HomeMy WebLinkAboutFile Documents.909 E Hopkins Ave.0056-2021-BRES (15) 905 E Hopkins Lot 2 Aspen CO 81611 TBD
ADDRESS: p ( )� p PERMIT NUMBER:
COMMUNITY DEVELOPMENT DEPARTMENT
SCOPE OF WORK CHECKLIST CITY OFASPEN
•
LAND USE QUESTIONS
If you check any of the boxes below, please consult with the Planner of the Day(planneroftheday@gmail.com) before submitting your
permit application.
Does your permit involve any of the following? I New SF Res. on vacant lot.
• Part of an approved COA Land Use Review ❑ Work involves Landmark Parcel or Historic District
• Work affects net leasable, net livable, or ❑ Located in 100-year flood plain or within 100' of high
non-unit space water mark
❑ Work involves lot splitting or combining a lot ❑ Work involves changes in occupancy to structure
❑ Work involves exterior of structure Changes to elevator or stair configuration
❑ Changing the number of residential units Changes to the use of existing structure or space
• Changes to number or location of
onsite parking
ADDITIONAL SCOPE OF WORK QUESTIONS
Does your permit involve any of the following?
Exterior lighting added or changed ❑ Work involves exterior wall penetrations
❑ Work involves roof penetrations ❑ Work involves digging or excavation
Work adds, removes, or changes ❑ Work involves restaurant or food service
plumbing fixtures
❑ Disturbs 1,000 sq ft or more of soil within ❑ Affects parking spaces/meters, loading zones, or alleys
12 months
Work occurs in public right of way ❑ Adding structures or systems over utility lines
❑ Work affects trees or occurs within the ❑ Work within City Mall boundaries
dripline of a tree
•
RECEIVE
( CITY OF ASPEN
_August130 S. GALENA ST I ASPEN, CO/81611J
t l
BUILDING DEPARTMENT