vertical movement. Floor slab control joints should
be used to reduce damage due to shrinkage cracking. The requirements for joint spacing and
slab reinforcement should be established by the designer based on experience and the intended
slab use. A minimum 4-inch layer of free-draining gravel should be placed beneath basement
level slabs to facilitate drainage. This material should consist of minus 2-inch aggregate with at
least 50%retained on the No. 4 sieve and less than 2%passing the No. 200 sieve.
All fill materials for support of floor slabs should be compacted to at least 95% of maximum
standard Proctor density at a moisture content near optimum. Required fill can consist of the on-
site granular soils devoid of vegetation, topsoil and oversized rock.
UNDERDRAIN SYSTEM
Although free water was not encountered during our exploration, it has been our experience in
the area that local perched groundwater can develop during times of heavy precipitation or
seasonal runoff. Frozen ground during spring runoff can create a perched condition. We
recommend below-grade construction, such as retaining walls, crawlspace and basement areas,
be protected from wetting and hydrostatic pressure buildup by an underdrain system. The drains
should consist of drainpipe placed in the bottom of the wall backfill surrounded above the invert
level with free-draining granular material. The drain should be placed at each level of
excavation and at least 1 foot below lowest adjacent finish grade and sloped at a minimum 1%to
a suitable gravity outlet or drywell. Free-draining granular material used in the underdrain
system should contain less than 2%passing the No. 200 sieve, less than 50%passing the No. 4
sieve and have a maximum size of 2 inches. The drain gravel backfill should be at least 11/2 feet
deep.
PERCOLATION TEST
Drywells and bio-swales are often used in the Aspen area for site runoff detention and disposal.
The natural granular soils encountered are typically free draining and should be suitable for
surface water treatment and disposal as needed. The results of percolation testing performed in
Boring 1, presented in Table 2, indicate an infiltration rate of about 6 minutes per inch(inverted
units equivalent rate of 10 inches per hour). The bedrock and groundwater level are generally
known to be relatively deep in this area and should not affect drywell or bio-swale designs. If a
drywell is used, it should have solid casing down to at least basement level and perforation pipe
below that level.
RECEIVED
05/21/2021
Kumar&Associates,Inc.° Project No.21-7-156 ASPEN
BUILDING DEPARTMENT
- 6 -
SURFACE DRAINAGE
The following drainage precautions should be observed during construction and maintained at all
times after the basement level has been completed:
1) Inundation of the foundation excavations and underslab areas should be avoided
during construction.
2) Exterior backfill should be adjusted to near optimum moisture and compacted to
at least 95% of the maximum standard Proctor density in pavement and slab areas
and to at least 90% of the maximum standard Proctor density in landscape areas.
3) The ground surface surrounding the exterior of the building should be sloped to
drain away from the foundation in all directions. We recommend a minimum
slope of 6 inches in the first 10 feet in unpaved areas and a minimum slope of
2'/2 inches in the first 10 feet in paved areas. Free-draining wall backfill should be
covered with filter fabric and capped with about 2 feet of the on-site finer graded
soils to reduce surface water infiltration.
4) Roof downspouts and drains should discharge well beyond the limits of all
backfill.
5) Landscaping which requires regular heavy irrigation should be located at least
5 feet from foundation walls.
LIMITATIONS
This study has been conducted in accordance with generally accepted geotechnical engineering
principles and practices in this area at this time. We make no warranty either express or implied.
The conclusions and recommendations submitted in this report are based upon the data obtained
from the exploratory boring drilled at the location indicated on Figure 1, the proposed type of
construction and our experience in the area. Our services do not include determining the
presence, prevention or possibility of mold or other biological contaminants (MOBC) developing
in the future. If the client is concerned about MOBC, then a professional in this special field of
practice should be consulted. Our findings include interpolation and extrapolation of the
subsurface conditions identified at the exploratory boring and variations in the subsurface
conditions may not become evident until excavation is performed. If conditions encountered
during construction appear different from those described in this report, we should be notified so
that re-evaluation of the recommendations may be made.
This report has been prepared for the exclusive use by our client for design purposes. We are not
responsible for technical interpretations by others of our information. As the project evoR E IVE ID
05/21/2021
Kumar&Associates,Inc.° Project No.21-7-156 ASPEN
BUILDING DEPARTMENT
- 7 -
should provide continued consultation and field services during construction to review and
monitor the implementation of our recommendations, and to verify that the recommendations
have been appropriately interpreted. Significant design changes may require additional analysis
or modifications to the recommendations presented herein. We recommend on-site observation
of excavations and foundation bearing strata and testing of structural fill by a representative of
the geotechnical engineer.
Respectfully Submitted,
Kumar & Associates, Inc.
Pgt#445"-
James H. Parsons, E.I.
Reviewed by: _•����.����,1,,
O-*pQ•REGjs ."
