Loading...
HomeMy WebLinkAboutagenda.council.worksession.20260504AGENDA CITY COUNCIL WORK SESSION May 4, 2026 4:00 PM, City Council Chambers 427 Rio Grande Place, Aspen I.Work Session I.A Board and Commission Interviews I.B Armory Hall Adaptive Reuse - Project Update I.C Golf Clubhouse Area/Facilities Master Plan - Data Sharing and Update II.Council questions and comments related to items published in the most recent information update, as needed Zoom Meeting Instructions Join from PC, Mac, iPad, or Android: https://us06web.zoom.us/j/86570131266?pwd=xQ4VlDr68KKFnVlG3Aalot7LrFINDW.1 Passcode:81611 Join via audio: +1 346 248 7799 US Webinar ID: 865 7013 1266 Passcode: 81611 International numbers available: https://us06web.zoom.us/u/kepFHsTJl5 Board & Commission Interviews Memo - 5.4.26.pdf 1_2026.05.04_Work sesson memo_Armory_Hall_Final.docx Golf_Clubhouse_Facilities_Master_Plan_Update_Staff_Report_final.docx Attachment A Public Involvement Feedback Summary - PHASE I CITY COUNCIL.pdf Attachment B Golf Data Survey Results.pdf Attachment C Golf MP 2026-04-22 Open House Collage.pdf 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 Page 1 of 4 STAFF REPORT TO: Mayor Richards and Aspen City Council FROM: Jen Phelan, Development Manager and Ben Levenson, Senior Project Manager THROUGH: Rob Schober, Capital Asset Director MEETING DATE: May 4, 2026 SUBJECT: Armory Hall Adaptive Reuse – Project Update INTENDED OUTCOME: Staff is updating City Council, as project owner, on the continued pre- construction progress for the adaptive reuse of Armory Hall which is a priority project for Council. Staff’s intent is to inform council on where the project stands as well as outlining next steps and the planned timeline for getting the construction phase of the project underway. EXECUTIVE SUMMARY: As part of a 2025 competitive bid process, Shaw Construction was selected as the Construction Manager/Contractor at Risk to provide preconstruction services. Shaw has since been included in weekly meetings with the design team and is informing decisions based on constructability and revised cost estimates. In January 2026, City Council approved Resolution No. 7 (Series of 2026), authorizing Shaw to engage additional subconsultants to complete engineering for the building lift of Armory Hall, temporary shoring design, and structural bracing for selective demolition after the lift. This work facilitates installation of a new foundation along the building perimeter, increased basement head height, and demolition of the interior and specific portions of the exterior. To date, the building lift engineering and shoring design are complete, and the structural bracing system design is in progress. Lifting the building is classified as a relocation by the land use code. The project is scheduled for review by the Historic Preservation Commission on May 13 to consider the lift request, finalize stage structure materials, and review design modifications to the Galena Street parkway. Figure 1: Courtesy of The Aspen Historical Society 93 Page 2 of 4 Asset staff have received an initial Guaranteed Maximum Price (GMP) proposal from Shaw for construction. This proposal is currently under review and will be finalized over the coming month. The GMP proposal, along with two additional contracts, are expected to be presented to Council in early summer. In parallel, initial permit review comments have been received; vacating of the Armory remains on schedule; the required IT work at the Armory is underway; asbestos remediation is being planned; and a request for proposals (RFP) for a building operator is in preparation. DISCUSSION: The project team is advancing multiple tasks to prepare for the construction of Armory Hall. Key activities currently underway are summarized below: Building Lift and HPC Review: The existing unreinforced sandstone foundation requires replacement to accommodate basement expansion, comply with current seismic and building code requirements, and support the building’s updated occupancy classification. The Historic Preservation Commission is reviewing the proposed method for installing a new foundation as it is considered a relocation under the land use code. The project team has conducted a comprehensive, multidisciplinary, evaluation of available construction methodologies for installing a new foundation. Based on this analysis, lifting the structure has been determined to be the most appropriate and effective approach. This method minimizes the risk of undermining the existing exterior walls, reduces the potential for structural failure within potentially compromised brick wythes, and maintains the building’s established vertical load paths throughout construction. Additionally, lifting enables the installation of a continuous, monolithic cast-in- place concrete foundation, which provides superior long-term structural performance compared to segmented alternatives with multiple cold joints. Lifting the building also provides a greater level of safety for construction workers, simplifies increasing basement depth, and reduces the overall project duration relative to the alternative approach of underpinning and phased excavation methods. A shorter construction timeline will lessen disruptions to adjacent properties, the commercial core, the public right-of-way, the WeCycle station, and the Aspen Saturday Market supporting broader public welfare considerations. As a publicly funded project, fiscal responsibility is a priority for Asset staff. The reduced construction duration associated with lifting the structure results in measurable cost Figure 2: Courtesy of The Aspen Historical Society 