HomeMy WebLinkAboutresolution.council.054-26RESOLUTION 4 M (Series of 2026) A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ASPEN, COLORADO, APPROVING A CHANGE ORDER BETWEEN THE CITY OF ASPEN AND PHIL VAUGHN CONSTRUCTION MANAGEMENT, INC. AND AUTHORIZING THE CITY MANAGER TO EXECUTE SAID CHANGE ORDER Ol ON BEHALF OF THE CITY OF ASPEN, COLORADO. WHEREAS, there has been submitted to the City Council a Change Order 01 to the contract between Phil Vaughn Construction Management, Inc. and the City of Aspen for Aspen Recreation Center Facility Improvements construction management services, a true and accurate copy of which is attached hereto as Attachment "B-1 "; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ASPEN, COLORADO, That the City Council of the City of Aspen hereby approves Change Order 01 to the contract between Phil Vaughn Construction Management, Inc. and the City of Aspen for Aspen Recreation Center Facility Improvements construction management services., a copy of which is annexed hereto and incorporated herein, and does hereby authorize the City Manager to execute said agreement on behalf of the City of Aspen. RESOLVED, APPROVED, AND ADOPTED FINALLY by the City Council of the City of Aspen on the 28th day of April 2026. ww)WR�m John Doyle, Mayo/Pro Tem I, Nicole Henning, duly appointed and acting City Clerk do certify that the foregoing is a true and accurate copy of that resolution adopted by the City Council of the City of Aspen, Colorado, at a meeting held, April 28', 2026. Nicole Henning, Ci�y Clerk Page 1 of 5 Phil Vaughan Construction Management, Inc. 1038 County Road 323 Rifle, CO 81650 Phone: (970) 625-5350 Fax: (970) 625-4522 Email: phil@pvcmi.com Website: www.pvcmi.com March 8, 2026 Scott Chism, PLA, ASLA, GRP Director of Business Services | Parks and Open Space | Recreation | Golf | Culture City of Aspen Parks and Open Space 427 Rio Grande Place Aspen, CO 81611 Sent via email: scott.chism@aspen.gov Dear Scott, Please find below a proposal for Construction Management as Advisor services for the City of Aspen- Aspen Recreation Center capital facility improvements. As discussed on 3/2/26, the proposal accounts for the amount of the 7/1/25 Professional Services Contract Number 2025-258 that has not been expended to date. PVCMI has an executed professional services contract with the City of Aspen for Construction Management as Advisor services on an as-needed basis via City of Aspen Contract No. 2025- 042-02- ANCI369324 dated 4/1/25. Work Scope 100% Construction documents dated 1/30/26 have been prepared by Rosenfeld Design. The Guaranteed Maximum Price Proposal dated 2/24/26 has been prepared by PNCI Construction, Inc. Schedule PNCI Construction, Inc. has prepared the attached 2/10/26 revision of the Construction Schedule. June 1, 2026 through 9/30/26. Page 2 of 5 General Project Plan and Tasks 1. Pre-Construction 2. Construction 3. Commissioning and Closeout 4. Warranty- 2 year PVCMI Estimated Services Note: Travel time and mileage shared between projects if Phil Vaughan is in Aspen on another project. 1. Pre-Construction Services- March 9, 2026 to May 31, 2026 a. 12 weeks x 15 hours/week= 180 hours for project coordination and meetings. 12 weeks x 1 trip per week @ 4.5 hours= 54 hours Pre-Construction Service- Estimated hours: 234 hours @ $95/hr.