Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
File Documents.211 W Hopkins Ave.0078-2021-BRES (55)
STORAGE STRUCTURES I / CF 4x4 cribbing; �, - CL of cribbing will be aA� ogsm�wit be t under — _ 6'from end walls slLl ri\ r LJ Li__ f - s2.00 cO 8; x31 © II .����������� _ - - - imilini Li _ �� i :"x31' li EXISTING CABIN "x 11P2 SF I -8x8x31 u �'d 1 1111 7/8 BC!90 2.001'-4"OC '' J — Temp framing for addition that will be T SHEATHING 32'beams will be a void during relo. foo'-o' ' under 31'beams —. 1 s.00 C . . F= �, l CO / co ( j • IIII I� �( X T/WALL UNO o x �-� G T-11 1/4lUN0 0 J — [ ' M , —" ':.. �� .. - T 8x8x31 ���- ® -11 1 j 99'-111/4" ] -,----- 1 III II 1 ' pocket;no Beam 77 smaller than t. � C 12X12 9 1/2 BC!6000 L8®1'-4 OC STAIRS Y 9Q _r--r 8x8x31 \ T Al, s'xs"x 1' III II � � IIdll Beams will.-under logs to supp.rt log./ I NON-HISTORICAL4i) HISTORICAL o SIM° 99-111/4 UNO CABIN •GC will disconnect utilities prior to cabin relocation •GC will remove all IFFR items and appliances prior to cabin relocation •Install temporary framing at voided common wall at historical and non-historical wall •Install plywood over windows to support and protect during cabin move •Beams will be placed on each side of doorways to support openings during move •Cut in 12x12 beam pockets for structural support members •Install (4) 8"x8"x31' steel beams to be ran north-south under cabin •Install (2) 8'x8"x32' steel beams to be ran east-west under cabin •Cut logs from existing floor system •Jack up cabin with air bags, mechanical, and hydraulic jacks •Cabin will be lifted off existing floor system and moved off existing floor system •Cabin will be moved (1st move) via rollers and skid steer to temporary location —see civil drawing •Once cabin has been relocated to temporary location, we will secure (while on existing beams) onto 4'x4' cribbing. Gravity will secure cabin onto cribbing. RECEIVED •Cabin will have a 6' high, secured, chain link fence around cabin •Once new foundation and floor system are complete, cabin will be 09/13/2021 moved (2nd move) back onto new foundation via rollers and skid steer. ASPEN BUILDING DEPARTMENT