94 Page 3 of 4 savings for a publicly funded project while delivering a higher-quality outcome. Although lifting a historic brick structure is a new approach for a downtown building, the City has retained a nationally recognized firm with specialized expertise (Wolfe House & Building Movers) in structural lifting to perform this work and feels confident in the abilities of the team we have assembled. Upcoming Contracts For Council Approval: Asset staff are currently reviewing a Guaranteed Maximum Price (GMP) proposal from Shaw Construction for the project. As it currently stands, the proposal value remains within the budget created and presented to Council at the end of last year. Once the review is complete and the proposal is finalized it will be presented to Council for consideration and approval. Staff are targeting a regular meeting in early June for this agenda item. During the same meeting two additional contract amendments will also be presented for approval. These amendments will include construction administration for CCY Architects and its project team and authorize additional project phases of construction and closeout of the Construction Manager as Advisor (CMa). Building Permit: CCY Architects has received most first round comments (as of April 24th) from the building department and referral agencies related to the building permit application. Comments are being sent to the appropriate design consultants to provide a response and will be resubmitted as one package to the building department. Based upon discussions with the Community Development department, Asset staff anticipate the permit being issued in phases. Vacating of the Armory & Project Readiness: In early May, right-of-way work will commence allowing the fiber service into the building to be capped. Departments currently housed in Armory Hall are expected to vacate the building in June. As the building is vacated, IT systems and equipment will be disconnected and relocated, remaining miscellaneous items will be removed, and minor asbestos remediation will be completed to prepare the building for construction. The current project schedule has Shaw taking control of the site in late June. Operator RFP: Since an initial operator RFQ was issued in late 2025, Asset staff have provided updates to interested parties every two months. The team plans on issuing the operator RFP once a firm construction start date and project timeline are established, as greater project certainty will improve the quality and reliability of responses from potential operators. We are anticipating a July issuance of the RFP at this time. FINANCIAL IMPACTS: The total budget appropriated for this project in 2026 is just over $15 million dollars, allowing for construction to begin in 2026. ENVIRONMENTAL IMPACTS: The design and engineering work associated with this project has minimal direct environmental impact. While construction activities can generate environmental impacts, the rehabilitation approach reduces overall impacts by preserving and reusing the existing structure. 95 Page 4 of 4 The project is being designed as an all-electric facility and will incorporate upgrades to meet current building codes, improving overall energy efficiency and long-term performance. These measures support the objectives of the Climate Action Plan and align with Council’s carbon reduction goals. This project will adhere to the City of Aspen Construction & Demolition Debris Program. The waste management plan will be designed to minimize the volume of waste directed to the Pitkin County Landfill while maximizing material diversion through recycling. In addition, lifting the building is expected to shorten the construction timeline, thereby reducing the duration of impacts to the surrounding commercial core. RECOMMENDATIONS: Asset staff have evaluated input from Wolfe, ANA, and other relevant trades to determine the best approach for installing a new foundation and deepening the basement for additional head height. HPC will review the relocation in mid May and provided the project receives a recommendation of approval from HPC, staff will be in front of council in early June with multiple contracts to advance the project to the construction stage. Staff would like to confirm with Council the current outlined activities and project schedule as we continue to advance this priority project. ALTERNATIVES: City Council may direct staff to pause the project and reevaluate the current approach. CITY MANAGER COMMENTS:____________________________________________ ______________________________________________________________________ ______________________________________________________________________ 96 STAFF REPORT TO: Mayor and City Council FROM: Jim Pratt, Golf Manager Scott Chism, Director of Business Services THROUGH: Austin Weiss, Parks and Recreation Director MEETING DATE: May 4th, 2026 SUBJECT: Golf Clubhouse Area Master Plan – Data Sharing and Update __________________________________________________________________ INTENDED OUTCOME: The Golf Department and Business Services Division are providing Council with an update on the Golf Clubhouse Area Master Plan with the intent to receive further direction from Council relative to scale of Master Plan recommendations. Master Plan pathways forward for Council to consider include:  Update (no increase in size, focus on repairs and retain functionality as-is)  Upgrade (modernize to meet today’s needs and add some new amenities)  Reimagine (extensive redevelopment, considers new opportunities and anticipates growth) Additionally, staff requests Council’s guidance/interest regarding potential