HomeMy WebLinkAboutFile Documents.1012 E Cooper Ave.0102-2021-BRES (12) 2015 IECC COMMERCIAL RENEWABLE ENERGY MITIGATION PROGRAM
CITY OF ASPEN VERSION 11.5 UPDATED MAY 1,1 2021
PROJECT ADDRESS: 1012 E COOPER AVE., UNIT 5
Parcel ID#: 273718232022 Permit Number:
CONTACT INFORMATION :
Owner:
Name: STEPHEN ABELMAN City: ST PETERSBURG
Address: 400 BAY LAUREL CT NE State: FL
Email: abelman56@gmail.com Zip Code: 33703
Phone: (727)644-5139 Cell Phone:
Owner's Representative:
Name: FLYNN STEWART-SEVERY,AIA City: SMV
Address: 15 KEARNS RD., STE D. State: CO
Email: FLYNN@FANDMARCHITECTS.COM Zip Code: 81615
Phone: (970)319-4407 Cell Phone:
A. COMMERCIAL RENEWABLE ENERGY MITIGATION PROGRAM
Sheets showing snowmelt, pool,spa,and solar/GSHP information: N/A
Do you have snowmelt or a spa that has been exempted by the buiding official? 0 Yes(enter sqft below on the exempt row) •No
Hydro Snowmelt Electric Snowmelt Pool Spa
Existing
To be Demoed
Existing to Remain 0.00 sqft 0.00 sqft 0.00 sqft 0.00 sqft
New(non-exempt)
New(exempt)
Total New 0.00 sqft 0.00 sqft r 0.00 sqft 0.00 sqft
Total on site 0.00 sqft 0.00 sqft —
0.00 sqft 0.00 sqft
Total Snowmelt on site 0.00 sqft
Boiler Efficiency 75.0% I 100% 75.0% 75.0%
Mitigation Payment $0.00 $ - $ -
Total Payment for Mitigation: $0.00
B. ON-SITE RENEWABLE CREDITS
Supplemental System REMP Credit
Use PV Worksheet Photovoltaic System $Use Thermal Worksheet Hot Water Panels $ -
Use GSHP Cert Ground Source Heat Pump $ -
Other Approved System $ -
Total Mitigation Credits: $ -
Onsite Renewable Offsets: How many KiloWatts of PV(solar electric)would I need? 0.00
or How many square feet of SHW(solar hot water)would I need? 0.00
C-REMP Payment: $ -
Amount Previously Paid on This Permit:I $ -
I TOTAL C-REMP PAYMENT: $ -
Refund: $ -
C. PREPARED BY: Date: 6/8/21
Print Name: FLYNN S.STEWART-SEVERY
Signature: .,
Phone&EMail: (970)319-4407 FLYNN@FANDMARCHITECTS.COM
REVIEWED: Date:
JI R
[fo4/12/2o229ECEIVDE 9 07/20/2021
FORODIXCUIRIA CE ASPEN
limp BUILDING DEPARTMENT