Loading...
HomeMy WebLinkAboutFile Documents.635 W Bleeker St.0104-2023-BROF (10) CITY OF ASPEN Field Plan Set Must Be Printed In Color �14 PERMIT NO.0104-2023-BROF pa'EERVIC EON ' OWNER 635 BLEEKER STREET LLC SKETCH REPORT 1 MEASUREMENTS DIAGRAM ICC-ES Evaluation Report ESR-1410 I Reissued June 2020 CITY OF ADDRESS 635 W BLEEKER ST �W �t �'r This report is subject to renewal June 2022. ASPEN PARCEL ID 273512401301 /3"5JQ� ) lisI 4" www.icc-es.orq I (800)423-6587 I (562)699-0543 A Subsidiary of the International Code Council® 1nV DIVISION:07 00 00-THERMAL AND MOISTURE shakes and shingles have higher levels of chemical These plans muus eKeept at the PROTECTION retention than the"Class C"treated shakes and shingles. Section:07 31 29-Wood Shingles and Shakes Fire-retardant-treated starter course materials are supplied building site or inspection by FSR Treatment,Inc.or Chemce,Inc.and are produced r REPORT HOLDER: from No.2 grade taper sawn shakes or No.2 grade delays may occur.Construction APPLICATION ACCEPTED DATE: 2023-10-06 PERMIT NUMBER: 0104-2023-BROF = - shingles complying with the previously referenced code shall conform to these plans.All FSR TREATMENT,INC. sections,and are also available in"Class B"and"Class C." changes shall be approved by F' Products are sold under the trade names FSR FTX. S. '," ADDITIONAL LISTEE: 4.0 DESIGN AND INSTALLATION the building official. o• COMMUNITY DEVELOPMENT DEPARTMENT 4/4�� " rS0 CHEMCO,INC. 4.1 General: 1` The wood shakes and shingles must be installed on � dligi 'L EVALUATION SUBJECT: � '�/ rT/ spaced or solid sheathing complying with the applicable SEPARATE PERMITS ARE BUILDING PERMIT COVERSHEET '�� ten w r FSR, FTX, FIRE-RETARDANT-TREATED WOOD cede.The wood shakes must be installed in accordance REQUIRED FOR ELECTRICAL, ,v v SHAKES AND SHINGLES with IBC Section he wood IRC Section t be in or UBC PLUMBING,MECHANICAL,OR CITY OF ASPEN e' Section 150with The wood shingles must ct installed in FIRE SPRINKLER WORK 1.0 EVALUATION SCOPE accordance with IBC Section Fasteners 1507.8,IRC Section 905.7 or ,...• -� , UBC Section 1507.13. must be stainless steel PROPERTY INFORMATION 19 -'� >>ti✓• Compliance with the following codes: complying with ASTM A580 Type 304 or 316.The wood shakes must be installed on roofs with a minimum slope of SMOKE ALARMS AND ■2012,2009 and 2006 International Building Code.(IBC) 4:12(33%),while wood shingles may be installed on roofs CARBON MONOXIDE ADDRESS: 635 W BLEEKER ST UNIT: r r- x' s •2012,2009 and 2006 International Residential Code° with a minimum slope of 3:12(25%). DETECTORS REQUIRED PARCEL ID: 273512401301 LEGAL DESCRIPTION: NEVITT HISTORIC LOT SPLIT T.y 4 LF . (IRC) Weather exposure of the hip and ridge shakes or THROUGHOUT DWELLING OWNER: 635 BLEEKER STREET LLC A ,- �, •2013 Abu Dhabi International Building Code(ADIBC)f shingles must not exceed those exposures permitted for UNIT PER CITY OF ASPEN PERMIT CONTRACTOR: 'errImZ 1 the fold of the roof. / 'The ADIBC is based on the 20091BC.20091BC code sections referenced MUNICIPAL CODE 8.15 C`,r in this report are the same sections in the ADIBC. Starter courses at the cave must be doubled, with 4 r % •1997 Uniform Building Codex'(UBC) the first course being full-size treated shakes or shingles ny- 1r yT vs- ' or 15-inch (381 mm)treated starter-course shakes or - y VI' Properties evaluated: shingles. Fifteen-inch (381 him) or 18-inch (457 him) DESCRIPTION OF WORK Re-Roof • • C. t treated shakes or shingles may be used for the final course ■Roof covering at the ridge. It should be known that this review shall P ,,• a \ •Fire classification 4,2 C Roof Covering: not relieve the applicant of their L r S hIOL"LLI / 2.0 USES ducts labeled as"Class B"shakes or shingles en be responsibility to comply with the a I r I 1 T,- ? / The fire-retardant-treated wood shake and shingle roof installed in accordance with Section 4.1 of this report,o requirements of the