Loading...
HomeMy WebLinkAboutFile Documents.975 King St.0089-2022-BCHO (6) 2015 IECC RESIDENTIAL RENEWABLE ENERGY MITIGATION PROGRAM CITY OF ASPEN VERSION 11,3 UPDATED DEC EMBER ,13, 2017 PROJECT ADDRESS: 975 King St,Aspen, CO 81611 Parcel ID#: 273707400023 Permit Number: 0089-2022-BCHO master permit 0043-2020-BRES CONTACT INFORMATION : Owner: Name: 975 King LLC City: Aspen Address: 623 East Hopkins Ave. State: CO Email: tiffany@aspenstarwood.com Zip Code: 81611 Phone: 970-901-7613 Cell Phone: Owner's Representative: Name: DJArchitects City: Aspen Address: 119 South Spring St 203 State: CO Email: brian@djarchitects.com Zip Code: 81611 Phone: 970-925-3444 Cell Phone: A. RESIDENTIAL RENEWABLE ENERGY MITIGATION PROGRAM Sheets showing snowmelt, pool,spa,and solar/GSHP information: M-001, M-603, M-121, M-122, M-123 Do you have snowmelt or a spa that has been exempted by the buiding official? 0 Yes(enter sqft below on the exempt QQ Hydro Snowmelt Electric Snowmelt Pool Spa Existing To be Demoed Existing to Remain 0.00 sqft 0.00 sqft 0.00 sqft 0.00 sqft New(non-exempt) 2757.00 sqft 81.00 sqft New(exempt) Total New 2757.00 sqft 0.00 sqft 0.00 sqft 81.00 sqft Total on site_ 2757.00 sqft 0.00 sqft 0.00 sqft 81.00 sqft Total Snowmelt on site 2757.00 sqft Boiler Efficiency 98.0% I 100% 75.0% 100.0% Mitigation Payment_ _ $95,651.02 $ - $ 14,256.00 Total Payment for Mitigation: $ 109,907.02 B. ON-SITE RENEWABLE CREDITS Supplemental System _ REMP Credit Use PV Worksheet Photovoltaic System $ 98,978.62 Use Thermal Worksheet Hot Water Panels $Use GSHP Cert Ground Source Heat Pump $ - Other Approved System $ - Total Mitigation Credits: $ 98,978.62 Onsite Renewable Offsets: How many Kilo Watts of PV(solar electric)would I need? 16.01 or How many square feet of SHW(solar hot water)would I need? 489.24 R-REMP Payment: $ 10,928.40 Amount Previously Paid on This Permit:I $ 101,511.10 TOTAL R-REMP PAYMENT: $ - Refund(includes minus$750): $ 89,832.70 C. PREPARED BY: Date: 12/6/2021 Print Name: Charles Langston Signature: Phone&EMail: 970-748-8520 charles@aec-vail.com REVIEWED: JH Date: 12/12/22 PV WORKSHEET CITY OF ASPEN VERSION 11,3 UPD I TED DECEMBER 13, 2017 PROJECT ADDRESS: 975 King St Parcel ID#: 273707400023 Permit Number: 0089-2022-BCHO master permit 0043-2020-BRES Collector Solar Aspect, Collector Tilt, Orientation Degress from Degrees From Adjustment DC side capacity Inverter capacity kW for kW Mitigation True South Horizontal Factor (kW) (kW) credit Credit Collector Group 1 44.7 5 91.80% 18 15.705 15.705 14.42 kW Collector Group 2 87.00% 0 0.00 kW Collector Group 3 87.00% 0 0.00 kW Collector Group 4 87.00% 0 0.00 kW Collector Group 5 87.00% 0 0.00 kW Collector Group 6 87.00% 0 0.00 kW Collector Group 7 87.00% 0 0.00 kW Collector Group 8 87.00% 0 0.00 kW Collector Group 9 87.00% 0 0.00 kW Collector Group 10 87.00% 0 0.00 kW Collector Group 11 87.00% 0 0.00 kW Collector Group 12 87.00% 0 0.00 kW Collector Group 13 87.00% 0 0.00 kW Collector Group 14 87.00% 0 0.00 kW Collector Group 15 87.00% 0 0.00 kW Collector Group 16 87.00% 0 0.00 kW Collector Group 17 87.00% 0 0.00 kW Collector Group 18 87.00% 0 0.00 kW Collector Group 19 87.00% 0 0.00 kW Collector Group 20 87.00% 0 0.00 kW Total: 14.42 kW $Mitigation Credit: $ 98,978.62 Instructions: 1) Determine how many collector groups you have.Groups are used to differentiate between collectors (panels)with different tilts,aspects,sizing,or inverters.If all your collectors are installed similarily,you might have just one group. 2) Enter the aspect and tilt for each group.The solar orientation adjustment factor is automatically calculated. 3) DC side capacity is the total labled panel output kW in a group. 4) Inverter capacity is the recommended input power in kW of your inverter(s). 5)You will be given credit for the lesser of the labeled panel output or the inverter. 6)The kW for credit is multiplied by the solar orientation adjustment factor to get kW mitigation credit. 7)The kW mitigation credit is totalled and multiplied by$6865.32/kW to get the$Mitigation Credit 8)The mitigation credit will be automatically entered into your RREMP or CREMP form. If your project has both RREMP and CREMP,it will automatically divide the credits up,with priority given to mitigating the CREMP payment. PREPARED BY: Date: 12/6/2021 Print Name: Charles Langston Signature: "--` —- Phone&EMail: 970-748-8520 charles@aec-vail.com REVIEWED: Date: