Loading...
HomeMy WebLinkAboutFile Documents.406 E Hopkins Ave.0051-2023-BCOM (4) Section # Final Inspection Complies? Comments/Assumptions &Req.ID C303.3, Furnished O&M instructions for ❑Complies Requirement will be met. C408.2.5. systems and equipment to the 1❑Does Not 2 building owner or designated [FI17]3 representative. ['Not Observable ❑Not Applicable C408.1.1 Building operations and maintenance '❑Complies Requirement will be met. [F1571' documents will be provided to the ElDoes Not owner.Documents will cover ❑Not Observable manufacturers'information, specifications,programming ❑Not Applicable procedures and means of illustrating to owner how building, equipment and systems are intended to be installed, maintained, and operated. C408.2.5 Furnished as-built drawings for ❑Complies Requirement will be met. [FI16]3 electric power systems within 90 days ODoes Not of system acceptance. ❑Not Observable ❑Not Applicable C408.3 Lighting systems have been tested to OComplies Requirement will be met. [FI33]1 ensure proper calibration, adjustment, ODoes Not programming,and operation. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Dior-Aspen Temp-NEW Re o ate: Ej)(1E Data filename: it%2 eh 062 3 ASPEN BUILDING DEPARTMENT Interior Lighting : Passes using retail merchandise highlighting supplemental watts. Interior Lighting Compliance Statement Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the building plans,specifications, and other calculations submitted with this permit application.The proposed interior lighting systems have been designed to meet the 2021 IECC requirements in COMcheck Version COMcheckWeb and to comply with any applicable mandatory requirements listed in the Inspection Checklist. Julia Corrieri - Electrical Designer �� 10-23-2023 Name-Title Signature Date PFCFJProject Title: Dior-Aspen Temp- NEW Report date: i0' 3j.f Data filename: it/2��2 062 3 ASPEN BUILDING DEPARTMENT COMcheck Software Version COMcheckWeb (I11 11 Inspection Checklist Energy Code: 2021 IECC Requirements: 100.0% were addressed directly in the COMcheck software Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided. Section # Plan Review Complies? Comments/Assumptions & Req.ID C103.2 Plans, specifications, and/or ❑Complies Requirement will be met. [PRO calculations provide all information ❑Does Not with which compliance can be Not Observable determined for the interior lighting and electrical systems and equipment ❑Not Applicable and document where exceptions to the standard are claimed. Information provided should include interior lighting power calculations,wattage of bulbs and ballasts,transformers and control devices. Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) ® Project Title: Dior-Aspen Temp-NEW Re o at �/?: 3 Data filename: it%2 di2 062 3 ASPEN BUILDING DEPARTMENT Section # Rough-In Electrical Inspection Complies? Comments/Assumptions &Req.ID C405.2.3. Spaces required to have light- ❑Complies Requirement will be met. 1 reduction controls have a manual '❑Does Not [EL22]1 control that allows the occupant to reduce the connected lighting load in :Not Observable a reasonably uniform illumination ❑Not Applicable pattern >= 50 percent. _ C405.2.1, Occupancy sensors installed in ❑Complies Exception: Requirement does not apply. C405.2.1. classrooms/lecture/training rooms, ❑Does Not 1 conference/meeting/multipurpose [EL18]1 rooms, copy/print rooms, ['Not Observable lounges/breakrooms,enclosed offices, ❑Not Applicable open plan office areas,restrooms, storage rooms,locker rooms, corridors, warehouse storage areas, and other spaces <=300 sqft that are enclosed by floor-to-ceiling height partitions. Reference section language C405.2.1.2 for control function in warehouses and section C405.2.1.3 for open plan office spaces. C405.2.1. lOccupancy sensors control function in ❑Complies Exception: Requirement does not apply. 2 warehouses: In warehouses,the ❑Does Not [EL19]1 lighting in aisleways and open areas is controlled with occupant sensors that ['Not Observable automatically reduce lighting power ❑Not Applicable by 50%or more within 20 minutes of when the areas are unoccupied.The occupant sensors control lighting in each aisleway independently and do not control lighting beyond the aisleway being controlled by the sensor. Lights not turned off by occupant sensors is done so by time- switch. C405.2.1. Occupant sensor control function in ❑Complies Exception: Requirement does not apply. 