HomeMy WebLinkAboutFile Documents.406 E Hopkins Ave.0051-2023-BCOM (4) Section
# Final Inspection Complies? Comments/Assumptions
&Req.ID
C303.3, Furnished O&M instructions for ❑Complies Requirement will be met.
C408.2.5. systems and equipment to the 1❑Does Not
2 building owner or designated
[FI17]3 representative. ['Not Observable
❑Not Applicable
C408.1.1 Building operations and maintenance '❑Complies Requirement will be met.
[F1571' documents will be provided to the ElDoes Not
owner.Documents will cover ❑Not Observable
manufacturers'information,
specifications,programming ❑Not Applicable
procedures and means of illustrating
to owner how building, equipment and
systems are intended to be installed,
maintained, and operated.
C408.2.5 Furnished as-built drawings for ❑Complies Requirement will be met.
[FI16]3 electric power systems within 90 days ODoes Not
of system acceptance.
❑Not Observable
❑Not Applicable
C408.3 Lighting systems have been tested to OComplies Requirement will be met.
[FI33]1 ensure proper calibration, adjustment, ODoes Not
programming,and operation.
❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Dior-Aspen Temp-NEW Re o ate: Ej)(1E
Data filename: it%2 eh 062 3
ASPEN
BUILDING DEPARTMENT
Interior Lighting : Passes using retail merchandise highlighting supplemental watts.
Interior Lighting Compliance
Statement
Compliance Statement: The proposed interior lighting alteration project represented in this document is consistent with the
building plans,specifications, and other calculations submitted with this permit application.The proposed interior lighting
systems have been designed to meet the 2021 IECC requirements in COMcheck Version COMcheckWeb and to comply with any
applicable mandatory requirements listed in the Inspection Checklist.
Julia Corrieri - Electrical Designer �� 10-23-2023
Name-Title Signature Date
PFCFJProject Title: Dior-Aspen Temp- NEW Report date: i0' 3j.f
Data filename: it/2��2 062 3
ASPEN
BUILDING DEPARTMENT
COMcheck Software Version COMcheckWeb
(I11 11 Inspection Checklist
Energy Code: 2021 IECC
Requirements: 100.0% were addressed directly in the COMcheck software
Text in the "Comments/Assumptions" column is provided by the user in the COMcheck Requirements screen. For each
requirement, the user certifies that a code requirement will be met and how that is documented, or that an exception
is being claimed. Where compliance is itemized in a separate table, a reference to that table is provided.
Section
# Plan Review Complies? Comments/Assumptions
& Req.ID
C103.2 Plans, specifications, and/or ❑Complies Requirement will be met.
[PRO calculations provide all information ❑Does Not
with which compliance can be Not Observable
determined for the interior lighting
and electrical systems and equipment ❑Not Applicable
and document where exceptions to
the standard are claimed. Information
provided should include interior
lighting power calculations,wattage of
bulbs and ballasts,transformers and
control devices.
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) ®
Project Title: Dior-Aspen Temp-NEW Re o at �/?: 3
Data filename: it%2 di2 062 3
ASPEN
BUILDING DEPARTMENT
Section
# Rough-In Electrical Inspection Complies? Comments/Assumptions
&Req.ID
C405.2.3. Spaces required to have light- ❑Complies Requirement will be met.
1 reduction controls have a manual '❑Does Not
[EL22]1 control that allows the occupant to
reduce the connected lighting load in :Not Observable
a reasonably uniform illumination ❑Not Applicable
pattern >= 50 percent. _
C405.2.1, Occupancy sensors installed in ❑Complies Exception: Requirement does not apply.
C405.2.1. classrooms/lecture/training rooms, ❑Does Not
1 conference/meeting/multipurpose
[EL18]1 rooms, copy/print rooms, ['Not Observable
lounges/breakrooms,enclosed offices, ❑Not Applicable
open plan office areas,restrooms,
storage rooms,locker rooms,
corridors, warehouse storage areas,
and other spaces <=300 sqft that are
enclosed by floor-to-ceiling height
partitions. Reference section language
C405.2.1.2 for control function in
warehouses and section C405.2.1.3
for open plan office spaces.
C405.2.1. lOccupancy sensors control function in ❑Complies Exception: Requirement does not apply.
2 warehouses: In warehouses,the ❑Does Not
[EL19]1 lighting in aisleways and open areas is
controlled with occupant sensors that ['Not Observable
automatically reduce lighting power ❑Not Applicable
by 50%or more within 20 minutes of
when the areas are unoccupied.The
occupant sensors control lighting in
each aisleway independently and do
not control lighting beyond the
aisleway being controlled by the
sensor. Lights not turned off by
occupant sensors is done so by time-
switch.
C405.2.1. Occupant sensor control function in ❑Complies Exception: Requirement does not apply.
