Loading...
HomeMy WebLinkAboutFile Documents.909 E Hopkins Ave.0056-2021-BRES (4) Randy Henrie From: Denis Murray <denis.murray@aspen.gov> Sent: Thursday, December 23, 2021 5:31 PM To: Randy Henrie Cc: Sebastian Subject: 905 East Hopkins//0056-2021-BRES//935-391-889 Randy, A couple items left to address. 1) Provide an owners signature on the special inspection form. 2) Provide a spec for the Diamond spa that is certified by CEC.The document on file does not. 3) Sunscnsc revised the RREMP workshect. Done 4) Sheet A-404 revise to provide a handrail to the first riser or extend the platform to minimum landing dimension. 5) Sheet A-002 add a detail for the pedestal snow melt system and provide a spec for the product.We do not accept this product on grade. 6) Sheet A-102 revise to show the snow melted driveway . 7) Select a air barrier method from the options provided. AO, Denis Murray (He/Him/His) Plan Examination Manager I Community Development Department OFFICE 970.429-2761 CELL 970-309-6283 CITY OF ASPEN FAX 970-920-5440 www.cityofaspen.com 1:3 Our Values:Stewardship I Partnership I Service I Innovation Notice and Disclaimer: This message is intended only for the individual or entity to which it is addressed and may contain information that is confidential and exempt from disclosure pursuant to applicable law. If you are not the intended recipient, please reply to the sender that you have received the message in error and then delete it. Further, the information or opinions contained in this email are advisory in nature only and are not binding on the City of Aspen. If applicable, the information and opinions contained in the email are based on current zoning, which is subject to change in the future, and upon factual representations that may or may not be accurate. The opinions and information contained herein do not create a legal or vested right or any claim of detrimental reliance. RESPONSES 1. Form revised and uploaded to Salesforce. 2. Spa is custom and considered as non-exempt, and is included with the REMP Calculations. Cover meets ASTM 1346 (shown on Cutsheet) and APSP-15 worksheet included. Ref. file "10.Hot Tub Data.905 E Hopkins.(905 Lot 2 3. See issue 6 below. 4. Sheet A-404, handrail extended to first riser (Basement). 5. Pedestal snowmelt system intended for roof deck only: Notes on A-002 clarified. Pedestal system shown on Detail 3/A-502, which references a "Therma Hex" tray system with R-10 insulation - cutsheet & specifications uploaded to Salesforce in file "10.Pedestal Snowmelt.909 E Hopkins (905 Lot 2 " ED 6. Note added to Sheet A-102 that refers to Sheet A-002; snowmelt at driveway revised to match pr REZ driveway reconfiguration - resulting in a snowmelt area reduction. Calculations updated and REMP form updated and uploaded to Salesforce. 1 01/18/2022 7. The following Note has been added to Sheets A-510 thru A-513,"This Project to use Sheet A-511, EXT%Qg SHEATHING, Sheets A-510, A-512, and A-513 are for general reference only." BUILDING DEPARTMENT