HomeMy WebLinkAboutFile Documents.1012 E Cooper Ave.0102-2021-BRES (4) ADDRESS: 1012 E. Cooper PERMIT NUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT
BUILDING PERMIT CONTACT SHEET CITY OF ASPEN
FOR PLAN REVIEW QUESTIONS
Name Claude Salter,Aspen Development Services Phone 9- E-mail
- asp-n.eve semen servic- .gmi. . om
FOR INSPECTION QUESTIONS
Name Simon Bentley,Crawford Design Build Phone 6- • E-mail
' •• • •/ •
OWNER
• • • •
Name Phone , Cell Phone • e
adlfea 400 Bay Laurel Ct NE city Saint Petersburg State FL ZIP 33703
E-mail abelman@gmail.com, enee56@gmail.com
Address
OWNER'S AUTHORIZED AGENT
Name Phone Cell Phone
Mailing
Address City State ZIP
E-mail
Address
APPLICATION BEST CONTACT
Name Simon Bentley,Crawford Design Build Phone Cell Phone
Address 1101 Village Road, Unit LL2B city Carbondale State CO ZIP 81623
E-mail cdbsimon@comcast.net
Address
ARCHITECT OR DESIGNER OF RECORD
Name F&M Architecture Phone 970-987-2707 Cell Phone
Mailing
Address City Snowmass Village _State CO 21P
E-mail flynn@fandmarchitects.com
Address,
CIVILENGINEER OF RECORD
Name Phone Cell Phone
Mailin
Address City State ZIP
E-mail Address erniekollar@gmial.com
STRUCTUAL ENGINEER OF RECORD
Name Ernest'Ernie'Kollar,Kollar Engineering Inc. Phone • Cell Phone i i
Mailing 320 Main Street, Suite 203 Carbondale CO 81623
Address City State ZIP
E-mail erniekollar@gmial.com
Address
GENERAL CONTRACTOR
Name Crawford Design Build Phone Cell Phone
Mailing 1101 Village Road, Unit LL2B Carbondale CO 81623
Address City State ZIP
E-mail 1101 Village Road, Unit LL2B
Address
INSPECTIONS: The General Contractor must schedule inspections online.
Please visit www.aspenpitkin.com/Departments/Community-Development-Forms/to do so.
I hereby certify that I have read and exa n d this application and know the same to be true and correct. All provisions of laws and
ordinances governing this type of w w be complied with whether specified herein or not. The granting of a permit does not
presume to give authority to viola or ancel the provisions of any other state or local law regulating construction or the performance
of construction. It is my respon i ' to review the approved plans and any comments that are contained thereon and see that the
structure and/or project is buil complia with all applicable codes.
Contractor '� 06.01.2021
Signature r Date
❑ Check if you are a test d own uilder(single-family homes only).You must take a test and complete the owner/building affidavit.
(CITY USE ONLY) Owne " er approved by: Date: Affidavit on file
CITY OF ASPENAugustzo17 130 S. GALENA ST ASPEN, CO 81611j
RECEIVED
07/20/2021
ASPEN
BUILDING DEPARTMENT
ADDRESS: 1012 E.Cooper PERMIT NUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT
ZONING COMPLIANCE VERIFICATION POLICY
Applicability: All development projects must comply with the City's zoning regulations, including height and
location, and are subject to periodic inspection during construction and a final inspection prior to project
completion. When required by the City's Zoning Officer, certain development projects within the City of Aspen
shall verify height and/or location compliance through submission of a survey report.
Unless otherwise exempted, all commercial, multi-family, lodging, and mixed-use projects proposed within one
foot of the maximum permissible height or within one foot of allowable setbacks shall verify zoning compliance
through this method.
In addition, the Zoning Officer may require this method be used to verify zoning compliance for single-family/
duplex development or other projects where compliance may be in question. Independent of this policy, all
projects must comply with all applicable zoning limitations.
