Loading...
HomeMy WebLinkAboutFile Documents.909 E Hopkins Ave.0017-2023-BCHO IPA Pri architects October 27, 2022 RE: Change Order (3) to 909 E Hopkins, Aspen CO, Master Permit #0056-2021-BRES Change Order Narrative To Whom It May Concern, As requested, please find below the Narrative of the Revisions for this Change Order regarding Master Permit #0056-2021-BRES. Only Replacement Sheets for Architecture are included, plus Documents as listed below. For Structural, because all but two Sheets are impacted, the Entire Structural Set is included. • No Changes to Contact Sheet. • No Change to HOA status. • Minor Fireplace Revision, Reference "60.Fireplace and Woodstove Registration Form.909 E Hopkins.2022.10.27.pdf" • Revision to Photovoltaic system, Reference "10.Photovoltaic Application_Cutsheets_Mount.905 E Hopkins.2022.10.19.pdf", and "30.Renewable Energy Mitigation Program Worksheet.909 E Hopkins 2022.10.19.pdf". • Product Substitution for Radon Barrier, Reference "10.Radon Barrier Insulation_Cutsheet.909 E Hopkin.2022.10.19.pdf". SURVEY None, Sheets not included with CO Application. CIVIL None, Sheets not included with CO Application. IrWrig#agdad N/IN RECEIVED •• ZONING Imo Z-Group Architects. P.C. • 411 East Main Street.Aspen.CO.81611 • Telephone:970-925-1832 • Fax: 970-921713/114/2022 ASPEN BUILDING DEPARTMENT LANDSCAPE None, Sheets not included with CO Application. IRRIGATION None, Sheets not included with CO Application. ARCHITECTURAL 1-COVER • None. Z-001 • "Bump-out" at Primary Suite fireplace removed. Fireplace shifted North. FAR Calculations revised. • Exterior vertical chase added for Junior Suite Fireplace flue. FAR Calculations revised. Z-002 • None. Z-003 • None. Z-004 • None. A-001 • Screen wall/fence posts revised from wood to steel. A-002 • Photovoltaic Solar Array revised. A-003 • Exterior vertical chase added for Junior Suite Fireplace. Fire Area Calculations revised. • Bump-out" at Primary Suite fireplace removed. Fireplace shifted North. Fire Area Calculations revised. A-101 • Door B13 revised from Sliding to Dbl Swing. • Floor Drain added to Laundry Room. A-102 • Pocket Door(M8) added to Mud Room. A-103 • "Bump-out" at Primary Suite fireplace removed. Fireplace shifted North. FAR and Fire Area Calculations revised. • Exterior vertical chase added for Junior Suite Fireplace. FAR and Fire Area Calculations revised. • Hot Tub rotated 180 deg. Storage bench to east removed. Tub depth revised — adjacent screen wall height revised. A-104 • Lite Tubes deleted. • Photovoltaic Solar Array revised. • "Bump-out" at Primary Suite fireplace removed. Fireplace shifted North. FAR Calculations revised. A-105 • None. A-301 • Screen wall/fence posts revised from wood to steel. IEVIENEDmagdad 03/24/2023 ZONING RECEWED ■■ _ ▪ Z-Group Architects. P.C. • 411 East Main Street.Aspen.CO.81611 • Telephone:970-925-1832 • Fax: 970-921-13/114/2022 ASPEN BUILDING DEPARTMENT A-302 • Glass Rail at Hot Tub lowered, (adjacent bench removed, see Sheets A-103 and A-402 for other Hot Tub Revisions). • Screen wall/fence posts revised from wood to steel. • Exterior vertical chase added for Junior Suite Fireplace flue. FAR and Fire Area Calculations revised. A-303 • Screen wall/fence posts revised from wood to steel. A-304 • Screen wall/fence posts revised from wood to steel. • Exterior vertical chase added for Junior Suite Fireplace flue. FAR and Fire Area Calculations revised. A-401 • None. A-402 • Hot Tub rotated 180 deg. Storage bench to east removed. Tub depth revised — adjacent screen wall height revised. A-403 • None. A-404 • None. A-501 • None. A-502 • Alternative for under-slab Radon Barrier& Insulation added. A-503 • None. A-504 • The Entry Roof is similar to Type R-1 (without the pedestal system). Retain full cavity insulation or provide ventilation. • Deck, Patio, and Entry Patio finished floor height revised to be '/2" lower than Interior Finish Floor height. A-505 • Deck, Patio, and Entry Patio finished floor height revised to be '/2" lower than Interior Finish Floor height. A-506 • Deck, Patio, and Entry Patio finished floor height revised to be '/2" lower than Interior Finish Floor height. A-507 • Deck, Patio, and Entry Patio finished floor height revised to be '/2" lower than Interior Finish Floor height. A-508 • Beam relocated relative to column at southeast corner of garage. Ref. Detail 3. • Deck, Patio, and Entry Patio finished floor height revised to be '/2" lower than Interior Finish Floor height. A-509 • Deck, Patio, and Entry Patio finished floor height revised to be '/2" lower than Interior Finish Floor height. A-510 • None. ir)EVIENED magdad RI 03/24/2023 ZONING-) ONING RECEIVED ■■ _ ▪ Z-Group Architects. P.C. • 411 East Main Street.Aspen.CO.81611 • Telephone:970-925-1832 • Fax: 970-921-13/114/2022 ASPEN BUILDING DEPARTMENT A-511 • None. A-512 • None. A-513 • None. A-601 • None. A-602 • Door B13 revised from Sliding to Dbl Swing. • Pocket Door(M8) added to Mud Room. A-801 • None. A-802 • None. A-803 • None. MECHANICAL None, Sheets not included with CO Application. ELECTRICAL None, Sheets not included with CO Application. PLUMBING Plans not required by the City of Aspen. LIGHTING None, Sheets not included with CO Application. STRUCTURAL SO.1 • None. S1.1 • Fence and trash enclosure posts revised to be steel. Corresponding details updated. S2.1 • Fence and trash enclosure posts revised to be steel. Corresponding details updated. S2.2 • Roof and deck structure above Garage revised slightly. S2.3 • Roof structure updated to coordinate with selected solar arrays. DNE magdad 03/24/2023 RECEIVED ZONING Z-Group Architects. P.C. • 411 East Main Street.Aspen.CO.81611 • Telephone:970-925-1832 • Fax: 970-921-13/114/2022 ASPEN BUILDING DEPARTMENT S3.1 • None. S3.2 • Roof and deck structure above Garage revised slightly. S3.3 • Headers at Junior Suite and Primary Bath revised to accommodate larger window rough opening. S3.4 • Headers at Junior Suite and Primary Bath revised to accommodate larger window rough opening. • Fence and trash enclosure posts revised to be steel. Corresponding details updated. SHORING None, Sheets not included with this CO Application. Regards, Z-Group Architects P.C. Lidmagdad RI 03/24/2023 ZONING RECEIVED Z-Group Architects. P.C. • 411 East Main Street.Aspen.CO.81611 • Telephone:970-925-1832 • Fax: 970-921-13/114/2022 ASPEN BUILDING DEPARTMENT