HomeMy WebLinkAboutFile Documents.211 W Hopkins Ave.0078-2021-BRES (46) 41001
CITY OF ASPEN
WATER EFFICIENT LANDSCAPING STANDARDS (WELS) ORDINANCE
Information & Documentation Checklist
IMPORTANT: This checklist does not constitute approval of the WELS review. This document is to
inform the applicant and the City of what constitutes a complete WELS application.
Effective August 13, 2018, the City of Aspen Water Efficient Landscaping Standards, Ordinance 17, Series
2018, shall apply to the following projects that use City of Aspen potable water:
WELS Section 2.1.1- Landscaping, grading, installing or disturbing hardscapes, additions to
structures, etc. that has a disturbance area greater than 1,000 square feet and greater than 25% of the
entire site.
WELS Section 2.1.2- All building permits that trigger a "substantial remodel" per Title 25 of the
Municipal Code, defined as the increase by fifty percent (50%) or more in the water using capacity of
new water using devices or fixtures installed on a property, as measured by the ECU rating of the
existing and proposed structure(s).
Links to the Water Efficient Landscaping Standards, the Water Budget Analysis & Calculation Sheet, the
WELS Documentation Requirements, and Example Plans can be found at:
www.cityofaspen.com/199/Landscape-Ordinance.
For assistance in compiling required documentation package, please contact Rick Magill, WELS Plans
Reviewer at rick.magill@cityofaspen.cotn.
WATER SUPPLY INFORMATION
If water is to be provided by City of Aspen,the Applicant must answer the following questions:
1. Is the property already receiving City of Aspen water service? ® Yes ❑ No
2. Is there a well or wells on the property'? ❑ Yes 0 No
3. Are there other water sources/supplies on the property? ❑ Yes 0 No
If yes, name other water sources/supplies:
4. Will raw water be used for irrigation on this property? ❑ Yes 0 No
If yes, provide proof of a raw water agreement, an account number, and/or proof of right.
5. Are there existing city water taps to be disconnected? ® Yes ❑ No
RECEIVED
Doc last updated: 10/23/2020 05/Page�ot31
ASPEN
BUILDING DEPARTMENT
WELS Information and Documentation Checklist continued
REQUIRED INFORMATION AND DOCUMENT CHECKLIST
PROJECT INFORMATION
Date: 05/07/2021
Project Address:211 W. Hopkins
Project Type(e.g. New Construction,Redevelopment,Remodel,Addition):Addition
Total Property in Sq. Ft.:6,000 *Disturbance Area in Sq. Ft.:3,216
*Disturbance Area is defined as the external area of the building site where the ground is disturbed,which includes,but is not limited
to: soil grading,landscaping,removing impervious area,adding impervious area,replacing impervious area,layback areas,and stock
pile areas.
Total Landscaped Area in Sq. Ft:3,158 Irrigated Area in Sq. Ft.:2,763
**Affected Area is the building square footage plus the
**Affected Area in Sq. Ft.: disturbance area,with the building square footage equaling the
6,000 building footprint alteration plus the new square footage.
Zone District:Zone x Non-Irrigated Right-of-Way Area: 114
Irrigated Right-of-Way Area:685 Non-Irrigated Native Area:0
Exterior Hardscape(Impervious)Area: 1675 Structure(s)Footprint Area: 1864 + 920 = 2784
0 - none
Exterior pools spas and water features as measured by ECU rating
of existing and proposed structures:
AUTHORIZED PROJECT/OWNER REPRESENTATIVE
Project/Owner Representative Name: Chris Busley Project/Owner Rep. Ph:970-401-3882
Project/Owner Rep. Email:busley@bluegreenaspen.com
Irrigation Designer Name: Hines Irrigation - Nate Hines Irrigation Designer Email:nate@hinesinc.com
Landscape Designer Name: bluegreen - Matt Moritz Landscape Designer Email:matt@bluegreenaspen.com
PROPERTY OWNER INFORMATION
Owner Name: Matt & Alissa Joblon
Mailing Address: 205 Detroit St, Suite 400 City Water Acct. Number:
Phone:508-344-2557 Email:
RECEIVED
021
Doc Last Reviewed: 10/23/2020 05/Page2 ofi s
ASPEN
BUILDING DEPARTMENT
WELS Information and Documentation Checklist continued
REQUIREMENTS: COMMENTS: SUBMITTAL COMPLIANCE Checked
by Plan Reviewer:
Site Development Plan Identify Development/Disturbance Area 0 Yes ONo
Landscape Design Plan, and Soils/Soil Required Components Listed in the WEL 0 Yes ONo
Amendment Information Standards
Irrigation Design Plan, and Required Components Listed in the WEL 0 Yes ONo
Hydrozone Information Standards
Water Budget Calculation Worksheet Required Component Listed in the WEL 0
Standards Yes ONo
Pools &Water Features (spas,pools, Is there a pool,spa or water feature? 0 Yes ONo
ponds, fountains, etc.)
Are pool and spa covers proposed? 0 Yes ONo
Do features use a recirculating water
system and/or recycled water? 0 Yes ONo
APPLICANT ACKNOWLEDGEMENT
I/we agree to comply with the requirements of the City of Aspen Water Efficient Landscaping Standards and submit a
complete Site Plan, Landscape Plan, Soils Standards,Irrigation Plan,Hydrozone Plan, and Water Budget Documentation
Packet for review by the City of Aspen.
05-07-2021
Applicant Signature Date
Chris Busley
Print Name
FOR INTERNAL USE ONLY:
sat HIM
CHECKLIST REVIEWED BY:
DATE: 05/07/2021
++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++
WELS REVIEW IS NOT REQUIRED (Documentation reviewed by the signatory below)
AUTHORIZED BY:
DATE:
RECEIVED
Doc Last Reviewed: 10/23/2020 05/Page3 ofi 2l
ASPEN
BUILDING DEPARTMENT