The Zoning Officer will inform the applicant during building permit review if verification will be required.
However, circumstances may require zoning compliance verification of a project which is already underway.
Timing: Height verification should be accomplished at a point of construction when enough roof structure is in
place to accurately measure the structure yet early enough in the process to still make changes if the structure
is too tall. Location verification should be accomplished at a point of construction when the final exterior of the
structure can be accurately measured in relation to setback requirements. Applicants are encouraged to confer
with the Zoning Officer regarding the timing of zoning compliance verification. Applicants are encouraged to
perform their own verification during construction to ensure the building is progressing to plan, including the
height and location of foundation forms prior to concrete pours.
Survey Report: A Colorado Professional Land Surveyor shall describe and depict the height and location of a
structure compared to the dimensions shown on the zoning sheets of the approved building permit plan set. The
City's Zoning Officer can assist in determining which elements of the structure should be measured and if natural
or finished grade should be used.
The report shall include the following information:
1-A brief cover letter with the building permit number, name of the project, name of the owner and general
contractor, with a written description of the measurement methods including date(s) of measurement.
2-For location verification: A plan drawing showing property boundaries, permitted setbacks, building envelope
(if applicable), location of foundation walls, location of the outermost exterior of each structure (inclusive of all
exterior veneer or other exterior treatments), and the location and dimension of each observed measurement.
3-For height verification: Elevation drawing(s) showing the natural or finished grade of the property, maximum
permitted height, building elevations including the nominal roof form (inclusive of the first layer of exterior
sheathing or weatherproofing membrane but excluding all exterior surface treatments such as shakes, shingles,
or other veneer treatments orornamentation), and the location and dimension of each observed measurement.
Additional roof plans showing location of measurements may be necessary.
CITY OF ASPEN August2017 130 S. GALENA ST ASPEN, CO 81611
RECEIVED
07/20/2021
ASPEN
BUILDING DEPARTMENT
PERMIT NUMBER: ADDRESS: 1012 E.Cooper
COMMUNITY DEVELOPMENT DEPARTMENT
ZONING COMPLIANCE VERIFICATION POLICY
4-Plans and elevations must include height or setback exemption items unique to the building, such as stair/
elevator overruns, utility/mechanical apparatus, hot tubs and spas, and other height or setback exemption items
unique to the project.
5-The report shall include a written description or drawing notes of the benchmarks or control points used to
establish property boundaries, setbacks, building location, building height,and grades for each measurement.
6-All drawings must correlate with the building locations, elevations, and grading/drainage representations in
the approved building permit set.
7-The report must include the signature, date, and stamp of Colorado Professional Land Surveyor who
conducted the field measurements certifying that the field measurements areaccurately represented.
Review and Acceptance of Report:The Zoning Officer shall review the report(s) and either confirm the project
conforms to the dimensions shown on the zoning sheets of the approved building permit plan set and meets
the zoning limitations for the property or shall determine which elements of the project are not in compliance.
The Zoning Officer may request additional information to verify zoning compliance, which may include but is not
limited to additional survey work or a site visit.
All drawings of the survey report must correlate with representations in the approved building permit set for
acceptance. Modifications to field conditions or amendments to the building permit may be required.
A determination of non-compliance shall result in the issuance of a correction notice and possible work
stoppage. Applicants are encouraged to verify zoning compliance as early as reasonably practical in the
construction process to minimize disruption to the construction schedule.
Acknowledgment:
Brad Crawford
I (contractor name) understand this policy. I agree that this project will
comply with the zoning limitations affecting this parcel and the representations made on the zoning sheets of
the approved building permit plans. I understand that a Certificate of Occupancy will not be issued until this
project complies with all applicable zoni limitations.
Contractor Signature:
Date:
06.01 .2021
CITY OF ASPEN August2017 130 S. GALENA ST ASPEN, CO 81611
RECEIVED
07/20/2021
ASPEN
BUILDING DEPARTMENT