City of Aspen i- coverings are for use where Class A,B or C wood roof spaced or solid sheathing covered either with one lave 1[r,• Municipal Code.Pursuant to 1 I( \ silt aJ Gr 1 s coverings are permitted. of '/,-inch-thick (6.4 him) Dens-Deck° Roof Board, USE OF BUILDING Single Family FIRE SPRINKLER REQUIRED? S 1 I 7 L�, manufactured by Georgia Pacific Corporation, or with Sec.26.104.050,any permit or approval I 3.0 DESCRIPTION one layer of mineral-surfaced cap sheet complying wi issued in error or otherwise not in (,•,"CT"e➢5 I The fire-retardant-treated wood shakes and shingles are STM D3909. Where undedayment is required, e conformity with the requirements of this produced from No. 1 grade western red cedar shakes tin ayment shall be installed over the Dens-De oard Title,shall be void.Similarly,any permit CLASS OF WORK Residential FIRE SPRINKLER TYPE complying with IBC Section 1507.9.6 (2012 and 2009 or mine aced cap sheet. Fasten gth for the tT — +1 1-A'l e- ..2 yo'LF��'-1 —E..xx — wp Wail codes and 1507.9.5(2006 code),IRC Section R905.8.5 or shakes or shingles e for the thickness of or approvalissued in reliance upon or ' i 1 I 5 LO Rake Valley PI,:h Cwope UBC Section 1507.12,or No.1 western red cedar shingles the Dens-Deck board or cap sheet.The Dens-Deck boards as a result of,a materially false REQUIRED SPECIAL Ridge scan unax,.., complying with IBC Section 1507.8.5 (2012 and 2009 must be fastened to spaced or solid sheathing using a statement or representation made in BUILDING TYPE IRC '1 Z codes)and 1507.8.4(2006 code),IRC Section R905.7.4 or minimum of four fasteners per board to avoid panel shifting ( ) INSPECTIONS Vt/I �-t^'r' Zl UBC Section 1507.13.The shakes and shingles,having a prior to installation of the shakes or shingles.The mineral- the process Of obtaining the permit or 1 • - maximum moisture content of 25 percent,are pressure- surfaced cap sheet must be installed with 2-inch(51 min) development approval shall,likewise, treated by FSR Treatment, Inc. or Chemco, Inc.,with overlaps on the sides and ends,and attached with a be void.Any person having received a CONSTRUCTION TYPE ENERGY CODE COMPLIANCE - proprietary fire-retardant chemicals.Treated products are sufficient number of fasteners to hold the sheet in place void or voidable permit or approval identified as"Class B"or"Clans C."The"Class B"treated prior to installation of the shakes. Tom Ogden/Luis Property address P,oP n<d by shall not be relieved from having to • Nuniz Wood '°Ad e. comply with all applicable terms and WORK CHANGES BUILDING ICCoo,.daluation Reports are net to be co...4das representing aesthenes or any ether attributes not addressed nor are the to be coree„od 9 conditions of this Title and the City shall OCCUPANCY GROUP(IBC) Shakes Roof .` t endorsement owner t east tea ,Are war t e p sa an endors t of the subject of there recommendation ether warranty by Kr Evaluation Service,LLC e, implied,to v�aJ.ti.l.X o...ed..or other e.'n this report.or a any covered the report n __ not be estopped from fully enforcing FOOTPRINT? ,- ,_ MI �- ,71: Snow stops required at all locations Copyright 0 2020 ICC Evaluation Service,LLC.All lights reserved Page 1 of same. CODE EDITIONS 2021 IBC TOTAL SPA SQ.FT. where roofs could shed snow onto . (e lW-5 PAW ea.esi -9,1 f-a,tdED co SFL�-r HEAT TAPE MANDATORY CONTROL REQ'S. walkways,stairs,alleys,decks,exits, A-6c_S./ ltv n:, All heat tape systems shall meet the following per(Ordinae1 Series 2023): utilities and meters,emergency escape PP -Automatic controls configured for system shut off when air temperature is above and rescue opening window wells,or 'RE 40°F and comply with one of the following: OTHER CODE EDITIONS TOTAL SNOWMELT SQ.FT. -shut off in absence of moisture adjacent properties-Ordinance 1, - - _ -shut off at night(daylight sensor or timer) 2023. (��{� B4 1 . 