Page: 3
Author: pjm
File Name: PlanSet.209EBleeker.2017.12.pdf
Is there an existing
encroachment license for this
gate?
PlanSet.209EBleeker.2017.12.pdf (47)
Page: 3
Author: pjm
File Name: PlanSet.209EBleeker.2017.12.pdf
Show more existing grading on
the survey for within the property
boundary and in the ROW
adjacent to Bleeker.
Page: 3
Author: pjm
File Name: PlanSet.209EBleeker.2017.12.pdf
Call out monuments, reference
monument or witness to the
corners at all property corners.
Page: 6
Author: pjm
File Name: PlanSet.209EBleeker.2017.12.pdf
Is the CMU retaining wall and
fence property of 209 E Bleeker?
It straddles the property line,
verify that this development has
the right to remove.
Page: 6
Author: pjm
File Name: PlanSet.209EBleeker.2017.12.pdf
Water main will need to be
located prior to permit issuance
to determine sawcut and
patching extents.
Is there an existing
encroachment license
for this gate?
Show more existing
grading on the survey
for within the property
boundary and in the
ROW adjacent to
Bleeker.
Call out monuments,
reference monument
or witness to the
corners at all property
corners.
Is the CMU retaining
wall and fence
property of 209 E
Bleeker? It straddles
the property line,
verify that this
development has the
right to remove.
Water main will need
to be located prior to
permit issuance to
determine sawcut and
patching extents.
Page: 6
Author: pjm
File Name: PlanSet.209EBleeker.2017.12.pdf
What extent into Bleeker St will
the sawcut need to go? The joint
will need to be out of the wheel
path.
Page: 6
Author: pjm
File Name: PlanSet.209EBleeker.2017.12.pdf
Call out existing water service
line to be abandoned at the main
per COA Water Department
standards vs. capped at the
main.
Page: 7
Author: pjm
File Name: PlanSet.209EBleeker.2017.12.pdf
If Parks requires this to be a
floating sidewalk, please call out
length required for the floating
sidewalk.
Page: 7
Author: pjm
File Name: PlanSet.209EBleeker.2017.12.pdf
Is curb and gutter planned to be
replaced along property front? If
not a C&G replacement
agreement will need to be
signed by property owner which
COA Engineering can provide.
Page: 10
Author: pjm
File Name: PlanSet.209EBleeker.2017.12.pdf
Drainage is not permitted to be
directed to alley unless there is
adequate infrastructure to route
runoff to the curb and gutter at
the end of the alley.
What extent into
Bleeker St will the
sawcut need to go?
The joint will need to
be out of the wheel
path.
Call out existing water
service line to be
abandoned at the main
per COA Water
Department standards
vs. capped at the
main.
If Parks requires this to
be a floating sidewalk,
please call out length
required for the floating
sidewalk.
YA
R
N
CI
TH
E
D
E
S
I
G
N
S
S
H
O
W
N
H
E
R
E
I
N
I
N
C
L
U
D
I
N
G
AL
L
T
E
C
H
N
I
C
A
L
D
R
A
W
I
N
G
S
,
G
R
A
P
H
I
C
EP
R
E
S
E
N
T
A
T
I
O
N
&
M
O
D
E
L
S
T
H
E
R
E
O
F
,
A
R
E
Is curb and gutter
planned to be replaced
along property front? If
not a C&G
replacement
agreement will need to
be signed by property
owner which COA
Engineering can
provide.
Drainage is not
permitted to be
directed to alley unless
there is adequate
infrastructure to route
runoff to the curb and
gutter at the end of the
alley.
Page: 10
Author: pjm
File Name: PlanSet.209EBleeker.2017.12.pdf
Verify the utility and alley work
will not require regrading and
that the post construction
conditions will match existing.
Page: 10
Author: pjm
File Name: PlanSet.209EBleeker.2017.12.pdf
Drainage report calls out the site
to be raised 3', survey compared
to grading sheet shows roughly
1' grade change. Clearly show
where the 3' change occurs.
Drainage report calls out 59%
imperviousness for the site on
page 9, based on the site plan it
appears that more than 59% of
the site is impervious, (roughly
79% imperviousness). Please
revise the calculations and
drainage report to reflect this.
