Loading...
HomeMy WebLinkAboutFile Documents.406 E Hopkins Ave.0051-2023-BCOM (7) Field Plan Set Must Be Printed In Color 1► COMcheck Software Version COMcheckWeb ;`'�;/ APPLICATION ACCEPTED DATE: 2023-10-09 PERMIT NUMBER: 0051-2023-BCOM Interior Lighting:Passes using retail merchandise highlighting supplemental watts. 114Interior Lighting Compliance Certificate interior Lighting Compliance �ddi0/ Statement Compliance Statement:The proposed interior lighting alteration project represented in this document Is consistent with the COMMUNITY DEVELOPMENT DEPARTMENT t/j j/� �PDO L/Cie building plans,specifications,and other calculations submitted with this permit application.The proposed interior lighting ;,''�� �� `PA.,' O �Y Z4YE�NF systems have been designed to meet the 2021 IECC requirements in COMcheck Version COMcheckWeb and to comply with any CITY OF O F applicable mandatory requirements listed in the Inspection Checklist. BUILDING PERMIT COVERSHEET ��S Project Information earl' r 1E—'c';•g,�' �•.� Julia Corrieri-Electrical Designer i 10-23-2023 ASPEN CITY OF ASPEN Energy Cade: 2021 IECC 0054039 Name-Title Signature Date Project Title: Dior-Aspen Temp-NEW 1 : PROPERTY INFORMATION Project Type: Alteration �(6S.•' .. •••Ci ADDRESS: 406 E HOPKINS AVE A2 UNIT: ONALE� These plans mu's eept at the PARCEL ID: 273707330013 LEGAL DESCRIPTION: 1515 THEATER CONDO Construction Site: Owner/Agent: Designer/Contractor: 10/23/2023 building site or inspection OWNER: HOPKINS ASPEN HOLDINGS LLC 406E Hopkins Avenue Christian Dior Couture Dialectic PERMIT CONTRACTOR: Aspen,Missouri 81611 510 Madison Avenue,5th Floor 310 W 20th St. delays may occur.Construction New York,New York 10022 Kansas City.Missouri 64108 shall conform to these plans.All Allowed Interior Lighting Power A e C D changes shall be approved by DESCRIPTION OF WORK Demolition of 4 interior partitions and a small section of wood floor in the proposed fitting room.New interior Area Category Floor Area Allowed Allowed Ifiliking official. partitions,patching of the drywall ceiling,new wallcoverings and replacing the existing doors.All ceiling lighting (ft2) Watts/ft2 Watts is existing to remain(re-Tamping only).Electrical work is limited to adding wall and floor outlets.There is no proposed mechanical or plumbing scope. 1-BOH(Common Space Types:Corridor/Transition>=8 ft wide):Exempt 2-Common Space Types:Office-Enclosed:Exempt SEPARATE PERMITS ARE 3-Sales Floor(Common Space Types:Sales Area) 1088 1.05 1142 REQUIRED FOR ELECTRICAL, Allowance:Furniture,clothing,cosmetics highlighting/Fix.ID:LED 112(a) 1.05 118(b) Allowance:Furniture,clothing,cosmetics highlighting/Fix.ID:Track 1088(a) 1.05 720(b) USE OF BUILDING Commercial FIRE SPRINKLER REQUIRED? Yes Lighting FIRE SPRINKLER WORK Supplemental Allowed Watts(null)= 990 Total Allowed Watts= 2970 CLASS OF WORK Commercial FIRE SPRINKLER TYPE NFPA 13 (a)Area claimed may exceed total floor area when Retail Merchandise Highlighting allowance(s)are specified. SMOKE ALARMS AND PLUMBING,MECHANICAL OR (b)Allowance is(B x C)or the actual wattage of the fixtures given in Proposed Power section,whichever is less. Supplemental watts must be associated with retail merchandise highlighting fixtures. CARBON MONOXIDE DETECTORS REQUIRED BUILDING TYPE(IRC) REQUIRED SPECIAL Area Category Exemption Qualifications THROUGHOUT DWELLING INSPECTIONS #Fixtures Total*Watts UNIT PER CITY OF ASPEN Activity Area pre-Alt. Repl./Added Pre-Alt. Post-Alt. CONSTRUCTION TYPE IIIA ENERGY CODE COMPLIANCE COMCheck