Loading...
HomeMy WebLinkAboutFile Documents.332 Vine St.0131-2022-BRES (9)332 Vine –Narrative of work to be done Removing •Existing carpet and tile throughout •Kitchen cabinets, countertops and appliances •Bathroom fixtures •Popcorn ceiling removal (no asbestos per testing) •Kitchen soffit Installing •Installing new kitchen cabinets, countertops and appliances •Installing new bathroom fixtures •Installing new LVP (luxury vinyl plank) flooring w/ sound deadening cork backing •Installing new tile in baths •New washer / dryer per HOA guidelines •New paint (ceiling, walls, and doors) 12/07/202201/23/2023 sami