Page: 10
Author: pjm
File Name: PlanSet.209EBleeker.2017.12.pdf
Page: 10
Author: pjm
File Name: PlanSet.209EBleeker.2017.12.pdf
Ensure asphalt patch meets
requirements of the COA
Engineering Construction and
Excavation standards.
Page: 10
Author: pjm
File Name: PlanSet.209EBleeker.2017.12.pdf
Is this curb proposed to protect
the property from alley
drainage? A curb is not required
in the alley. Is this catch or spill
curb? Specify Type A or type B.
Verify the utility and
alley work will not
require regrading and
that the post
construction conditions
will match existing.
12/08/2017
Drainage report calls out the site to be raised 3', survey compared to grading sheet shows
roughly 1' grade change. Clearly show where the 3' change occurs.
Drainage report calls out 59% imperviousness for the site on page 9, based on the site plan
it appears that more than 59% of the site is impervious, (roughly 79% imperviousness).
Please revise the calculations and drainage report to reflect this.
Ensure asphalt patch
meets requirements of
the COA Engineering
Construction and
Excavation standards.
Is this curb proposed
to protect the property
from alley drainage? A
curb is not required in
the alley. Is this catch
or spill curb? Specify
Type A or type B.
Page: 10
Author: pjm
File Name: PlanSet.209EBleeker.2017.12.pdf
With a 1.5' transition from TOW
to tree well, how will runoff from
the tree well be routed to the
ROW and City's infrastructure?
Page: 10
Author: pjm
File Name: PlanSet.209EBleeker.2017.12.pdf
Call out more grading in this
area to ensure it is constructed
properly.
Page: 10
Author: pjm
File Name: PlanSet.209EBleeker.2017.12.pdf
Show spot elevations along
TBOC to show 2%% slope of the
buffer are
Page: 10
Author: pjm
File Name: PlanSet.209EBleeker.2017.12.pdf
How will the swale FL be
maintained below the vegetation
and near the window well?
Swales are LID routing
technique, not a WQCV
treatment option.
Page: 10
Author: pjm
File Name: PlanSet.209EBleeker.2017.12.pdf
To clarify, what does FGW stand
for? It is not called out in this
note. Final grade of wall?
With a 1.5' transition
from TOW to tree well,
how will runoff from the
tree well be routed to
the ROW and City's
infrastructure?
Call out more grading in
this area to ensure it is
constructed properly.
Show spot elevations
along TBOC to show
2%% slope of the
buffer are
How will the swale FL
be maintained below
the vegetation and
near the window well?
Swales are LID routing
technique, not a
WQCV treatment
option.
To clarify, what does
FGW stand for? It is
not called out in this
note. Final grade of
wall?
Page: 10
Author: pjm
File Name: PlanSet.209EBleeker.2017.12.pdf
What is the flow path for
drainage leaving this gravel
bed? Show that neighboring
property is not impacted and that
there is a clear drainage path to
the end of the alley.
Page: 10
Author: pjm
File Name: PlanSet.209EBleeker.2017.12.pdf
No steps in the ROW per
Engineering Design Standards.
Page: 10
Author: pjm
File Name: PlanSet.209EBleeker.2017.12.pdf
Swale capacity (open channel
flow) calcs in the drainage report
call out a slope of 0.02, should
this be 2?
A top width of 4 is called out,
how will that be accommodated?
Page: 10
Author: pjm
File Name: PlanSet.209EBleeker.2017.12.pdf
Due to maintenance and
mechanical issues that are
introduced when pumps are
used in a private system,
Engineering prefers alternate
solutions to be explored. Could
a planter or gravel bed type BMP
be used to treat runoff in this
basin?
Page: 10
Author: pjm
File Name: PlanSet.209EBleeker.2017.12.pdf
Clearly show what grading is
required to accomplish this task.
Grading within the dripline of the
existing trees will not be
permitted
What is the flow path
for drainage leaving
this gravel bed? Show
that neighboring
property is not
impacted and that
there is a clear
drainage path to the
end of the alley.
No steps in the ROW
per Engineering
Design Standards.
Swale capacity (open
channel flow) calcs in
the drainage report call
out a slope of 0.02,
should this be 2?
