Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
File Documents.1425 Silver King Dr.0097-2023-BROF (10)
G4RLI5LE W/P PRODUCTS WIP 300HT High-Temperature Protection Self-Adhering Roofing Underlayment WIP 300HT is a high-tensile-strength rubberized asphalt underlayment specifically designed to withstand �� temperatures up to 250°F(121°C).Ideal for use under metal including copper,zinc and COR-TEN®(consult technical department for installation instructions),WIP 300HT can also be used under synthetic,concrete W IP 300WATER&ICE PROTECTION HIGH-TEMPERATURE PROTECTION 1and clay tiles and asphalt shingles.This strong,skid-resistant membrane is available in either black or white and provides superior protection from water penetration caused by wind-driven rain and ice dams. Features and Benefits Storage • Protects the roof structure from water seepage caused by ice dams and WIP 300HT roofing underlayment rolls should be stored on their side,under wind-driven rains cover and in areas where the temperature is between 40°and 100°F • Resists temperatures up to 250°F without degradation of the adhesive (4.4°and 38°C).Do not double-stack pallets. • Seals around roofing nails,staples and screws • Split-release film provides easier,faster installation Warranty • Resists cracking,drying and rotting,providing long-term waterproofing Carlisle WIP products are backed by Carlisle's industry leading warranty.Carlisle performance and low lifecycle cost WIP Products will display optimal performance when stored under recommended conditions and used within one year of date of manufacture.Product installed • Concealed waterproofing system will not detract from the architectural after one year of date of manufacture is not covered under defect warranty.Visit aesthetics of the primary roofing system our website for warranty details. • Exposed rubberized asphalt bead along the membrane edge ensures watertightness of lap seams Installation • 180 days exposure time WIP 300HT underlayment is applied when the roof deck is dry and the Standards substrate temperature is 40°F(4.4°C)or higher.At temperatures below 40°F, nailing or priming should be used to temporarily hold the membrane in place • UL Classified while adhesion develops.WIP 300HT is designed to be covered with the • ICC-ES ESR#2206 primary roofing system and should not be exposed to sunlight for more than 60 days(black film only).White underlayment offers exposure time of • 2009,2012,and 2015 International Building Coder" 180 days. • Florida Building Code Approved Product#6785 Meets ASTM D1970 Substrate must be free of any moisture.If moisture is present,it may inhibit • adhesion.Prepare the roof deck by removing all loose objects,dirt,dust and • Miami-Dade County Product Control Approved debris.For re-roofing applications,remove all old materials from the roof deck in • ASTM E108/UL 790 Class A Fire Resistance the area to be covered with WIP 300HT underlayment.Replace water-damaged • 2016 California Green Building Standards,Title 24 sheathing and sweep roof deck thoroughly. • 2015,2012,and 2008 ICC 700 National Green Building Standard A • Ill N. •. --....V.••, : -- I 46411: I • —f-- f N.MOW 1 - _��v .� `'mac.. -ate, L. ASPEN BUILDING DEPARTMENT L.4RL/SLE WIP PRODUCTS WIP 300HT High-Temperature Protection Self-Adhering Roofing Underlayment Priming Limitations Priming is not required on clean,dry wood,metal or most polyisocyanurate surfaces (polyiso paper facer does require priming).Masonry and exterior gypsum boards • WIP 300HT should be installed when air,roof deck and membrane (such as DensDeckm)should be primed using an appropriate primer or adhesive. temperatures are at or above 40°F(4.4°C). Some rigid insulation boards with porous or dusty surfaces may require priming to • WIP 300HT should not be left exposed to sunlight for more than 60 days for promote initial adhesion.Priming is required on all substrates when air or substrate black membrane or 180 days for