UA Alternative p MUNICIPAL CODE 8.15 BOH(Common Space Types:Corridor/Transition>=8 180.000 180.000 ft wide 380 sa ft 1 WORK CHANGES BUILDING Exemption:Replacement of bulbs and ballasts only. OCCUPANCY GROUP(IBC) M FOOTPRINT? No common Snare Tvnes'Offire-Enclosed(200 sa ft 1 180.000 180.000 Exemption:Replacement of bulbs and ballasts only. It should be known that this review shall CODE EDITIONS 2021 IEBC TOTAL SPASQ.FT. Proposed Interior Lighting Power not relieve the applicant of their A B C D E responsibility to comply with the Fixture ID I Description/Lamp/Wattage Per Lamp/Ballast Lamps/ #of Fixture (C X D) OTHER CODE EDITIONS 202116C TOTALSNOWMELTSQ.FT. Fixture Fixture Watt. requirements of the City of Aspen Municipal Code.Pursuant to BOH(Common Space Tvoes:Corridor/Transition>=8 ft wide.380 sg.ft.):Exempt Sec.26.104.050,any permit or approval HISTORIC PROPERTY? Yes TOTAL POOLSQ.FT. Common Snare Tnsen:Offire-Enclosed(200 mfr.):Exempt issued in error or otherwise not in Sales Floor(Common Space Types.Sales Area 1088 sa ft 1 LED:Millwork:Other: 1 20 92 1830 conformity with the requirements of this Track Lighting:Existing Track Lights:Wattage based on current limiting device 0 0 720 720 Title,shall be void.Similarly,any permit FIRE SPRINKLER EXISTING? Yes capacity or approval issued in reliance upon or HID:Existing Can lights:Metal Halide:Pulse start: 1 6 70 420 as a result of,a materiallyfalse HID:Existing Can lights:Metal Halide:Pulse start: 1 4 70 Exempt Exemption:Retail display window statement or representation made in Total Proposed Watts= 2970 the process of obtaining the permit or development approval shall,likewise, Project Title: Dior-Aspen Temp-NEW Re o tB. /3 ® o�rGiy�D be void.Any person having received a Project Title: Dior-Aspen Temp-NEW Re o tt. /3 void or voidable permit or approval Data filename: it72g/20P23 Data filename: 1g ej26z/�f20623 shall not be relieved from having to ASPEN comply with all applicable terms and BUILDING DEPARTMENT ASPEN conditions of this Title and the City shall BUILDING DEPARTMENT not be estopped from fully enforcing same. FIRE SPRINKLERS 2021 IBC 601 Fire Resistive Requirements for READ THIS OR FAIL YOUR INSPECTION! REQUIRED Type of Construction: IIIA Primary Structural Frame: hr Dropped Ceilings and Soffits beneath fire rated (columns,beams,girders,etc) assemblies Exterior Bearing Walls: 2 hr 2021 IBC 80to th I This applies to the attachment of finishes or furring to any Interior Bearing Walls: 1 hr Floors/Ceilings: 1 hr assemblies that are required to be either fire-rated or non-combustible and is separate from the fire-rated Roof: 1 hr assembly requirement. Unless noted otherwise for occupancy separation or fire separation distance. 1.Dropped Ceilings&Soffits:If dropped 1% inches or less,do one of the following: Fill spaces with Class A material. Fill spaces with inorganic or non-combustible material. Fire block 8 feet in all directions. 2.Dropped Ceilings&Soffits:If dropped greater than 1%inches: Framing members,hangers,and other assembly members must be non-combustible.You may not use wood. In Type III and V construction only,you may use fire retardant tr r non-combustible framing. 3.Dropped Ceilings&Soffits below Heavy rIEKE11)Timber T&G ceilings,do all of the following:-One layer 5/8"type X gypsum board directly 03/2023 yj attached with minimum level one finish. -Drop ceiling according to ite 2 above as PORCODt;C011Y1U111GE applicable. j us tinh (City Policy) -I Xvacareoclaum rlf" "8 0 IDisp 10/16/2023 ZONING