1 f isvt HISTORIC PROPERTY? Yes TOTAL POOL SQ.FT. A^ IIVYI/j �No-0 cue 10/06/2023 rroA Snrn s� rORC00ECOMPUNICE • linzhid A/V CUSS E4-1 CDMIIL SHfIJQI� FIRE SPRINKLER EXISTING? Pr6e S.ppttrs ESR-1463 I Most Widely Accepted and Trusted Page 7 of 14 .L 24 G14tfyE Metes_-02 ep TABLE 1-PRODUCT NAMES(continued) .• lDj CARLISLE MULE-HIDE PRODUCT VERSICO PRODUCT WEATHERBOND ROOFING PRODUCTS C,UttaLB2Cy,AFr- Cxufr-YL. PRODUCT NAME NAME NAME PRODUCT NAME INTERNATIONAL .,_1' PRODUCT NAME CG /��7 1 t Cold Applied Adhesive Cold Applied Adhesive Cold upped Adhesive Cold Applied Adhesive RPI C .Applied V 1 V t�%Y0.lS Adhesive Flexible FAST Adhesive I Helix°Max Low-Rise Flexible DASH Adhesive Flexible DASH Adhesive Festexrd Flex Adhesive Adhesive OlyBond 500 Adhesive - OlyBond 500 Adhesive OlyBond 500 Adhesive OlyBond 500 Adhesive TABLE 2-FIRE CLASSIFICATION ASSEMBLIES-ADHERED ROOFING SYSTEMS'' Final Roof Inspection II= SYNOEM ROOF CLASS DECK A BARRIER BOARD SLOPE OR SLIP SHEET INSULATION' MEMBRANE REQUIRED 1 '/4:12 Sure-Weld,Spectra-Weld Sure-Seal FR,Sure-Tough, Sura-White,Sure-Seal FleeceBACK, 1 2 '/,:12 Any of the following Sure-Weld HS,Sure-WeItl SAT-TPO, `o-,`.r/ i u Once roof work is complete, you insulations, pure-Weld FleeceBACK, (�/ ` �F thickness:Carlisle Spectro-Weld FleeceBACK, Amenity Energy Use Approved(2921 CODE) A Noncombustible SecurShield Polyiso", Sure-White FleeceBACK Mid-Roof Inspection must request a final roof "lnaulease°.Hunter Sure-Flex PVC FleeceBACK, 0 RREMP ❑ CREMP 3 ,/12 Panels'H-Shield"or'H- Sure-Flex KEE HP FleeceBACK, Shield-CO" Sure-Flex PVC FRS FleeceBACK, \ REQUIRED inspection. Sure-Flex KEE HP FRS FleeceBACK A64v�+E /hg7At- IIJurQ. Vte 'pvd°`kS PERMIT#:0104-2023-BROF DATE:10/6/23_ sure-Flex PVC,Sure-Flex PVC FRs, 4 1 .12 Sure-Flex KEE HP HEAT TAPE TOTAL WATTAGE: 1200 After your roof permit is issued, Inspectors will inspect snow - 5 '1,12 Sure-White FleeceBACK �m WATTS/FT: 5 s 1:12 Sure-Seal FR,Sure-Tough mil -FPO' M I______E Sy1. /2 . and you have started work, you guards and heat tape (if Yrz-inch-thick fbe boartl°, Sure-White,Sure-Seal FleeceBACK, C 1z-inch-thick fiberboards L�Y'\ASt..G 5 6-r t1WO-wem TOTAL LINEAR FT: 240 oSectio 3.6)o Sure-Weld,Spectrad SAT Sure-Weld y ec EL� OFFSET: REMP PAYMENT must request a mid-roof applicable). or barrier HS,Sure-WeIdSAT-TPO. D£uS�Sure-Weld FleeceBACK, Q �C.Noncombustible - 5-inch max Insulfoam r�, y0. EPS',Vrz-inch-thick Spectra-Weld FleeceBACK, Cyr inspection. fiberboard or bonier boats Sure-Flex PVC,Sure-Flex PVC FRS, (see Section 3.6)over Sure-Flex KEE HP, NOTE: If there is heat tape System Ntiono.1 3.)avers Sure Flex PVC FleeceBACK, Sure-Flex KEE HP FleeceBACK, Inspectors will verify your Class present, a final roof inspection Sure-Flex PVC FRS FleeceBACK, Sure-FIex KEE HP FRS FleeceBACK 'Note: A assembly on site. cannot be requested until the 8 2 —Flee eBACK -The first 1000W are exempt from REMP. s 1'/,:1z sure-white,Sure -�eor�eACK 2,gq_ -All roof permits will require a sub-electrical sub-electrical permit is applied Sure-Tough,Sure-Weld,Spectra- e P q 0 Noncombustible 3012 nsinch kick Sure-Weld FleeceBACK, C000 1 C.6 Sxl ,.t REVIEWED F O R permit applied for by a licensed electrician. or combustible •Densoepk Prime" spectra-Weld FleeceBACK . a**.�,�r -Asub-electrical ermitmustbea lied for You will request inspection for as both final inspections will 1, A -min.'s/,rz-inch- 4:12 or'/.-inch thick Sure-Weld HS,Sure-Weld SAT-TPO RECEIVED COMPLIANCE P PP thick plywood or "SECUROCK " "`IN 5'�ue Son prior to the final roof inspection as both final directly onSalesForce. occur simultaneously. 12 min.'/w-Inch- unlimited Gypsum Fiber Roof Sure-Seal FR,Sure-Flex PVC, PVC FRS,Sure-Flex inspections will occur simultaneously. thick OSB. Board" Sure-Flex PVC FleeceBACK,E HP ---..___.. 10/06/2023 10/24/2023 stuarth Sure-Flex KEE HP FleeceBACK, `, 13 3:12 Sure-Flex PVC FRS FleeceBACK, DCII�2_e _It�r' Sure-Flex KEE HP FRS Fleece 1.'7 UJ "rPEN BY H P C Luynber-Ato,,,. 11LDING DEPARTMENT