employee housing initiatives at the Golf Clubhouse area. These decisions will guide the project team in planning, designing, and budgeting for the scale of Master Plan recommendations. EXECUTIVE SUMMARY: In 2025, the City hired Sirius Golf Advisors, a golf industry consulting firm, to update the Golf Business Plan, offering insight and identifying improved business opportunities for the facility. In 2026, the City is collaborating with the planning and design consultant, DTJ Design, who is working to develop the Golf Clubhouse Area Master Plan, which includes insights from recent community surveys, stakeholder meetings and engagement sessions. The scope of this Master Plan includes all lease holder zones including, the Nordic center, Tennis facilities and the restaurant. Recommendations from two community meetings and an online community survey have provided valuable user group perspectives that are being used to guide the Master Plan recommendations. 97 DISCUSSION: The Aspen Clubhouse Area has seen a significant increase in its year- round usage since its construction in 2002. Specifically, during the busiest summer months, the Aspen Golf Clubhouse area can see daily usage of close to 1,000 people per day. To initiate future planning recommendations of the Master Plan, an extensive information gathering campaign has been underway since 2025. Public input to date has been gathered through four primary sources. Ongoing staff input has been informed by daily operational experience and regular feedback from facility users. Current facility shortcomings contribute to significant operational challenges. Stakeholder meetings have been conducted with City of Aspen department heads and staff, leaseholders representing tennis, Nordic, and restaurant operations, as well as the Aspen Golf Advisory Committee through feedback sessions and discussions. A digital community survey was conducted throughout the month of March to collect broader public perspectives and priorities. On April 22, a public open house was held at the Golf Clubhouse to gain additional community input. A detailed summary of public input received to date is attached (attachments A and B). Consistent themes emerged from stakeholder groups around inclusivity, expanded year- round activation, and stronger community connection. Users identified the following outcomes to be included in the Master Plan:  Design a campus that allows for additional year-round uses to encourage community gathering;  Create modern and more functional facilities including flexible interior spaces;  Expand tennis facility to include indoor racquet programming;  Preserve what makes the place special, including affordability, open space quality and public accessibility;  Make it work operationally, including adequate work, mechanical, retail, and storage spaces;  Improve revenue generating/business opportunities; Usage at the Aspen Golf Clubhouse Area has steadily increased, since the current facilities were completed in 2002. The facility is challenged to provide fundamental necessities like proper number of restroom facilities, operational storage needs, public spaces, and staff work areas. Additionally, there is an opportunity to look at the facility’s character and consider how it aligns with the community’s expectations regarding quality and services offered. 98 The Aspen Golf Club campus is comprised of different areas besides the Golf clubhouse, and each area has unique challenges. The Master Plan is evaluating how each area can be designed to improve flow and bolster operations on the campus for operational efficiencies and positive user experience for all user groups in the future. Under the current configuration, areas can feel disconnected and many functions are challenged due to inadequate space. Moreover, survey responses show that the community feels the building feels dated and inefficient. The top facility priorities for community use include:  Expand restaurant/bar/social space  Improve golf practice facilities  Create more outdoor gathering space with sunset views  Create indoor racquet facility  Protect open space character In the current configuration of uses in golf clubhouse area, there are multiple operational challenges currently impeding staff and user groups from optimal experiences. DTJ Design’s recent meetings with stakeholders including Golf department staff, lease holders, and staff from Parks, Trails & Open Space, Nordic, and Recreation departments concluded that the following facility operational requirements be considered in the Master Plan:  Separate pro shops for Golf and Nordic  Improve offices & meeting areas  Expand restaurant, kitchen, & storage  Build indoor racquet facilities  Improve and increase golf cart storage capacity 99  Improve golf practice areas  Expand/increase parking capacity The first phase of the Golf Clubhouse Area Master Plan effort has included a comprehensive evaluation of current conditions and user experiences. The next phase of work will synthesize the public, stakeholder and City Council input into recommendations for both short-term and longer-term planning and design solutions for the Aspen Golf Clubhouse area’s future. RECOMMENDATIONS: The current conditions at the Aspen Golf Club are not optimal and could be improved. Opportunity exists at the golf clubhouse and campus area to improve operations and respond to community feedback. Staff are seeking City Council’s direction regarding scale of Master Plan recommendations - should the Aspen Golf Club be:  Updated: Repaired as is, without any upgrades;  Upgraded: Repaired and modernized to accommodate present needs with