3 open plan office areas: Occupant ❑Does Not
[EL2O]1 sensor controls in open office spaces ['Not Observable
>=300 sq.ft. have controls 1)
configured so that general lighting can ❑Not Applicable
be controlled separately in control
zones with floor areas <=600 sq.ft.
within the space, 2)general lighting in
each zone permitted to turn on upon
occupancy in control zone, 3)
automatically turn off general lighting
in all control zones within 20 minutes
after all occupants have left the
space, 4) are configured so that
general lighting power in each control
zone is reduced by>=80%of the full
zone general lighting power within 20
minutes of all occupants leaving that
control zone.
C405.2.2, Each area not served by occupancy '❑Complies Requirement will be met.
C405.2.2. sensors(per C405.2.1.1) have time- ❑Does Not
1 switch controls and functions detailed
[EL21]2 in sections C405.2.2.1. ['Not Observable
❑Not Applicable
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) �� ®
Project Title: Dior-Aspen Temp-NEW Re o ate: 3
Data filename: it%2 b�2 062 3
ASPEN
BUILDING DEPARTMENT
Section
# Rough-In Electrical Inspection Complies? Comments/Assumptions
& Req.ID
C405.2.4, Daylight zones provided with ❑Complies Exception: Requirement does not apply.
C405.2.4. individual controls that control the 1❑Does Not
1, lights independent of general area
C405.2.4. lighting.See code section C405.2.3 ['Not Observable
2 Daylight-responsive controls for ONot Applicable
[EL23]2 applicable spaces, C405.2.3.1 Daylight
responsive control function and
section C405.2.3.2 Sidelit zone.
C405.2.5 Additional interior lighting power ❑Complies Requirement will be met.
[EL27]1 allowed for special functions per the ODoes Not
approved lighting plans and is ONot Observable
automatically controlled and
separated from general lighting. ONot Applicable
C405.7 Low-voltage dry-type distribution ❑Complies Requirement will be met.
[EL26]2 electric transformers meet the ODoes Not
minimum efficiency requirements of ❑Not Observable
Table C405.6.
ONot Applicable
C405.8 Electric motors meet the minimum ❑Complies Requirement will be met.
[EL27]Z efficiency requirements of Tables ODoes Not
C405.7(1)through C405.7(4). ['Not Observable
Efficiency verified through certification
under an approved certification ONot Applicable
program or the equipment efficiency
ratings shall be provided by motor
manufacturer(where certification
programs do not exist).
C405.9.1, Escalators and moving walks comply ❑Complies Exception: Requirement does not apply.
C405.9.2 with ASME A17.1/CSA B44 and have ❑Does Not
[EL28]Z automatic controls configured to
reduce speed to the minimum ['Not Observable
permitted speed in accordance with ONot Applicable
ASME A17.1/CSA B44 or applicable
local code when not conveying
passengers.
C405.10 Total voltage drop across the 10Complies Requirement will be met.
[EL29]2 combination of feeders and branch ❑Does Not
circuits <=5%. ONot Observable
ONot Applicable
C405.1.1 At least 90%of dwelling unit ❑Complies Exception: Requirement does not apply.
[EL3O]z permanently installed lighting shall ❑Does Not
have lamp efficacy>= 65 Im/W or
luminaires with efficacy>= 45 Im/W ONot Observable
or comply with C405.2.4 or C405.3. ONot Applicable
C405.11, 50%of 15/20 amp receptacles ❑Complies Requirement will be met.
C405.11.1 installed in enclosed offices, ODoes Not
[EL31]Z conference rooms,copy rooms, break ❑Not Observable
rooms, classrooms and workstations
and >25%of branch circuit feeders ONot Applicable
for modular furniture will have
automatic receptacle control in
accordance with C405.11.1.
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Dior-Aspen Temp-NEW Re o atEj)(1EDe:
Data filename: it%2 6�2 062 3
ASPEN
BUILDING DEPARTMENT
Section
# Final Inspection Complies? Comments/Assumptions
&Req.ID
C303.3, Furnished O&M instructions for ❑Complies Requirement will be met.
C408.2.5. systems and equipment to the 1❑Does Not
2 building owner or designated
[FI17]3 representative. ['Not Observable
❑Not Applicable
C408.1.1 Building operations and maintenance '❑Complies Requirement will be met.
[F1571' documents will be provided to the ElDoes Not
owner.Documents will cover ❑Not Observable
manufacturers'information,
specifications,programming ❑Not Applicable
procedures and means of illustrating
to owner how building, equipment and
systems are intended to be installed,
maintained, and operated.
C408.2.5 Furnished as-built drawings for ❑Complies Requirement will be met.
[FI16]3 electric power systems within 90 days ODoes Not
of system acceptance.
❑Not Observable
❑Not Applicable
C408.3 Lighting systems have been tested to OComplies Requirement will be met.
[FI33]1 ensure proper calibration, adjustment, ODoes Not
programming,and operation.
❑Not Observable
❑Not Applicable
Additional Comments/Assumptions:
1 High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3)
Project Title: Dior-Aspen Temp-NEW Re o ate: Ej)(1E
Data filename: it%2 eh 062 3
ASPEN
BUILDING DEPARTMENT