HomeMy WebLinkAboutFile Documents.211 W Hopkins Ave.0078-2021-BRES (25) Permit #21-0976
Aspen Building Permit Application Checklist
THE CITY OF ASPEN for Single Family, Duplex, & Townhome (IRC)
JOB ADDRESS211 W. HOPKINS AVE - CABIN PARCEL I.D. NUMBER2753512463003
OWNER Matt Joblon and Vaughan Capital Partners LP DATE 04/30/2021
The following are potential requirements for various types of residential projects. Permits must include
ALL of the applicable items on this checklist or they will not be accepted. Incomplete permits
will be turned away. Refer to the IRC Building Submittal Guide, Zoning Checklist, Engineering
Sufficiency Checklist, Engineering Design Standards, CMP Manual and guides from other referral
departments for clarifications and descriptions on each item. Digital copies of all documents and
plans are required for all submittals.
8 1/2" x 11" Documents
Submittal New Addition Alteration Interior Demo Repair
Requirements Constructi /Remodel only (complete)
on Alteration
Planning
Approvals
HPC - SEE ✓❑ ❑
ATTACHED
Residential
Design
Standards ❑ ❑ ❑
Approval
Permit
Application
Packet* ❑ � ❑ ❑
Asbestos test
and clearance
reports ❑ ❑
State Asbestos
Demolition
Approval Notice
Fireplace
Registration
Form & ❑ E ❑
Manufacturer's
installation CEIVED
instructions
2/14/18 Page 1 of 4
05/21/2021
ASPEN
BUILDING DEPARTMENT
Energy Code
Compliance
IP
U-Factor
Fenestration
Docs
N/A - SEE SHEET .? CODE
ANALYSIS FOR HISTORICAL
E,(E'MPTION
documents
N/A - SEE
HOUSE PERMIT
SUBMISSION
Line Grade
Verification
Form
Signed Special
Inspection and
Testing n n
Agreement
Verification of
Structural ❑ ❑
Integrity
Soils Report
Drainage Report
Smuggler
Superfund Soil
Removal Permit
Mechanical Docs
RECEIVED
2/14/18 Page 2 of 4
05/21/2021
ASPEN
BUILDING DEPARTMENT
Submittal New Addition Alteration/ Interior Demo Repair
Requireme Constructi Remodel only (complete)
nts on Alteration
Photos
Unit/Buildin ❑ ❑ ❑
9
relationship
CMP ❑ ❑ ❑
Engineering
Sufficiency .111
Checklist
Residential
ECU ❑
Calculator
Landscape
Efficiency ❑ ✓ ❑
Checklist
Fire
Suppression
Calculations
Water/sewe
r service ❑
disconnect
applications
*Permit Application Packet must be filled out in its entirety including contact sheet, land use/scope of work questions,
building description form, HOA compliance form, asbestos checklist, valuation affidavit, and zoning compliance
verification policy or your submittal will not be accepted.
24"x36" & 11"x17" Plans
Sheets must be in the following order. Existing plans required for all additions &alterations
Submittal New Addition Alteration/ Interior Demo Repair
Requireme Constructi Remodel only (complete)
nts on Alteration
Cover Sheet
Survey
A
Floor Area
Calcs: ❑ ✓
Existing &
Proposed
Demolition
Calcs ✓
Fire Area
Sheet ❑ ✓
CEIVED
2/14/18 Page 3 of 4
05/21/2021
ASPEN
BUILDING DEPARTMENT
Site Plan
✓ ❑
RREMP Plan
Floor Plans:
Existing & ❑ ❑
Proposed
Reflected
Ceiling Plans ❑ ❑
Lighting
Plans w/
❑ ❑
spec sheet
Sections
✓
Details
Air Sealing W
11111
Details
Fireplace
Details ❑ � ❑
Schedules
✓
Excavation/ VIP
Earth
Retention
Plans
Civil Plans
Mechanical
Plans
Structural
Plans ❑
Radon Plan
RECEIVED
2/14/18 Page 4 of 4
05/21/2021
ASPEN
BUILDING DEPARTMENT