Loading...
HomeMy WebLinkAboutFile Documents.1405 Red Butte Dr.0019-2022-BRES (4)Zoning-1-1405 Red Butte Drive-0019-2022-BRES Subject: Cloud+ Page: A2.01 Page Index: 3 Author: kylas Color: File Name: 90.Architectural Plans.20211217.pdf Is this an existing window being converted to a door? If so, please provide estimated demo calculation % for the fenestration expansion. Please see Sec. 26.575.020 (h) 90.Architectural Plans.20211217.pdf (3) Subject: Cloud+ Page: A2.22 Page Index: 10 Author: kylas Color: File Name: 90.Architectural Plans.20211217.pdf Is this a new exterior penetration? Need exterior estimated demo calculation % if new. See Sec. 26.575.020 (h) Subject: Cloud+ Page: A4.01 Page Index: 12 Author: kylas Color: File Name: 90.Architectural Plans.20211217.pdf Is this a new exterior penetration for the range vent? Need exterior demo calculations if new. See Sec. 26.575.020 (h) D W 1 2 C D 8'-2"10'-2"5'-0"7'-2 1/2" 4'- 0 " 3'-0" WH FURN BEDROOM LOWER BATHLAUNDRY SK I S SH E L V I N G MECH Is this an existing window being converted to a door? If so, please provide estimated demo calculation % for the fenestration expansion. Please see Sec. 26.575.020 (h) DN A4.01 31 A5.02 2 1 A5.01 3 4 6 KITCHEN 202MASTER BATH 205 STER SSING 206 REF STOR SHELVES FL U E S B B A B B VENT 390 CFM HOOD TO OUTSIDE WALL EXHAUST TO OPERABLE WINDOW 5'-10" 06A 205A 202A SCALE:A2.22 1/4" = 1'-0" 1 PROPOSED - UPPER LE Is this a new exterior penetration? Need exterior estimated demo calculation % if new. See Sec. 26.575.020 (h) LEVEL 1 100'-0" T.O. PLY LEVEL 2108'-10 1/2" T.O. PLY ROOF LEVEL118'-8 1/4" TO. JOIST OPEN TO BEYOND EGRESS EGRESS B A B B B B /1405 Red Butte/2126_1405 Red Butte_Phase 1.rvt SCALE:A4.01 1/4" = 1'-0" 3 SOUTH ELEVATION A Is this a new exterior penetration for the range vent? Need exterior demo calculations if new. See Sec. 26.575.020 (h) BMA Response: Demo areas have been added to the elevation drawings as hatched areas. Calculations have been added to the titleblock of A4.01. BMA Response: Demo areas have been added to the elevation drawings as hatched areas. Calculations have been added to the titleblock of A4.01. BMA Response: Demo areas have been added to the elevation drawings as hatched areas. Calculations have been added to the titleblock of A4.01. 05/20/2022