= $22,230.00 b. 154 miles round-trip from Rulison to Aspen x 12 estimated trips= 1,848 miles @ $0.65/mile= $1,201.00 c. Other expenses: PNCI Construction, Inc. and Rosenfeld Design preparation of trench drain and concrete reinforcement submittals and review. $5,750.00 d. Copies- Estimated cost of $2,000.00 Total Estimated Pre-Construction Services: $31,181.00 Page 3 of 5 2. Construction- June 1, 2026 to September 30, 2026 a. 17 weeks x 5 days per week on-site= 85 days 85 days x 13 hours per day= 1,105 hours Includes an estimated 4.5 hours per day round-trip travel time from Rulison to Aspen Monday, Tuesday, Wednesday, Friday (Saturdays dependent upon PNCI Construction, Inc. work on-site) b. Paperwork review/preparation 1 day per week (off-site). 17 days x 9 hours= 153 hours Construction- Estimated hours: 1,258 hours @ $95/hr.= $119,510.00 c. 154 miles round-trip from Rulison to Aspen x 85 estimated trips= 13,090 miles @ $0.65/mile= $8,508.00 d. Copies- Estimated cost of $4,500.00 Total Estimated Construction Services: $132,518.00 3. Commissioning and Closeout- 10/1/26 to 10/15/26 a. Estimated hours: 40 2 weeks x 1 trip per week @ 4.5 hours= 9 hours Pre-Construction Service- Estimated hours: 49 hours @ $95/hr.= $4,655.00 b. 154 miles round-trip from Rulison to Aspen x 2 estimated trips= 308 miles @ $0.65/mile= $200.00 c. Copies- Estimated cost of $200.00 Total Estimated Commissioning and Closeout Services: $5,055.00 4. Warranty- 2 years- July 2028 in preparation for September 2028 2 year warranty a.Estimated hours: 40 2 weeks x 1 trip per week @ 4.5 hours= 9 hours Warranty- Estimated hours: 49 hours @ $95/hr.= $4,655.00 b.154 miles round-trip from Rulison to Aspen x 2 estimated trips= 308 miles @ $0.65/mile= $200.00 c.Copies- Estimated cost of $200.00 Total Estimated Warranty Services: $5,055.00 Estimated Total Services: $173,809.00 Page 4 of 5 Remaining balance from the July 1, 2025- City of Aspen/Phil Vaughan Construction Management, Inc. Contract No. 2025-258 ($31,000.00) Net Total Estimated Services: $142,809.00 Additional services: We propose to provide services on an hourly basis as per the attached PVCMI 2026 Fee Schedule. Thank you for the opportunity to serve you. Please contact me if you have questions. Sincerely, Philip B. Vaughan President Phil Vaughan Construction Management, Inc. Attachment: PNCI Construction, Inc.- 2/10/26 revision of the Construction Schedule. Page 5 of 5 Phil Vaughan Construction Management, Inc. Fee Schedule City of Aspen- As-Needed Construction Manager as Advisor 2026 Construction Services Plan Review $95.00/hour Design and Estimation $95.00/hour Meetings/Discussions $95.00/hour Construction Management/ Scheduling $95.00/hour Travel $95.00/hour + .65 mile Out-of-pocket expenses Cost of expense plus 15% Miscellaneous Charges Photocopies 8.5x11 $0.30/each Photocopies 8.5x11-color $0.75/each Photocopies 11x17 $0.40/each Color 11x17 $1.25/each Blackline/Blueline Prints $3.00/each 24”x36” Mylar Sepias $24.00/each Presentation Binding Cost of expense plus 15% Color Plots- D size $22.00/each D size scans $2.50/each 8.5x11 scans $0.35/each Flash Drives- 8GB $43.00/each ID Name Duration Start Finish % Complete 1 ARC Improvements 2026 Construction 88 days Mon 6/1/26 Wed 9/30/26 0% 2 Phase 1 Pool Deck Replacements & Plumbing Repairs 88 days Mon 6/1/26 Wed 9/30/26 0% 3 