70
:n 15222 '
Steven L. Pawla P.E. f •
e•e •� -
SLP/kac SS%pNA•EN�=
Cc: Rowland &Broug Rowland (johngrowlandbroughton.com)
RECEIVED
05/21/2021
Kumar&Associates,Inc.® Project No.21-7-156 ASPEN
BUILDING DEPARTMENT
\7893
WEST Itopk„, \
CURB
12714'
YPC 3
LSy 24312
BENCHMARK=7893.0.1 W
10718'' 0717'
977
LOT E LOT F I 12"/8'"4~r 2./8' 30 /18_ —
8"/9 __7593 �
8p1- ------/
879' G9./8 YPC
BORING 1 LOT G LS/24312
•
/ i 3'..�L--.� \ N 79'8.57 W
y+e, , \24'/17' 458.57
FF 893.7 \
LOT H
I
o
2'//13'W/i i
/
/ SINGLE FAMILY / /
/ I RESIDENCE //
Q 5.0'
• f l/I / SETBACK
1713' /10
Otise / I
/
i , Cl_
„ / WOOD j .. / >A ,
DECK ^' .�
11
/ l
I CITY OF ASPEN
/ / GPSfl 3
SETBACK --J 16.3'
/ /
12713' 15 /
/
/ / / 10710'
12'/12 \
9711'/})--
YPC \
LS#24312 4712'\ /
TOP OF POST Cam SEITBACK 12e \ 5,
-------= }12"/16 Y
876'/ /
8 V N75.0g,/I,
a \5 60.00' - YPC
ciOn S LS#24312
A,r_ S , OF POST
� y 9
G 20.00'GCE\S
R.O.A 53
G
G S
\0 S
s
w
i
2
`o
i
E
1 10 0 10 20
,T14. APPROXIMATE SCALE—FEET RECEIVED
I H
L I
� 0 /F21/2021
21 -7-156 Kumar & Associates I LOCATION OF EXPLORATORY BORING 1g. 1
Y%
-
ASPCPti
BUILDING DEPARTMENT
BORING 1 LEGEND
EL. 7893'
p TOPSOIL; SILTY SAND WITH GRAVEL AND ORGANICS, FIRM,
MOIST, DARK BROWN.
♦ 44/12
X FILL: CLAYEY GRAVEL AND SANDY CLAY, MEDIUM DENSE TO
DENSE, MOIST, DARK BROWN.
17/12
WC=15.8
5 —200=66 O SAND AND GRAVEL (SM—GM); SILTY, COBBLES, DENSE, MOIST,
• GRAY—BROWN, ROUNDED ROCK.
56/12
WC=5.3
+4=40 � DRIVE SAMPLE, 2—INCH I.D. CALIFORNIA LINER SAMPLE.
—200=20
10 DRIVE SAMPLE, 1 3/8—INCH I.D. SPLIT SPOON STANDARD
w— 41/12 PENETRATION TEST.
44 12 DRIVE SAMPLE BLOW COUNT. INDICATES THAT 44 BLOWS OF
_— _ / A 140—POUND HAMMER FALLING 30 INCHES WERE REQUIRED
43/12 TO DRIVE THE SAMPLER 12 INCHES.
o WC=3.1
15 -0•:;.t +4=45
—200=8
NOTES
1. THE EXPLORATORY BORING WAS DRILLED ON FEBRUARY 9, 2021
WITH A 4—INCH DIAMETER CONTINUOUS FLIGHT POWER AUGER.
20r. 2. THE LOCATION OF THE EXPLORATORY BORING WAS MEASURED
yi38/12 APPROXIMATELY BY PACING FROM FEATURES SHOWN ON THE
SITE PLAN PROVIDED.
3. THE ELEVATION OF THE EXPLORATORY BORING WAS OBTAINED
BY INTERPOLATION BETWEEN CONTOURS ON THE SITE PLAN
PROVIDED.
25 4. THE EXPLORATORY BORING LOCATION AND ELEVATION SHOULD BE
CONSIDERED ACCURATE ONLY TO THE DEGREE IMPLIED BY THE
METHOD USED.
5. THE LINES BETWEEN MATERIALS SHOWN ON THE EXPLORATORY
BORING LOG REPRESENT THE APPROXIMATE BOUNDARIES
BETWEEN MATERIAL TYPES AND THE TRANSITIONS MAY BE
GRADUAL.
6. GROUNDWATER WAS NOT ENCOUNTERED IN THE BORING AT THE
TIME OF DRILLING.