expansions for some additional amenities; or  Reimagined: Redesigned with replaced facilities to meet future needs, implement additional revenue generating potential; The City Council's guidance will inform the project team in the design and development of the Master Plan and also shape future decisions regarding capital planning, resource allocation, and departmental staffing. This process aims to ensure that Aspen Golf Club remains committed to offering affordable and accessible recreational opportunities for the community year-round. CITY MANAGER COMMENTS: I would add to the Council’s consideration the large funding question that would need to be addressed before making a strong recommendation for any direction. Whether or not the Golf Fund would be responsible, or if the Parks and Open Space Fund is considered for supporting future development at this site, and/or if there are private donors that would be able to help advance any improvements still needs to be explored. If the predominate source of financing would be from the Parks and Open Space Fund, there may need to be a prioritization discussion to determine how any future redevelopment at the golf course campus is viewed relative to other capital needs supported by this fund, or whether a ballot question would need to be considered by voters. Additionally, acknowledging the current state of development within the UGB, Council may likely also want to consider the amount of additional construction and disruption for the Community that a redevelopment of the campus would generate and how to time such a project. 100 Given there are a number of variables like these that are not fully explored or outlined within this summarized write-up, Council input tonight might be most appropriately accompanied with caveats to reflect how certain any provided direction may be. Or Council may want to propose additional questions back to staff and request a follow up work session to discuss this topic further with that additional context, once it is avaiable. ATTACHMENTS: Attachment A – Public Survey Feedback Summary results—Aspen Golf Club Facilities Master Plan Attachment B – Golf Master Plan Survey Data Results Attachment C – April 22, 2026 Golf Master Plan Open House Collage 101 1 Public Involvement Feedback Summary Phase I Discovery and Listening November 2025 – April 2026 Public input to date has been gathered through four primary sources. First, ongoing staff input has been informed by daily operational experience and regular feedback from facility users. Second, initial stakeholder meetings were conducted with City of Aspen department heads and staff, leaseholders representing tennis, Nordic, and restaurant operations, as well as the Aspen Golf Advisory Committee through feedback sessions and discussions. Third, a community survey was conducted throughout the month of March to collect broader public perspectives and priorities. Finally, additional community input was received during the public open house held on April 22. Initial Stakeholder Meetings The Aspen Golf Club Facilities Master Plan is being studied now because the existing clubhouse and campus no longer function efficiently for the volume and diversity of users it serves. What was once primarily a seasonal golf facility evolved into a multi-use community campus supporting golf, Nordic skiing, tennis, dining, events, recreation, and year-round public use. The infrastructure is aging, circulation and flow are limited, storage and gathering spaces are inadequate, and several user groups lack basic amenities such as restrooms, shelter, modern lockers, and dedicated program space. At the same time, the site represents one of Aspen’s most visible gateways and public assets, creating an opportunity to think beyond short- term fixes and establish a long-range framework for future investment over the next 25 -30 years. The community’s direction is clear: protect the open space, preserve affordability and accessibility, and create a welcoming facility that better serves all users, generations, incomes, and recreational interests. Improve what we have, but don’t change what it is. Across stakeholder groups, consistent themes emerged around inclusivity, year-round activation, and stronger community connection. Residents and users want a campus that functions like a social gathering place—with improved food and beverage spaces, sunny outdoor decks and patios, better parking, safer and more accessible circulation, and flexible indoor spaces for meetings, events, youth programs, and daily use. Recreation priorities include indoor tennis, improved golf facilities, Nordic gathering and storage space, improved pro shop functionality, and better support spaced for camps and training programs. There is also interest in exploring employee housing, transportation connections, and ways to make the facility work more cohesively as one campus rather than disconnected uses. Attachment A 102 2 Moving forward, the master plan process should help the community understand current challenges, identify future needs, and create a practical roadmap for phased improvements that strengthen Aspen’s recreation system while preserving what already works. Digital Survey – Aspen Community Voice The Aspen Golf Club Facilities Master Plan survey generated strong community participation, with 534 responses and broad representation led primarily by Aspen residents (64%), followed by Snowmass Village, Basalt, and surrounding valley communities. Results confirm the Golf Club is already a heavily utilized and valued public asset, with 92% of respondents reporting use of the facilities in the last 12 months. While