Loading...
HomeMy WebLinkAboutFile Documents.342 Summit St.0001-2023-BROF (12)SMOKE ALARMS AND CARBON MONOXIDE DETECTORS REQUIRED THROUGHOUT DWELLING UNIT PER CITY OF ASPEN MUNICIPAL CODE 8.15 These plans must be kept at the building site or inspection delays may occur. Construction shall conform to these plans. All changes shall be approved by the building official. Field Plan Set Must Be Printed In Color SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, MECHANICAL, OR FIRE SPRINKLER WORK It should be known that this review shall not relieve the applicant of their responsibility to comply with the requirements of the City of Aspen Municipal Code. Pursuant to Sec.26.104.050, any permit or approval issued in error or otherwise not in conformity with the requirements of this Title, shall be void. Similarly, any permit or approval issued in reliance upon or as a result of, a materially false statement or representation made in the process of obtaining the permit or development approval shall, likewise, be void. Any person having received a void or voidable permit or approval shall not be relieved from having to comply with all applicable terms and conditions of this Title and the City shall not be estopped from fully enforcing same. Proposed TPO Re Roofing 2200S.F. hardscape landscaping landscaping replace gutter 12/30/2022 SUMMIT STREET CONDOS GARAGE DETAIL DENSDECK TPO FLASHING CAP 12/30/2022 Flat roof - no snow stops required Heat trace/tape must be self-regulating type cable and must include automatic controls and timer capable of turning off the system when the outdoor temperature is above 50 degrees and during daylight hours. 12/30/2022 01/03/2023 linzhid 0001-2023-BROF SUMMIT PLACE CONDOS 342 SUMMIT ST 273718287801