Loading...
HomeMy WebLinkAboutFile Documents.909 E Hopkins Ave.0056-2021-BRES (7) JVA,Incorporated III\--I/ III\1� 817 Colorado Avenue "„"„""' Suite 301 Glenwood Springs, CONSULTING ENGINEERS CO 81601 February 17, 2022 970.404.3100 info@jvajva.com City of Aspen Engineering Department City Hall www.jvajva.com 130 S. Galena Aspen, CO 81601 RE: 905 Hopkins Avenue Residence Comment Response Letter JVA Job No. 3382c Dear Reviewer: 1. The recently submitted document shows this calc for the drywell lid. Please do the same for each inlet shown on pg 22 of the drainage report(one trench drain, 3 8" area drains, and a 4"x4" fitting). JVA Response:Inlet calculations have been provided for all inlets. The 4"x4"fitting is not an inlet. 2. Provide easement for the transformer. Easement area shall be 11'x18', with 3' of clearance on each side of the 5'x5' transformer and 10' of clearance on the front. JVA Response:A transformer pad and easement are now shown on the plans. 3. Please include discussion of proposed curb in drainage report for 909 E Hopkins. JVA Response:Discussion of the curb has been included in the drainage report. 4. Provide spot elevations at the location where the overflow path will cross the sidewalk to ensure that drainage will successfully cross the sidewalk to meet the curb and gutter. JVA Response:Additional spot elevations are shown. Sincerely, JVA, INCORPORATED By: J.R. S g, P. . Senior Project Manager RECEIVED 03/31/2022 BOULDER FORT COLLINS WINTER PARK GLENWOOD SPRINGS DENVER ASPEN BUILDING DEPARTMENT 0056-2021 -BRES_909 E Hopkins_Engineering Comments3 1 (3) Subject: Dev Rev the recently submitted document shows this calc Page: 1 Author: carlym for the drywell lid. Please do the same for each Date: 1/20/2022 4:48:04 PM inlet shown on pg 22 of the drainage report(one Creation Date: 1/20/2022 4:43:49 PM trench drain, 3 8"area drains, and a 4"x4"fitting). File Name: 10.COMMENT_RESPONSE_Engineering.909 E Reference Civil Response above. Hopkins(905 Lot 2).2022.01.17.pdf Subject: Dev Rev Page: Provide easement for the transformer. Easement 11 cam_ Author: carlym area shall be 11'x18',with 3'of clearance on each side of the 5'x5'transformer and 10'of clearance Date: 1/28/2022 3:29:49 PM Creation Date: 1/20/2022 4:27:22 PM on the front. File Name: 10.COMMENT_RESPONSE_Engineering.909 E Reference Civil Response above. Per discussions with Ron Hopkins(905 Lot 2).2022.01.17.pdf Christian, Transformer relocated adjacent to alley, Easement not required. Reference Civil Sheets C1.0, Landscape Set, and Architectural Sheet A-001. Subject: Dev Rev Page: 1 Please include discussion of proposed curb in Author: carlym drainage report for 909 E Hopkins. Date: 1/20/2022 4:48:26 PM Reference Civil Response above. Creation Date: 1/20/2022 4:24:59 PM File Name: 10.COMMENT_RESPONSE_Engineering.909 E Hopkins(905 Lot 2).2022.01.17.pdf 2 (1) Subject: Dev Rev Provide spot elevations at the location where the _ Page: 2 overflow path will cross the sidewalk to ensure that Author: carlym drainage will successfully cross the sidewalk to Date: 1/28/2022 3:31:09 PM meet the curb and gutter. _ w Creation Date: 1/20/2022 4:29:56 PM File Name: 10.COMMENT_RESPONSE_Engineering.909 E Reference Civil Response above. Hopkins(905 Lot 2).2022.01.17.pdf RECEIVED 03/31/2022 ASPEN BUILDING DEPARTMENT