HomeMy WebLinkAboutFile Documents.909 E Hopkins Ave.0056-2021-BRES (39) 2015/ECC RESIDENTIAL RENEWABLE ENERGY MIT/GAMITIGATION PROGRAM
City of Aspen Version 11.3 Updated December 13, 2017
PROJECT ADDRESS: 905 E Hopkins (Lot 2), Aspen CO 81611
Parcel ID#: 273718206036 Permit Number: TBD
CONTACT INFORMATION :
Owner:
Name: Andy Fromm City: Mission Hills
Address: 5601 High Drive State: KS
Email: afromm@smg.com Zip Code: 66208
Phone: 316-304-8001 Cell Phone: 816-304-8001
Owner's Representative:
Name: Z-Group Architects, P.C. -Randall J. Henrie(Randy) City: Aspen
Address: 411 East Main, Suite 205 State: CO
Email: randy@zgrouparchitects.com Zip Code: 81611
Phone: 970-925-1832 Cell Phone: 970-355-9773
A. RESIDENTIAL RENEWABLE ENERGY MITIGATION PROGRAM
Sheets showing snowmelt, pool, spa, and solar/GSHP information: A-002 REMP PLAN, A-103 UPPER LEVEL PLAN, A-104 ROOF
Do you have snowmelt or a spa that has been exempted by the buiding official? 0 Yes(enter sqft below on the exempt row) 0 No
Hydro Snowmelt Electric Snowmelt Pool Spa
Existing
To be Demoed
Existing to Remain 0.00 sqft 0.00 sqft 0.00 sqft 0.00 sqft
New(non-exempt) 1493.00 sqft 49.00 sqft
New(exempt) 0.00 sqft
Total New_ 1493.00 sqft _ 0.00 sqft 0.00 sqft 49.00 sqft J
Total on site 1493.00 sqft 0.00 sqft 0.00 sqft 49.00 sqft
Total Snowmelt on site 1493.00 sqft
Boiler Efficiency 98.0% 100% 75.0% 100.0%
Mitigation Payment $51,797.96 $ - $ 8,624.00
Total Payment for Mitigation: $ 60,421.96
B. ON-SITE RENEWABLE CREDITS
Supplemental System REMP Credit
Use PV Worksheet Photovoltaic System $ 86,247.64
Use Thermal Worksheet Hot Water Panels $Use GSHP Cert Ground Source Heat Pump $ -
Other Approved System $ -
Total Mitigation Credits: $ 86,247.64
Onsite Renewable Offsets: How many Kilo Watts of PV(solar electric)would I need? 8.80
or How many square feet of SHW(solar hot water)would I need? 268.96
R-REMP Payment: $ -
Amount Previously Paid on This Permit:I
I TOTAL R-REMP PAYMENT: $ -
Refund (includes minus$750): $C. PREPARED BY: Date: 03.16.2021
Print Name: Randall J. Henrie
274-44-0
Signature: Randall J. Hen .?" / r
Phone& EMail: 970-355-9773 randy@zgrouparchitects.com
REVIEWED: Date: RECEIVED
04/01/2021
ASPEN
BUILDING DEPARTMENT
PV WORKSHEET
City of Aspen Version 11.3 Updated December 13, 2017
PROJECT ADDRESS: 905 E. Hopkins St., Aspen, CO
Parcel ID#: 273718206036 Permit Number: TBD
Collector Solar
Aspect, Collector Tilt, Orientation
Degress from Degrees From Adjustment DC side capacity Inverter capacity kW for kW Mitigation
True South Horizontal Factor (kW) (kW) credit Credit
Collector Group 1 165 4.75 87.00% 4.94 4.94 4.94 4.30 kW
Collector Group 2 15 4.75 87.00% 3.04 3.04 3.04 2.64 kW
Collector Group 3 165 4.75 87.00% 6.46 6.46 6.46 5.62 kW
Collector Group 4 87.00% _ 0 0.00 kW
Collector Group 5 87.00% _ 0 0.00 kW
Collector Group 6 87.00% 0 0.00 kW
Collector Group 7 87.00% 0 0.00 kW
Collector Group 8 87.00% 0 0.00 kW
Collector Group 9 87.00% 0 0.00 kW
Collector Group 10 87.00% 0 0.00 kW
Collector Group 11 87.00% 0 0.00 kW
Collector Group 12 87.00% 0 0.00 kW
Collector Group 13 87.00% 0 0.00 kW
Collector Group 14 87.00% 0 0.00 kW
Collector Group 15 87.00% 0 0.00 kW
Collector Group 16 87.00% 0 0.00 kW
Collector Group 17 87.00% 0 0.00 kW
Collector Group 18 87.00% 0 0.00 kW
Collector Group 19 87.00% 0 0.00 kW
Collector Group 20 87.00% 0 0.00 kW
Total: 12.56 kW
$ Mitigation Credit: $ 86,247.64
Instructions:
1) Determine how many collector groups you have. Groups are used to differentiate between collectors
(panels)with different tilts, aspects, sizing, or inverters. If all your collectors are installed similarily, you
might have just one group.
2) Enter the aspect and tilt for each group. The solar orientation adjustment factor is automatically
calculated.
3) DC side capacity is the total labled panel output kW in a group.
4) Inverter capacity is the recommended input power in kW of your inverter(s).
5) You will be given credit for the lesser of the labeled panel output or the inverter.
6) The kW for credit is multiplied by the solar orientation adjustment factor to get kW mitigation credit.
7) The kW mitigation credit is totalled and multiplied by$6865.32/kW to get the $ Mitigation Credit
8) The mitigation credit will be automatically entered into your RREMP or CREMP form. If your project has both RREMP and
CREMP, it will automatically divide the credits up, with priority given to mitigating the CREMP payment.
PREPARED BY: Date: 3/16/2021
Print Name: Greg Peterson
Signature: Greg K Peterson
Phone& EMail: 970.963.1420; greg@sunsensesolar.com
REVIEWED: Date:
RECEIVED
04/01/2021
ASPEN
BUILDING DEPARTMENT