HomeMy WebLinkAboutFile Documents.610 S West End St.0138-2021-BRES (8) CONSTRUCTION MANAGEMENT PLAN 610 S West End St Unit K204 September 17, 2021 Project is an interior remodel of a 1050 square foot, single floor condominium unit. TABLE of CONTENTS Introduction and Table of Contents 1 Vicinity 2 Project Introduction, Dates of Construction, Hours of Construction 3 Contact Designation 4 Sequence of Construction, Adjoining Properties, Project Fencing, Public Health&Welfare,Natural Environment, Parking Management, Emergency Vehicles & Ordinance 35, Staging Areas, Traffic Control 5 Pedestrian Protection, Sediment& Erosion Control, Fugitive Dust Control, Emissions,Noise Suppression 6 Site Plan City of Aspen Residential Permit Parking Official Heavy Haul Route Map Construction Noise Suppression Plan Form RECEIVED 610 S West End St Unit K204 1109/2021 ASPEN BUILDING DEPARTMENT VICINITY MAP Address 610 S West End St Unit K204 Aspen CO 81611 .-r - . r y E • , ..,.., #''.L , illpf lir p riviivir . ;13 Ara Park ` Silverglo i,,, o ,. :Olt 20. , . - , . ,,,, tie ', '% , 41:14,...„ 1 . (% . .. ... Ali* . ifilV-9 f- - The Gant � _ 1:"'� b0 • ,. t ti 'r sit: br . ..*: , •-- ( rco,` .sr , RECEIVED 610 S West End St Unit K204 11/99/2021 ASPEN BUILDING DEPARTMENT PROJECT INTRODUCTION • Project disturbance is limited to the interior of the condominium unit which is 1300 square feet. • The project is located on the 3rd floor of building F at 610 S West End St. The building consists of residential condo units The proposed development is limited to the interior remodel, and replacement of some windows, of unit#304. The building and unit are currently connected to public utilities including water and sewer and the project is not expected to have any effect on these utilities. Permits Applied For: Demolition Permit # Building Permit # • Project Notification will be performed by the general contractor as required. • A project sign will be posted on the window of the unit so that it is visible from the parking/driveway in front of the unit. DATES OF CONSTRUCTION • The project dates will be 4/1/22—7/1/22 HOURS OF CONTRUCTION • Construction hours will be limited to 7:30am—5:30pm Monday through Friday and 9am—5pm on Saturday. No construction work will be performed on Sundays, 4th of July day and/or weekend if it falls on a Friday or Monday, Memorial Day and Labor Day weekends, Thanksgiving Day, Christmas Day,New Years Day. • No work will be performed during the Food& Wine Festival in June (Friday thru Saturday). • All activity that generates noise in excess of 80 decibels requires a noise suppression plan and is restricted to operating between the hours of 9am and 5pm Monday through Friday. RECEIVED 610 S West End St Unit K204 11/9 9/2 0 21 ASPEN BUILDING DEPARTMENT CONTACT DESIGNATION Owner—D2 Properties Of Florida, LLC (352) 615-8891 General Contractor Office—Janckila Construction (970) 927-6714 General Contractor Site Supervisor—Pete Waaraniemi (970) 319-3650 Safety Officer— Sarah Janckila(970) 963-7239 Traffic Control Officer—Not Applicable Erosion Control Representative—Not Applicable City of Aspen Community Development Department (970) 920-5090 City of Aspen Fire Department—(970) 925-5532 City of Aspen Police Department—(970) 920-5400 Emergency Fire &Police 911 Aspen Valley Hospital—(970) 925-1120 Roaring Fork Transit Authority (RFTA)—(970) 925-8484 Aspen School District—(970) 925-3760 Holy Cross Energy Electrical—(970) 945-5491 Xcel Energy Natural Gas —(800) 895-2999 Century Link Telephone—(800) 603-6000 Comcast Xfinity Cable—(800) 266.2278 RECEIVED 610 S West End St Unit K204 11/9 9/2 0 21 ASPEN BUILDING DEPARTMENT ADJOINING PROPERTIES • Not applicable -there is no exterior excavation work required. PROJECT FENCING • Not applicable - all of the work is primarily confined to the interior of the unit. PUBLIC HEALTH AND WELFARE • The general contractor, shall uphold utmost respect to public health and welfare. NATURAL ENVIRONMENT • Not applicable—it is an interior remodel project with no threat to trees or other natural elements. PARKING MANAGEMENT • All parking to be contained to Gant parking lot. EMERGENCY VEHICLE ACCESS AND ORDINANCE 35 • See attached Site Plan for emergency vehicle access,parking and staging areas. STAGING AREAS • Materials storage will be inside the unit to be remodeled. • Construction Dumpster to be staged on Gant property • A construction office trailer will not be necessary, the inside of the unit will accommodate a desk. TRAFFIC CONTROL • The need for traffic control is not anticipated at this time. • No heavy hauls are anticipated for this project. Haul route will be S West End St to HWY 82 • The heaviest construction related vehicle anticipated at this time will be a dual cab pick-up truck with trailer or, if necessary, a trash truck to haul a 10 yd max.dumpster. • Deliveries to the job site are expected to consist of light loads with drywall being the heaviest. One delivery truck at a time will be scheduled. PEDESTRIAN PROTECTION • Not applicable SEDIMENT AND EROSION CONTROL • Not applicable—project is an interior remodel. FUGITIVE DUST CONTROL RECEIVED 610 S West End St Unit K204 11/9 9/2 0 21 ASPEN BUILDING DEPARTMENT • Not applicable—project is an interior remodel and all surfaces traveled by vehicles are paved. EMISSIONS • All vehicles and equipment used on site will be properly maintained such that the engines will function within manufacture's standards or parameters. • Emissions from diesel engines operated within the City of Aspen shall be of a shade or density no darker than 40% opacity, except for starting motion no longer than 10 seconds or for stationary operation not exceeding 10 seconds. NOISE SUPRESSION • Not applicable, interior remodel HALL ROUTE S 4 I r ' 'oz. 4 :- .i ,-- .-: ! : i Q.�#! z 4. i. /•��, ket • - <.�, ... =_ et ., "1 .1-/ ---sir- _ ° . _• ,� 4. ! , ovi,iv - fi E wraliiit Air -ry•ti ,' i p `- ;r:# j, , 4-it -- _ -- .."jell • " t'l C a nt Ave `, , - - - }..• te a• �+�C .L 0 E Dvran ,�•�~ t;� - i Dean sr* 44; O •I . 4. ,s,. A AL , t ,. = �... ''J. it...: p i 4: a : illi • ? , f ' 4 : . 7 - i,v '.., l, g l', i ,r,Ar 4 - .� `°-q' r 4 `sty• iri . - 4.11 RECEIVED 610 S West End St Unit K204 11/9 9/2 0 21 ASPEN BUILDING DEPARTMENT