7. LABORATORY TEST RESULTS:
WC = WATER CONTENT (%) (ASTM D 2216);
+4 = PERCENTAGE RETAINED ON NO. 4 SIEVE (ASTM D 6913);
—200 = PERCENTAGE PASSING NO. 200 SIEVE (ASTM D 1140).
riF
s
En 1
rl
61 21 -7-156 Kumar &Associates LOG OF EXPLORATORY BORING
0 51/2o21
ASPEN
BUILDING DEPARTMENT
HYDROMETER ANALYSIS SIEVE ANALYSIS
TIME READINGS U.S. STANDARD SERIES CLEAR SQUARE OPENINGS
24 HRS 7 HRS
io, 45 MIN 15 MIN 6OMIN 19MIN 4MIN 1MIN #200 #100 #50#40#30 #16 #10#8 #4 3/8" 3/4" 1 1 2" 3" 5"6" 8"0
90 10
80 - 20
70 30
60 - 40
G
50 50 '
a 40 60
30 70
20 80
10 90
0 I I I I I I I I 11 I I 111 II 1 I 1 11 I I I I II 1 I I I I I I I I I I I I I II II 100
.001 .002 .005 .009 .019 .037 .075 .150 .300 I .600 1.18 2.36 4.75 9.5 19 38.1 76.2 127 200
.425 2.0 152 I
DIAMETER OF PARTICLES IN MILLIMETERS
CLAY TO SILT SAND GRAVEL COBBLES
FINE MEDIUM COARSE FINE COARSE
GRAVEL 40 % SAND 40 % SILT AND CLAY 20 %
LIQUID LIMIT PLASTICITY INDEX
SAMPLE OF: Clayey Gravel and Sand (Fill) FROM: Boring 1 0 7'
HYDROMETER ANALYSIS SIEVE ANALYSIS
TIME READINGS U.S. STANDARD SERIES CLEAR SQUARE OPENINGS
24 HRS 7 HRS
1D0 45 MIN 15 MIN 60MIN 19MIN 4MIN 1MIN #2 0 #100 50#40 30 16 #10#8 #4 3/8" 3/4" 1 1 2" 3" 5"6" 8"O
90 10
80 20
70 30
60 - 40
50 - 50
rc
u 40 60 '
30 70
20 80
10 90
v 1
13
0 I I 1 1 1 1 I I I 1 1 1 1 1 1 I I 1 1 1 11 I I I I I I III I I I I I I III 100
.001 .002 .005 .009 .019 .037 .075 .150 .300 .600 1.18 12.36 4.75 9.5 19 38.1 76.2 127 200
<71 .425 2.0 152
DIAMETER OF PARTICLES IN MILLIMETERS
SAND GRAVEL
CLAY TO SILT COBBLES
FINE MEDIUM COARSE FINE COARSE
E GRAVEL 45 % SAND 47 % SILT AND CLAY 8 %
LIQUID LIMIT PLASTICITY INDEX
These test results apply only to the
e SAMPLE OF: Slightly Silty Gravel and Sand FROM: Boring 1 0 15' samples which were tested. The
testing report shall not be reproduced,
E„ except In full, without the written
g2 approval of Kumar & Associates, Inc.
e L Sieve ant analysis testingis 9 r3. h __in
accordance with A M D691 f m
Ii ASTM C136 and/or STM D1140
E,i"
o 21 -7-156 Kumar & Associates GRADATION TEST RESULTS
_> 0 5/E1i2021
ASPEN
BUILDING DEPARTMENT
I( i Kumar&Associates,Inc.°
Gumar&Aland Materials Engineers
and Environmental Scientists
TABLE 1
SUMMARY OF LABORATORY TEST RESULTS
Project No.21-7-156
SAMPLE LOCATION NATURAL NATURAL GRADATION ATTERBERG LIMITS UNCONFINED
MOISTURE DRY GRAVEL SAND PERCENT PLASTIC COMPRESSIVE
BORING DEPTH CONTENT DENSITY (%) (%) PASSING 200 S EVE LIQUID LIMIT INDEX STRENGTH SOIL TYPE
(ft) (%) (pcf) (%) (%) (psf)
1 4 15.8 66 Gravelly Sandy Clay (Fill)
7 5.3 40 40 20 Clayey Gravel and Sand
(Fill)
15 3.1 45 47 8 Slightly Silty Gravel and
Sand
RECEIVED
05/21/2021
ASPEN
BUILDING DEPARTMENT
Ic+AKumar&Associates,Inc.°
Gumar&Aland Materials Engineers
and Environmental Scientists
TABLE 2
PERCOLATION TEST RESULTS
PROJECT NO.21-7-156
HOLE NO. HOLE DEPTH LENGTH OF WATER DEPTH WATER DEPTH DROP IN AVERAGE
(INCHES) INTERVAL AT START OF AT END OF WATER LEVEL PERCOLATION
(MIN) INTERVAL INTERVAL (INCHES) RATE
(INCHES) (INCHES) (MIN./INCH)
50 48 2 1.5
48 47 1 3
47 46 1 3
B-1 124 3 46 45 1 3
45 44 1 3
44 431/2 6
43'/2 43 1/2 6
43 421/2 1/2 6
Note: The percolation test was conducted in the completed 4-inch diameter borehole on February 9, 2021.
RECEIVED
05/21/2021
ASPEN
BUILDING DEPARTMENT