Project is an interior remodel of a 1050 square foot, single floor condominium unit.
TABLE of CONTENTS
Introduction and Table of Contents 1
Vicinity 2
Project Introduction, Dates of Construction, Hours of Construction 3
Contact Designation 4
Sequence of Construction, Adjoining Properties, Project Fencing,
Public Health&Welfare,Natural Environment, Parking Management,
Emergency Vehicles & Ordinance 35, Staging Areas, Traffic Control 5
Pedestrian Protection, Sediment& Erosion Control, Fugitive Dust Control,
Emissions,Noise Suppression 6
Site Plan
City of Aspen Residential Permit Parking
Official Heavy Haul Route Map
Construction Noise Suppression Plan Form
RECEIVED
610 S West End St Unit K204 1109/2021
ASPEN
BUILDING DEPARTMENT
VICINITY MAP
Address
610 S West End St Unit K204
Aspen CO 81611
.-r - . r y
E •
, ..,..,
#''.L , illpf lir p riviivir
.
;13
Ara
Park ` Silverglo
i,,,
o
,. :Olt 20. , . - , . ,,,,
tie ', '% ,
41:14,...„
1 . (% . .. ... Ali* .
ifilV-9 f- - The Gant � _ 1:"'�
b0 • ,. t
ti 'r
sit: br . ..*: , •-- (
rco,` .sr ,
RECEIVED
610 S West End St Unit K204 11/99/2021
ASPEN
BUILDING DEPARTMENT
PROJECT INTRODUCTION
• Project disturbance is limited to the interior of the condominium unit which is 1300
square feet.
• The project is located on the 3rd floor of building F at 610 S West End St. The
building consists of residential condo units The proposed development is limited to
the interior remodel, and replacement of some windows, of unit#304. The building
and unit are currently connected to public utilities including water and sewer and the
project is not expected to have any effect on these utilities.
Permits Applied For:
Demolition Permit #
Building Permit #
• Project Notification will be performed by the general contractor as required.
• A project sign will be posted on the window of the unit so that it is visible from the
parking/driveway in front of the unit.
DATES OF CONSTRUCTION
• The project dates will be 4/1/22—7/1/22
HOURS OF CONTRUCTION
• Construction hours will be limited to 7:30am—5:30pm Monday through Friday and
9am—5pm on Saturday. No construction work will be performed on Sundays, 4th of
July day and/or weekend if it falls on a Friday or Monday, Memorial Day and Labor
Day weekends, Thanksgiving Day, Christmas Day,New Years Day.
• No work will be performed during the Food& Wine Festival in June (Friday thru
Saturday).
• All activity that generates noise in excess of 80 decibels requires a noise suppression
plan and is restricted to operating between the hours of 9am and 5pm Monday
through Friday.
RECEIVED
610 S West End St Unit K204 11/9 9/2 0 21
ASPEN
BUILDING DEPARTMENT
CONTACT DESIGNATION
Owner—D2 Properties Of Florida, LLC (352) 615-8891
General Contractor Office—Janckila Construction (970) 927-6714
General Contractor Site Supervisor—Pete Waaraniemi (970) 319-3650
Safety Officer— Sarah Janckila(970) 963-7239
Traffic Control Officer—Not Applicable
Erosion Control Representative—Not Applicable
City of Aspen Community Development Department (970) 920-5090
City of Aspen Fire Department—(970) 925-5532
City of Aspen Police Department—(970) 920-5400
Emergency Fire &Police 911
Aspen Valley Hospital—(970) 925-1120
Roaring Fork Transit Authority (RFTA)—(970) 925-8484
Aspen School District—(970) 925-3760
Holy Cross Energy Electrical—(970) 945-5491
Xcel Energy Natural Gas —(800) 895-2999
Century Link Telephone—(800) 603-6000
Comcast Xfinity Cable—(800) 266.2278
RECEIVED
610 S West End St Unit K204 11/9 9/2 0 21
ASPEN
BUILDING DEPARTMENT
ADJOINING PROPERTIES
• Not applicable -there is no exterior excavation work required.
PROJECT FENCING
• Not applicable - all of the work is primarily confined to the interior of the unit.
PUBLIC HEALTH AND WELFARE
• The general contractor, shall uphold utmost respect to public health and welfare.
NATURAL ENVIRONMENT
• Not applicable—it is an interior remodel project with no threat to trees or other
natural elements.
PARKING MANAGEMENT
• All parking to be contained to Gant parking lot.
EMERGENCY VEHICLE ACCESS AND ORDINANCE 35
• See attached Site Plan for emergency vehicle access,parking and staging areas.
STAGING AREAS
• Materials storage will be inside the unit to be remodeled.
• Construction Dumpster to be staged on Gant property
• A construction office trailer will not be necessary, the inside of the unit will
accommodate a desk.
TRAFFIC CONTROL
• The need for traffic control is not anticipated at this time.
• No heavy hauls are anticipated for this project. Haul route will be S West End St to
HWY 82
• The heaviest construction related vehicle anticipated at this time will be a dual cab
pick-up truck with trailer or, if necessary, a trash truck to haul a 10 yd max.dumpster.
• Deliveries to the job site are expected to consist of light loads with drywall being the
heaviest. One delivery truck at a time will be scheduled.
PEDESTRIAN PROTECTION
• Not applicable
SEDIMENT AND EROSION CONTROL
• Not applicable—project is an interior remodel.
FUGITIVE DUST CONTROL
RECEIVED
610 S West End St Unit K204 11/9 9/2 0 21
ASPEN
BUILDING DEPARTMENT
• Not applicable—project is an interior remodel and all surfaces traveled by vehicles
are paved.
EMISSIONS
• All vehicles and equipment used on site will be properly maintained such that the
engines will function within manufacture's standards or parameters.
• Emissions from diesel engines operated within the City of Aspen shall be of a shade
or density no darker than 40% opacity, except for starting motion no longer than 10
seconds or for stationary operation not exceeding 10 seconds.
NOISE SUPRESSION
• Not applicable, interior remodel
HALL ROUTE
S 4 I r
' 'oz.
4 :- .i ,-- .-: ! : i Q.�#!
z 4.
i. /•��,
ket • - <.�, ... =_
et
.,
"1 .1-/ ---sir-
_ ° . _• ,�
4. ! , ovi,iv -
fi E wraliiit
Air -ry•ti ,' i p `- ;r:# j, , 4-it -- _ -- .."jell • " t'l C
a nt Ave `, , - - - }..• te a•
�+�C .L 0 E Dvran ,�•�~ t;� -
i Dean sr* 44; O •I .
4. ,s,. A AL ,
t ,. = �... ''J.
it...: p i 4:
a : illi
• ? , f ' 4 : . 7 - i,v '.., l, g l',
i ,r,Ar 4 - .� `°-q'
r
4 `sty• iri
. - 4.11
RECEIVED
610 S West End St Unit K204 11/9 9/2 0 21
ASPEN
BUILDING DEPARTMENT