HomeMy WebLinkAboutFile Documents.909 E Hopkins Ave.0056-2021-BRES (13) DATE:03.15.2021 MASTER PERMIT: PERMIT NUMBER:
•
COMMUNITY DEVELOPMENT DEPARTMENT �Li
BUILDING PERMIT APPLICATION 4��
` CITY OF ASPE N
PROPERTY INFORMATION
ADDRESS 905 E Hopkins Ave. (Lo2)(Address Request to 909) UNIT# PARCEL ID# 273718206036
2 32 TRACT Mountain House Lot Split
LOT BLOCK OR SUBDIVISION
OWNER NAME Andy Fromm CELL 816-304-8001 EMAIL afromm@smg.com
BEST CONTACT Barrett Cyr CELL 970-948-0404 EMAIL barrett@cyrandcompany.com
NAME
PROJECT DETAILS (READ DEFINITIONS BELOW) THISSECTIONIMUSTBE
COMPLETED IN ITS ENTIRETY
1
DESCRIPTION OF
WORK IN DETAIL New Single-Family Residence with Hot Tub on vacant parcel.
PROJECT $4,107,992.53 Use of Building Class of Work Fixture Counts Important Review Triggers
VALUATION
❑ Commerical ❑■ New 7 Toilets,Bidets Major Engineering Review
SQFTOF ❑ Multi-Family 0 Addition 3 Bathtub •Projects involving less than 50%
BUILDING 4,542 SF ❑■ Single Family 0 Alteration 9 Lavatory(Wash Basin) hardscape area and work affecting
WORK AREA 0 Mixed-Use 0 Repair 5 Shower 75%or greater of unit sq ft
, Kitchen Sink(+Disposal) •Projects involving greater than
UNIT SQFT 4,985 SF 0 0 IFFR Dishwasher 50%hardscape area and work
LOT SIZE 0 Tenant Finish , Laundry Bar,Utility Sink affecting 50%or greater of unit
(SQ FT) 6,000 SF Will there be 0 Demolition
Clothes Washer sq ft
SC3FTOFSOIL 6,098 SF any roof/wall 0 Change Order a Floor Sink •Projects involving 1,000+sq ft of
DI TURBANCE penetrations? 0 4 Floor Drain soil disturbance area
❑■ Yes Water Heater(Pan Req)
NEW SQ FT 4,482 SF 0 No 2 #Gas Outlets Water Efficient Landscaping
Water Treatment •Projects that trigger a major
BUILDING 2,299 SF Other HOTTUB engineering review
FOOTPRINT NOTICE: This permit becomes null and void if work •Projects involving interior
or construction authorized is not commenced within
HARDSCAPE alterations affecting 50%or more
AREA 1,451 180 days,or if construction or work is suspended or
abandoned for a period of 180 days at any time after of exisiting gross square footage
ZONE R/MF, LP Overlay work is commenced.
DISTRICT •. i
Project Valuation:Cost of project as defined in Valuation Affadavit.
2 Sq Ft of Building Work Area:Total square footage of interior area undergoing change or reconfiguration.
O Unit Sq Ft:Gross square footage, not FAR,of permitted unit.
H Lot Size:Total surveyed square footage of property. APPROVALS
Sq Ft of Soil Disturbance: Exterior area of the lot where the ground is disturbed Reviewing Needs Reviewer Date
Z New Sq Ft:Total added square footage for additions to net livable or net leasable space. Department Review Sign-Off Approved
w Building Footprint:Grade floor square footage of the permitted structure. PC
0 Hardscape Area:Square footage of impervious lot surface.
Zone District:Underlying zone district of permitted parcel. Zoning
HPC
Building
SUBMITTAL FEES ISSUANCE FEES ISSUANCE FEES Fire
Building Building Engineering
Review Permit Fee Parks Impact
CMP
Engineering Zoning School Lands Water
Review Review(50%) Dedication Stormwater
Zoning CMP(50%) TDM Impact Sanitation
Review(50%)
Energy Code REMP Pedestrian Env. Health
Review Payment Amenity Parks
CMP(50%) GIS Housing Cash in Lieu Landscape
City
Use
Parks Review Tax Water Tap Efficiency
Approved
County Use To Issue
Utility Review Tax Sanitation
Issuance
( CITY OF ASPEN January v4/(Tl
130 S. GALENA ST ASPEN, CO 81611J