A top width of 4 is
called out, how will that
be accommodated?
Due to maintenance
and mechanical issues
that are introduced
when pumps are used
in a private system,
Engineering prefers
alternate solutions to
be explored. Could a
planter or gravel bed
type BMP be used to
treat runoff in this
basin?
Clearly show what
grading is required to
accomplish this task.
Grading within the
dripline of the existing
trees will not be
permitted
Page: 11
Author: pjm
File Name: PlanSet.209EBleeker.2017.12.pdf
Is this sized for WQCV treatment
for basin 3? Calculations need to
be provided. If this is intended to
function as a pervious paver sub
base (gravel bed) for treatment,
it shall follow the the spec in the
URMP.
Page: 11
Author: pjm
File Name: PlanSet.209EBleeker.2017.12.pdf
How will a 2' pan be installed in
a 1.17' setback?
Page: 11
Author: pjm
File Name: PlanSet.209EBleeker.2017.12.pdf
What is the WQ treatment on
basin 3? The drainage report
calls out a green roof does this
treat the WQCV for this basin?
Runoff is only permitted to drain
to alley if there is adequate
conveyance to the City's
infrastructure (c&g or storm
inlet).
Page: 11
Author: pjm
File Name: PlanSet.209EBleeker.2017.12.pdf
Provide a cross section of what
the 2' concrete pan, property line
and edge of building. The
grading for this needs to be
determined prior to issuance of
permit. Coordination with project
engineer shall be done prior to
building permit issuance.
Page: 11
Author: pjm
File Name: PlanSet.209EBleeker.2017.12.pdf
Show the swale for upper level
of basin 3 routing. WQCV
treatment is required.
Is this sized for WQCV
treatment for basin 3?
Calculations need to
be provided. If this is
intended to function as
a pervious paver sub
base (gravel bed) for
treatment, it shall
follow the the spec in
the URMP.
How will a 2' pan be
installed in a 1.17'
setback?
What is the WQ treatment on
basin 3? The drainage report
calls out a green roof does
this treat the WQCV for this
basin? Runoff is only
permitted to drain to alley if
there is adequate
conveyance to the City's
infrastructure (c&g or storm
inlet).
Provide a cross section of what the 2'
concrete pan, property line and edge of
building. The grading for this needs to be
determined prior to issuance of permit.
Coordination with project engineer shall
be done prior to building permit issuance.
Show the swale for upper level
of basin 3 routing. WQCV
treatment is required.
Page: 11
Author: pjm
File Name: PlanSet.209EBleeker.2017.12.pdf
Can pervious pavers be used
onsite to reduce impervious area
and treat WQCV?
Page: 11
Author: pjm
File Name: PlanSet.209EBleeker.2017.12.pdf
Westerly property limit not
easterly.
Page: 11
Author: pjm
File Name: PlanSet.209EBleeker.2017.12.pdf
Tree wells are not an approved
WQCV technique per the COA
URMP. Please provide a design
that incorporates a BMP outlined
in Chapter 8 of the URMP or
demonstrate how all of those
options cannot be used on this
site.
Page: 11
Author: pjm
File Name: PlanSet.209EBleeker.2017.12.pdf
What is the WQCV treatment in
basin 4? Drainage report calls
out that runoff drains to Bleeker
St, required WQCV treatment
first.
Page: 11
Author: pjm
File Name: PlanSet.209EBleeker.2017.12.pdf
This storm line was sized at
100% full, per the URMP it shall
be sized for 80% full conditions
to determine diameter. In this
case the size of the pipe is
adequate but for future reference
please use 80%.
Can pervious pavers be
used onsite to reduce
impervious area and treat
WQCV?
Westerly property limit
not easterly.
B
Tree wells are not an approved WQCV
technique per the COA URMP. Please
provide a design that incorporates a
BMP outlined in Chapter 8 of the
URMP or demonstrate how all of those
options cannot be used on this site.
What is the WQCV
treatment in basin 4?
Drainage report calls
out that runoff drains to
Bleeker St, required
WQCV treatment first.
This storm line was
sized at 100% full, per
the URMP it shall be
sized for 80% full
conditions to
determine diameter. In
this case the size of
the pipe is adequate
but for future reference
please use 80%.