white membrane. temperatures are below 40°F(4.4°C).Adhesives such as CCW-702,CCW-702WB, • WIP 300HT membrane should not be folded over the roof edge unless protected CAV-GRIP'"and CCW-AWP are approved for use with WIP products.Refer to your by a gutter or other flashing materials. local building codes to determine acceptable product for use in your region. • The primary roof system must be ventilated to prevent excessive moisture Selection of roof deck or insulation substrate and/or use of a primer or adhesive are build-up in the interior structure. the responsibility of the architect,specifier or roofing contractor to determine based • Use caution during the installation of the membrane as it may become slippery on the roof assembly and environmental conditions. when wet or covered with frost. • WIP 300HT must not to be used in contact with PVC material. Valleys,Hips&Ridges • WIP 300HT is not approved for use in foam set tile applications. Cut WIP 300HT roofing underlayment into manageable lengths.Align over the center • WIP 300HT is not designed for wall assemblies. of the valley,hip or ridge.Remove release film.Press the middle of the membrane first before working toward the edges.For open valleys,cover WIP 300HT roofing underlayment with metal valley liners. PRODUCT SPE ,TION Eaves&Rakes PHYSICAL PROPERTIES Cut WIP 300HT underlayment into 10-15'pieces.Remove 2-3'of release film and Black/White Engineered Polyolefin align the edge of the membrane,sticky side down,so it overhangs the drip edge Surface Composite Film with Factory-applied by%"(10 mm).Continue to remove release film and press as you move across the Anti-skid Coating roof.Use a hand roller and/or hand pressure to press into place.Overlap end laps a Membrane Rubberized Asphalt minimum of 6".WIP roofing underlayment should reach a point 2'inside the interior PRODUCT CHARACTERISTIC UNITS RESULTS wall line.Local codes may require additional courses.If additional courses are required,the top lap must be at least 31/2". Roll Length feet 66 Roll Weight lbs 55 Drip Edges Roll Size sq ft 198 At the rake edge,apply WIP 300HT underlayment first and place drip edge on top.At Roll Width inches 36 the eave,apply drip edge first and place WIP underlayment on top of the drip edge so that it overhangs drip edge by%"(10 mm). TYPICAL PERFORMANCE PROPERTIES TEST METHOD RESULTS Thickness ASTM D1970 40 mils For standard installation details,follow the WIP detail drawings.For non-standard installation instructions,contact your local Carlisle WIP representative. Low Temperature Flexibility ASTM D1970 45°F Adhesion to Plywood at 75°F ASTM D1970 35 lbs/ft Metal Roof Underlayment Lap Seam Adhesion at 75°F ASTM D1970 21 Ibs/ft Under water-shedding metal roof systems or low-slope metal roofs with a minimum Sealability Around Nail ASTM D1970 Pass '/i'slope,start at the low point and apply WIP 300HT over the full surface of the roof deck.Review the metal roofing manufacturer's instructions for limitations and Slip Resistance ASTM D1970 Pass precautions.Beginning at the eaves,apply underlayment from the low point to the Thermal Stability ASTM D1970 Pass high point of the roof,running the roll horizontally. Moisture Vapor Permeance ASTM D1970 0.02 perms Lap Edges Water Absorption ASTM D1970 0.5% Lap edge seams should be hand rolled to ensure maximum adhesion. Tensile Strength Machine Direction ASTM D412 250 psi Tensile Strength Transverse Direction ASTM D412 1390 psi Elongation at Break Machine Direction ASTM D412 250% Elongation at Break Transverse Direction ASTM D412 170% PACKAGING INFORMATION Boxes(rolls)per pallet 25 y c�PSSIF/4 icc MIAMIDADE COUNTY r C ® APPROVED RECjS Carlisle WlP Pr d17 / 0 1285 Ritner Highway•Carlisle,PA Carlisle,WIP and CAV-GRIP are trademarks of Carlisle.DensDeck is a registered trademark of Georgia-Pacific.©2019 Carlisle. 888.717.1440 605059-WIP 300HT Sell Sheet-07.16.19 www.carlislewipproducts.com MADE IN VIA.) J BUILDING DEPARTMENT