3 open plan office areas: Occupant ❑Does Not [EL2O]1 sensor controls in open office spaces ['Not Observable >=300 sq.ft. have controls 1) configured so that general lighting can ❑Not Applicable be controlled separately in control zones with floor areas <=600 sq.ft. within the space, 2)general lighting in each zone permitted to turn on upon occupancy in control zone, 3) automatically turn off general lighting in all control zones within 20 minutes after all occupants have left the space, 4) are configured so that general lighting power in each control zone is reduced by>=80%of the full zone general lighting power within 20 minutes of all occupants leaving that control zone. C405.2.2, Each area not served by occupancy '❑Complies Requirement will be met. C405.2.2. sensors(per C405.2.1.1) have time- ❑Does Not 1 switch controls and functions detailed [EL21]2 in sections C405.2.2.1. ['Not Observable ❑Not Applicable 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) �� ® Project Title: Dior-Aspen Temp-NEW Re o ate: 3 Data filename: it%2 b�2 062 3 ASPEN BUILDING DEPARTMENT Section # Rough-In Electrical Inspection Complies? Comments/Assumptions & Req.ID C405.2.4, Daylight zones provided with ❑Complies Exception: Requirement does not apply. C405.2.4. individual controls that control the 1❑Does Not 1, lights independent of general area C405.2.4. lighting.See code section C405.2.3 ['Not Observable 2 Daylight-responsive controls for ONot Applicable [EL23]2 applicable spaces, C405.2.3.1 Daylight responsive control function and section C405.2.3.2 Sidelit zone. C405.2.5 Additional interior lighting power ❑Complies Requirement will be met. [EL27]1 allowed for special functions per the ODoes Not approved lighting plans and is ONot Observable automatically controlled and separated from general lighting. ONot Applicable C405.7 Low-voltage dry-type distribution ❑Complies Requirement will be met. [EL26]2 electric transformers meet the ODoes Not minimum efficiency requirements of ❑Not Observable Table C405.6. ONot Applicable C405.8 Electric motors meet the minimum ❑Complies Requirement will be met. [EL27]Z efficiency requirements of Tables ODoes Not C405.7(1)through C405.7(4). ['Not Observable Efficiency verified through certification under an approved certification ONot Applicable program or the equipment efficiency ratings shall be provided by motor manufacturer(where certification programs do not exist). C405.9.1, Escalators and moving walks comply ❑Complies Exception: Requirement does not apply. C405.9.2 with ASME A17.1/CSA B44 and have ❑Does Not [EL28]Z automatic controls configured to reduce speed to the minimum ['Not Observable permitted speed in accordance with ONot Applicable ASME A17.1/CSA B44 or applicable local code when not conveying passengers. C405.10 Total voltage drop across the 10Complies Requirement will be met. [EL29]2 combination of feeders and branch ❑Does Not circuits <=5%. ONot Observable ONot Applicable C405.1.1 At least 90%of dwelling unit ❑Complies Exception: Requirement does not apply. [EL3O]z permanently installed lighting shall ❑Does Not have lamp efficacy>= 65 Im/W or luminaires with efficacy>= 45 Im/W ONot Observable or comply with C405.2.4 or C405.3. ONot Applicable C405.11, 50%of 15/20 amp receptacles ❑Complies Requirement will be met. C405.11.1 installed in enclosed offices, ODoes Not [EL31]Z conference rooms,copy rooms, break ❑Not Observable rooms, classrooms and workstations and >25%of branch circuit feeders ONot Applicable for modular furniture will have automatic receptacle control in accordance with C405.11.1. Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Dior-Aspen Temp-NEW Re o atEj)(1EDe: Data filename: it%2 6�2 062 3 ASPEN BUILDING DEPARTMENT Section # Final Inspection Complies? Comments/Assumptions &Req.ID C303.3, Furnished O&M instructions for ❑Complies Requirement will be met. C408.2.5. systems and equipment to the 1❑Does Not 2 building owner or designated [FI17]3 representative. ['Not Observable ❑Not Applicable C408.1.1 Building operations and maintenance '❑Complies Requirement will be met. [F1571' documents will be provided to the ElDoes Not owner.Documents will cover ❑Not Observable manufacturers'information, specifications,programming ❑Not Applicable procedures and means of illustrating to owner how building, equipment and systems are intended to be installed, maintained, and operated. C408.2.5 Furnished as-built drawings for ❑Complies Requirement will be met. [FI16]3 electric power systems within 90 days ODoes Not of system acceptance. ❑Not Observable ❑Not Applicable C408.3 Lighting systems have been tested to OComplies Requirement will be met. [FI33]1 ensure proper calibration, adjustment, ODoes Not programming,and operation. ❑Not Observable ❑Not Applicable Additional Comments/Assumptions: 1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) Project Title: Dior-Aspen Temp-NEW Re o ate: Ej)(1E Data filename: it%2 eh 062 3 ASPEN BUILDING DEPARTMENT