golf remains a core draw (65%), the strongest overall use category was the restaurant and bar (72%), followed by Nordic skiing (46%), walking (35%), and tennis (23%). Satisfaction with the current experience is generally positive, with two-thirds rating the facility a 4 or 5 out of 5, but the data also suggests room for meaningful improvement as one quarter rated the experience average and smaller groups rated it below satisfactory. Most notably, respondents overwhelmingly view the campus as more than a golf course—76% rated it important or very important that the Aspen Golf Club function as a year-round community gathering place. When asked about future priorities, respondents favored practical enhancements that strengthen daily use, year-round activation, and community experience over formal event uses. Top-ranked priorities included an expanded restaurant and bar, improved golf practice facilities, more outdoor gathering space with sunset views, indoor tennis, and improved golf spaces. Lower priorities included banquet facilities and meeting rooms, indicating the public prefers amenities that serve regular users over occasional programmed events. Sustainability expectations were also clear and consistent, with the highest support for healthy indoor spaces, water efficiency, responsible landscaping, renewable energy, and environmentally responsible operations. Taken together, the survey shows the community wants a modernized, multi-use social recreation campus that respects Aspen’s environmental values while improving comfort, functionality, and year-round relevance. 103 3 Open House Feedback The open house provided the project team with an opportunity to lead tours of the facility, including operational back-of-house and mechanical areas. These tours helped participants better understand the existing building conditions, operational constraints, and challenges with current spaces. A 30-minute community meeting was also held to provide an overview of the master planning process, project goals, and next steps. Participants asked thoughtful and constructive questions, creating a valuable opportunity to establish a shared baseline of project information. The meeting also helped validate and reinforce themes already identified through the community survey and earlier stakeholder outreach, while generating additional feedback for the planning team to consider moving forward. Aspen Golf Club Facilities Master Plan – Program Summary – Based on current feedback and defined user groups. User Groups Golf • Golf Proshop • Golf Pro Office • Golf Proshop Storage • Golf Management Staff Offices • Golf Storage • Men’s Locker Room • Women’s Locker Room • Cart Barn • Golf Simulator Nordic • Nordic Proshop • Nordic Ski Tune / Wax • Nordic Storage Tennis • Indoor Tennis Courts (6) • Tennis Proshop • Tennis Lounge (Social Space) • Tennis Storage 104 4 • Tennis Offices • Men’s Restroom • Women’s Restroom • Pickleball (?) • Padel (?) Restaurant • Restaurant / Bar • Dining Patio (Covered) • Commercial Kitchen • Kitchen Storage • Men’s Restroom • Women’s Restroom General • Circulation o Lobby / Foyer o Horizontal Circulation o Vertical Circulation (Stairs + Elevator) • Mechanical SEE IMAGES EXHIBITS 105 SURVEY RESPONDENTS SURVEY RESULTS responses received FEEDBACK -Facility is outdated, inefficient and disconnected -Community-building location -Affordability and accessibility -Multi-user facility (golf, tennis, Nordic, public) -Protect open space -Plan for the next 50 years TOP THEMES - A Year-Round Community Campus -Modern, Functional Facilities -Spaces that Bring People Together -Expand Year-Round Recreation • Indoor racquet facility - Preserve What Makes This Place Special •Maintain affordability and access • Protect open space and character -Make it Work Operationally •Support staff spaces, storage and operations • Improve revenue generating uses TOP PRIORITIES -Expanded restaurant / social space -Improved golf practice facilities -Outdoor gathering space -Indoor tennis facility 534 Aspen locals 64% used the facility in the past year 92% MAJOR THEMES Attachment B 106 DATA FROM SURVEY RESULTS RECURRING COMMENTS • Tired, Cramped, Dated, Too Small • Flow is bad • Locker rooms inadequate • Restaurant undersized The Aspen Golf Club facility and campus needs improvement. Users like the facility, its functional, but dated and expectations are high. There is clear room for improvement. rated the experience as 4 or 567% rated the facility as 3 (middle of the road) 25% It’s not just a golf course – It’s a social hub. This is a community campus, whether the design reflects that or not. Food, views, tennis and casual gathering outranked traditional golf only upgrades. TOP USES62.5% say it’s Very Important (5/5) to be a year-round gathering place. The community sees the Aspen Golf Club as a shared civic space; food, views, and gathering matter as much as or more than golf. Opportunities exist to expand winter and shoulder season activation. • • Restaurant/Bar Golf Nordic Tennis Summer Use Winter Use 72% 65% 46% 35% 23% 59% 31% TOP RANKED PRIORITIES • Expanded restaurant and bar • Improve golf facilities • Larger outdoor space with sunset views • Indoor tennis facility • Golf simulator • Indoor tennis/all-weather amenities are lacking; demand is for year-round use that complements outdoor space. Users prioritize daily function over operations. LOWER RANKED PRIORITIES • Public golf club repair and Nordic ski tuning area • Improved locker rooms and golf cart storage • Separate pro shops for golf and Nordic • Banquet and event facilities • Meeting rooms Walking 107 OPEN HOUSE Attachment C 108