Mobilization 5 days Mon 6/1/26 Fri 6/5/26 0% 4 Install Protections Int/Ext 8 days Mon 6/1/26 Wed 6/10/26 0% 5 Pool Slab Sawcutting 10 days Mon 6/8/26 Fri 6/19/26 0% 6 Concrete Demo/ Removal 10 days Mon 6/15/26 Fri 6/26/26 0% 7 Vac Excavation Ops 5 days Mon 6/29/26 Fri 7/3/26 0% 8 Family Pool Subgrade Stabilization/ Trench Drains 5 days Mon 7/6/26 Fri 7/10/26 0% 9 Family Pool Slab Prep 5 days Mon 7/13/26 Fri 7/17/26 0% 10 Family Pool Deck Placements 5 days Mon 7/20/26 Fri 7/24/26 0% 11 Protections Removals/ Cleaning @ Fam Pool 5 days Mon 7/27/26 Fri 7/31/26 0% 12 Lap Pool Saw Cutting- Alt Deck Detail 10 days Mon 7/6/26 Fri 7/17/26 0% 13 Lap Pool Edge Demo- Alt Deck Detail 10 days Mon 7/13/26 Fri 7/24/26 0% 14 Lap Pool Pipe Supports/ Repairs 5 days Mon 7/20/26 Fri 7/24/26 0% 15 Lap Pool Edge Detail- Concrete Forming 10 days Mon 7/20/26 Fri 7/31/26 0% 16 Lap Pool Subgrade Stabilization/ Deck Trench Drains 5 days Mon 7/27/26 Fri 7/31/26 0% 17 Lap Pool Slab Prep 5 days Mon 8/3/26 Fri 8/7/26 0% 18 Lap Pool Deck Placements 5 days Mon 8/10/26 Fri 8/14/26 0% 19 Protections Removals/ Cleaning 10 days Mon 8/10/26 Fri 8/21/26 0% 20 Phase 2 Pool Refinish 25 days Mon 8/17/26 Fri 9/18/26 0% 21 Lap Pool Refinish Scope 15 days Mon 8/17/26 Fri 9/4/26 0% 22 Lap Pool Gutter Waterproofing Scope 5 days Mon 9/7/26 Fri 9/11/26 0% 23 Lap Pool Gutter Cover Install 5 days Mon 9/14/26 Fri 9/18/26 0% 24 Pool Deck Prep & Sealing 3 days Mon 9/21/26 Wed 9/23/26 0% 25 Punch List 5 days Thu 9/24/26 Wed 9/30/26 0% 26 Completion and Turnover 0 days Wed 9/30/26 Wed 9/30/26 0% 27 Facility Open for Public Use 0 days Wed 9/30/26 Wed 9/30/26 0% 28 Phase 2 Boiler Rm Slab Replacements & Plumbing Repairs 23 days Mon 8/31/26 Wed 9/30/26 0% 29 MEP Equip Disconnects 2 days Mon 8/31/26 Tue 9/1/26 0% 30 Boiler Room Equipment Removals 2 days Tue 9/1/26 Wed 9/2/26 0% 31 Concrete Sawcutting 2 days Thu 9/3/26 Fri 9/4/26 0% 32 Concrete Demo/ Removal 2 days Mon 9/7/26 Tue 9/8/26 0% 33 Hydrovac Gravel Removal 2 days Wed 9/9/26 Thu 9/10/26 0% 34 Prep for structural import/ fill 1 day Fri 9/11/26 Fri 9/11/26 0% 35 Install Flowable Fill Materials 1 day Mon 9/14/26 Mon 9/14/26 0% 36 MEP Underground Installations & Inspections 3 days Tue 9/15/26 Thu 9/17/26 0% 37 Structural Slab Prep 3 days Fri 9/18/26 Tue 9/22/26 0% 38 Structural Slab Placement 1 day Wed 9/23/26 Wed 9/23/26 0% 39 Equipment Pad Prep 1 day Thu 9/24/26 Thu 9/24/26 0% 40 Equipment Pad Placement 1 day Fri 9/25/26 Fri 9/25/26 0% 41 Boiler Room Equipment Installations 3 days Mon 9/28/26 Wed 9/30/26 0% 42 Boiler Room Equipment MEP Connections 4 days Fri 9/25/26 Wed 9/30/26 0% 43 Boiler Room Complete- Equip Back in Service 0 days Wed 9/30/26 Wed 9/30/26 0% 6/1 9/30 ARC Improvements 2026 Construction 6/1 9/30 Phase 1 Pool Deck Replacements & Plumbing Repairs 43 days 8/17 9/18 Phase 2 Pool Refinish Completion and Turnover 9/30 Facility Open for Public Use 9/30 8/31 9/30 Phase 2 Boiler Rm Slab Replacements & Plumbing Repairs Boiler Room Complete- Equip Back in Service 9/30 4/5 4/12 4/19 4/26 5/3 5/10 5/17 5/24 5/31 6/7 6/14 6/21 6/28 7/5 7/12 7/19 7/26 8/2 8/9 8/16 8/23 8/30 9/6 9/13 9/20 9/27 10/410/1110/1810/2511/1 11/811/15 April May June July August September October November Critical Task Milestone Slack Summary Progress Aspen Recreation Center Improvements Project 2026 Schedule Tue 2/10/26