Page: 11
Author: pjm
File Name: PlanSet.209EBleeker.2017.12.pdf
If the green roof is treating
WQCV for basin 3 provide cals
for sizing per URMP. Provide a
detail to ensure treatment is met.
Page: 11
Author: pjm
File Name: PlanSet.209EBleeker.2017.12.pdf
Drainage report calls out under
section 1.7 that Lot B also may
contribute offsite drainage to 209
E Bleeker, show this in the basin
delineation.
Page: 13
Author: pjm
File Name: PlanSet.209EBleeker.2017.12.pdf
This needs to be worked out
prior to issuance of permit, all
exterior routing shall be shown
on the utlitity plan. Any in field
changes will require a change
order.
Page: 13
Author: pjm
File Name: PlanSet.209EBleeker.2017.12.pdf
Is one water service line to serve
both buildings? Water
Department recommends one
service line per residence to
prevent future access and
maintenance issues with
separate owners.
Page: 13
Author: pjm
File Name: PlanSet.209EBleeker.2017.12.pdf
How will the force main be
installed so close to the
property? What is preventing the
force main from eroding the soils
inside the retaining wall?
If the green roof is
treating WQCV for
basin 3 provide cals for
sizing per URMP.
Provide a detail to
ensure treatment is
met.
Drainage report calls out under
section 1.7 that Lot B also may
contribute offsite drainage to 209
E Bleeker, show this in the basin
delineation.
This needs to be worked out prior to issuance of
permit, all exterior routing shall be shown on the
utlitity plan. Any in field changes will require a
change order.
Is one water service
line to serve both
buildings? Water
Department
recommends one
service line per
residence to prevent
future access and
maintenance issues
with separate owners.
How will the force main
be installed so close to
the property? What is
preventing the force
main from eroding the
soils inside the
retaining wall?
Page: 13
Author: pjm
File Name: PlanSet.209EBleeker.2017.12.pdf
How does the water service line
connect to the mechanical
room? It appears that an
uncontrolled line will be routed
through the interior of the
building prior to reaching the
mechanical room in the
basement.
Page: 13
Author: pjm
File Name: PlanSet.209EBleeker.2017.12.pdf
Provide fire flow calculations that
support that a 4" water service
line is needed. Residential
properties typically require a 1.5"
or 2" lines at max.
Page: 13
Author: pjm
File Name: PlanSet.209EBleeker.2017.12.pdf
How will the 90 degree vertical
bend be kept clean of debris
build up?
Page: 13
Author: pjm
File Name: PlanSet.209EBleeker.2017.12.pdf
Since extensive alley and utility
work is required for this property
can the cable and telephone
connections be installed without
the added infrastructure of a
splice vault and to limit future
conflicts and needs for this
alley? The routing currently
shown does not appear to be the
most efficient use of the ROW.
Page: 14
Author: pjm
File Name: PlanSet.209EBleeker.2017.12.pdf
How will the foundation drain be
installed with out impacting
neighboring property?
How does the water
service line connect to
the mechanical room?
It appears that an
uncontrolled line will
be routed through the
interior of the building
prior to reaching the
mechanical room in
the basement.
Provide fire flow
calculations that
support that a 4" water
service line is needed.
Residential properties
typically require a 1.5"
or 2" lines at max.
How will the 90 degree
vertical bend be kept
clean of debris build
up?
Since extensive alley
and utility work is
required for this
property can the cable
and telephone
connections be
installed without the
added infrastructure of
a splice vault and to
limit future conflicts
and needs for this
alley? The routing
currently shown does
not appear to be the
most efficient use of
the ROW.
How will the foundation
drain be installed with
out impacting
neighboring property?
Page: 16
Author: pjm
File Name: PlanSet.209EBleeker.2017.12.pdf
Provide a swale detail for both
swales onsite.
Page: 101
Author: pjm
File Name: PlanSet.209EBleeker.2017.12.pdf
Snowmelt in ROW shall be on a
separate zone.
Provide a swale detail
for both swales onsite.
VER CONCRETE-
ELT; RE: 6/L.5.01
ARDEN
Snowmelt in ROW
shall be on a separate
zone.