HomeMy WebLinkAboutFile Documents.211 W Hopkins Ave.0078-2021-BRES (38) Sufficiency Checklist THE CITY OF ASPEN CITY OF ASPEN ENGINEERING DEPARTMENT SUFFICIENCY REVIEW REQUIREMENTS If the project will increase impervious area(this includes enlarging a driveway, adding hard surface patios, increasing the footprint of the house, etc.), disturb>200SF of exterior area(this includes grading, even if a structure or hard surface isn't added), or add or repair snowmelt then an engineering review will be required as part of the Building Permit or Landscape and Grading Permit Application review process. All permit applications that must receive an engineering review are required to schedule and participate in a Pre-Application Meeting with the Development Engineer. The sufficiency checklist below and any necessary supporting documents should be completed prior to this meeting, as they will be reviewed during the meeting. The Development Engineer's signature on this checklist is required in order to submit a Building Permit Application. Project Address: 211 W Hopkins Ave, Aspen CO Project Common Location/Common Name: Pan Abode Parcel ID Number: 2753512463003 Owner and Phone Number: Matt Joblon and Vaughan Capital Partners LP 508-344-2557 Contact and Phone Number and e-mail address: Jennifer Ramsey Jennifer.rmsey@rowlandbroughton.com 1. How much land will be disturbed? acres= 2000 sq.ft. If one acre or more is disturbed, a CDPHE Construction General Permit is required. Yes,Notice of Coverage has been included in the CMP. No, A statement that Notice of Coverage is not required has been included in the CMP. 2. How much impervious area will be disturbed? 0 sq.ft. Added? 1000 sq.ft. 3. What is the estimated total impervious area of the site (not just the addition)? 1000 sq.ft. 4. What type of permit is being sought(Building or Landscape/Grading)? Building 5. What sub-basin(see Secion 1.5 of URMP)is the project located within? Aspen 6. What level of project is this—Minor or Major? Major In general,the project is considered"Minor"if 200— 1000 sq ft of disturbance/work and"Major" if > 1000 sq ft of disturbance/work. RECEIVED Revised 11-30-14 05/21/2021 ASPEN BUILDING DEPARTMENT The following information is required for the engineer's review. Please indicate if these documents have been completed and are attached. If any of these documents are not applicable,please provide an explanation in the space provided. Included N/A 7. Minor Grading and Drainage Plan and Report 8. Major Grading and Drainage Plan and Report El 9. Compliant City of Aspen Survey ✓ 10. Soils Report U I FT 11. Excavation Stabilization Plan U 12. Construction Management Plan (CMP) TO BE SUBMITTED WITH FIRST COMMENT RESPONSES 13. Pu• c mprovemen equiremen s 14. Floodplain Development Requirements (n a 15. Mudflow Analysis FT El I hereby declare the engineering information submitted in this sufficiency review for this project is sufficient for City of Aspen Building Permit Application submittal. Digitally signed by Jennifer Ramsey Jennifer Ramsey DN US, 05/07/2021 E=jenn fifer.ramsey@ rowland broughton.com, 0="Rowland+groughton",CN=Jennifer Ramsey Date:2021.05.07 21:44:07-06'00' Applicant's Signature Date City of Aspen Development Engineer's Signature Date RECEIVED Revised 11-30-14 05/21/2021 ASPEN BUILDING DEPARTMENT